Mechanical Engineer


Last Updated: 6th August 2018 (over 4 years ago)

Address
Brazil

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Masters

Languages
English, Portuguese

Summary

Great experience (more than 15 years) in Oil & Gas Industry (onshore and offshore), embark in all type of rigs and Wet/Dry Dock Coordinate. Compromissed with maintenance controls, targets, cost, safety and environment. Good communication and relationship. Capacity of integration with all disciplines teams, supervision and leadership of maintenance teams, installation and assembly projects. Assembly, commissioning and start-up of mechanical equipments, metallic structures, valves and pipes. Inspection and certification with all class and statutory requirements. Availability for travel and country change.

Education

Universidade Catolica de Petropolis
Postgraduate - Shipbuilding

   Mar 2013
— Mar 2015

Universidade Catolica de Petropolis
Postgraduate - Equipments On & Offshore

   Mar 2011
— Mar 2012

Universidade Catolica de Petropolis
Mechanical Engineer

   Feb 1998
— Dec 2004

Escola Tecnica Federal de Campos
Mechanical Technician

   Feb 1992
— Dec 1995

Experience

Ventura Petroleo
Rig Maintenance Engineer

   Feb 2013
— Current

Assist the Rig Manager with all subjects, mainly with regards to Equipments, Contract, Legislation, Regulations, Rig Performance, Asset.
Liaise with engineering support the Rig Manager.
Ensure all certificates, maintenance (KPI´s) and inspection program are updated and under controls.
Coordinate maintenance (Mechanical/Electrical/Welding) team during installation and maintenance jobs on the rig.
Monitoring of rig correspondence ensuring information is acted upon accordingly.
Make sure management of change process is followed, as per the company / statutory requirements.
Responsible for SSV-Louisiana Wet Dock in Salvador 2015/16/17, US$30 Million project. Rig out of contract and stopped (Warm Stacked).
Coordinate the SSV-Louisiana Wet Dock on Sep/2013, 28 days, US$25 Million project.
Assistance in planning, organization and participation of SSV Victoria Wet Dock on Feb/2014, 24 days, US$ 17 Million project.
Responsible for all modification projects for SSV-Louisiana.
Management of project/equipments since the survey, design, manufacture, installation, commissioning and start-up.
Ensure the projects are delivered according to the specification and up dated drawings, P&ID, etc.
Evaluate quotes and specifications from supplies, service-companies, workshops and shipyards.

Subsea7
Maintenance Engineer

   Aug 2011
— Jan 2013

Maintