Civil Construction Manager at Hyundai Engineering & Construction Co., Ltd., PLC Refinery, Venezuela


Last Updated: 15th September 2017 (over 5 years ago)

Address
Guatire, Venezuela

E-mail
Locked

Phone Number
Locked

Qualification Level
Masters

Languages
English, Spanish

Summary

PMP®, Civil Engineer "Andrés Bello Catholic University (UCAB) Caracas, Venezuela 1991,Post graduate Degree in Project Management UCAB 2008,with 26 years experience in Engineering - Procurement - Construction projects (EPC) for the Oil& Gas industry, private Construction and government organizations, performing different PMC activities in multi-disciplinary projects, such as project management, construction management, construction superintendent, supervision, time and cost control, inspection, planning, scheduling, procurement and project control.

Education

PMI
PMP

   Jun 2014
— Jun 2017

Project Manager Professional - PMP, International Certification by Project Management Institute (PMI)

Catholic Andres Bello University, UCAB
Project Management Specialist

   Mar 2006
— Dec 2008

Master Degree in Project Management (MScPM), UCAB, Caracas, Venezuela.

Catholic Andres Bello University, UCAB
Civil Engineer Degree

   Oct 1984
— Jul 1991

Bachelor Degree in Civil Engineering (BsCE), UCAB, Caracas, Venezuela.

Experience

Hyundai Engineering & Construction Co., Ltd.
Civil Construction Manager

   Jan 2017
— Current

Deep Conversion Project Phase II PLC Refinery Anzoátegui state, Venezuela. Estimated Cost 8.000 MM USD - Oil refinery Brownfield and Greenfield Construction - Responsible of Civil works Management and interfaces coordination for Phase II of the project (HPC Project). Interface coordination between Eng- Const, Proc -Const, Const - Star up.

INELECTRA
Construction Superintendent, PMC team

   Jan 2012
— Jan 2017

EPMC "Deep Conversion Project, PLC Refinery, Venezuela" Project conducted by "Petroleos de Venezuela (PDVSA) with Consortium Venezuelan - Japanese CONFEED (JGC – CHIYODA - INELECTRA)/ Phase II Site preparation. Total Estimated cost: 6.000 MM USD.

Job Location: Puerto la Cruz Refinery, Anzoategui state, Venezuela
Construction Experience:
Sub-Project EW40.1- “Gas pipe lines Construction/ Relocation” General Supervision and management to successfully Execution work Construction of relocation Gas lines pipe 26", 12" and 8", on time, budget and quality (1year duration)
Sub-Project EW29.2- “Extra heavy load Jetty construction, for discharge Refinery Equipment”, General Supervision and management to successfully Execution work,carbon steel bored piles 36”, 2000m2 platform, construction and 750m roadway execution, on time, budget and quality (9 months duration)
Sub-Project EW46–“Site Preparation of new Gas Spheres Construction” General supervisionand management to successfully execution work, on time, budget and quality (7 months duration)
Sub-Project EW13.1- “Site Preparation Construction for Administrative Area Facilities” General supervisionand management to successfully execution work of Underground facilities construction, drainage channels, embankment, Concrete Bridge and road way construction, on time, budget and quality (9 months duration)
Sub- Project EW 08-“Tanks Yard Construction for El Chaure Refinery Unit 98”, Management to execution work of a Tanks Yard construction for 7 Oil Tanks, earth movement, concrete and asphalt slope protection, drainage channels, Roadways and Relocation of electric & fiber optic installation (Current)

PMVCA, PDVSA Industrial Subsidiary
Site Manager

   Jan 2010
— Jun 2011

EPC Project: “Chinese-Venezuelan Oil Drills Factory Headquarter Construction”

Job Location:Caracas, Venezuela
Construction Experience:
General supervision and leading a multidisciplinary project team (Engineering, Procure, Construction, Quality, Safety, Planning, Cost Control and Human Resources personal), monitoring time and cost baseline successfully.

Flint Petroleum service
Project Engineer

   Jun 2003
— May 2005

EPC Project “Workshop construction for repair and maintenance of oil drills”

Job Location: El Tigre, Anzoategui state, Venezuela
Construction Experience:
Coordination, advice and Management of multidisciplinary construction activities, from bid package preparation & procurement monitoring up to begin the workshop construction. Project Stopped for change in the company owners.

VEPICA
Field Engineer

   Sep 2002
— May 2003

EPC Valcor Up Grader Project, PLC Refinery, Venezuela Sept
Client "Petroleos de Venezuela (PDVSA), trough Consortium CONVALVEN (NIKKI-CHIYODA-JANTESA-VEPICA). Estimated cost: 530 MM USD.

Job Location: Puerto la Cruz Refinery, Anzoategui state, Venezuela
Construction Experience:
Verification and redesign of structural foundations in order to solve interference between structural elements and underground installations, achieving considerable time reduced, with the problems solution.Project stopped for contractual disagreement between JGC & PDVSA.

JANTESA
Underground Piping Supervisor

   Jun 1999
— May 2001

EPCCerro Negro Up Grader Project, Jose, Anzoátegui State, Venezuela June 1999 – May 2001
Project conducted in English for "Petroleos de Venezuela (PDVSA), through Consortium CONCENEGRO (NIKKI- JANTESA-VEPICA). Estimated cost: 1420 MM USD. Project Successfully finished on time, budget and quality.

Job Location:Jose complex, Anzoátegui state, Venezuela
Construction Experience:
Coordination, inspection and successfully supervision of the mechanical and civil works associated for oily water drainage system and fire water system construction, in all the areas (Naphtha, Amine, Sulphur, Utility, Cocker, waste Water, Tanks and Flare). 80 Miles of carbon steel pipe underground and above ground, 420.000 welding inch and coating. (Spools fabrication at shop and welding pipe line on site), prefabricated manholes installation.

VINCCLER
Construction Superintendent

   Apr 1998
— Sep 1999

EPCPetrozuata Vehop Downstream Project.
Up Grader Project conducted in English for "Petroleos de Venezuela (PDVSA Conoco Phillips and Exxon Mobil joint Venture. Estimated cost 1445 MM USD.Project successfully finished

Job Location: Jose complex, Anzoátegui state, Venezuela
Construction Experience:
Construction Coordination and Supervision of 550.000 m3 Earth moving, 83.000 m3 Reinforced concrete structures in all operational areas (Naphtha, Amine, Sulphur, Utility, Cocker, waste Water, Tanks and Flare), 80miles of Underground reinforced concrete pipe installation and associated civil works, Underground carbon steel pipe installation, oily water drainage system, fire water systems and relevant mechanical works associated, Site preparation for the equipment set up. On time, budget and quality, (950 direct workers and 12 supervisors).

VINCCLER
Construction Manager

   Jan 1992
— Dec 1993

EPC METHANOL I Gas plant Jan 1992 – Dec 1993
Project conducted by PEQUIVEN – METOR through Japanese Venezuelan Consortium MITSUBISHI-INELECTRA.M ethanol gas plant production. Estimated cost: 500 MM USD. Project successfully finished.

Job Location: Jose complex, Anzoátegui state, Venezuela
Construction Experience:
Project "ADM 024. Underground electrical installation and civil works associated. "Construction Supervision cabling, connection and testing of 288miles of cables in all areas of the plant (low, medium and high tension) and the underground main electrical installation, three lines, 34,500 volts into three sectors, with the 9 execution joints. It achieved the objectives according with the client satisfaction.
EPC METHANOL II Gas plant
Pequiven, (Jose Petrochemical complex). ENI ltd co (Snamprogetti) and PDVSA Joint Venture Jose, Anzoátegui state. Estimated cost: 430 MM USD

Job Location: Jose complex, Anzoátegui state, Venezuela
Construction Experience:
Project "ADM 005. Main Electrical underground installation and civil works associated". Construction Supervision of Wiring and connection of 15miles cabling, from the Electrical main station up to the plant substation, three continued cables 250 MCM 15KV 13.800 volt. The objectives were achieving successfully.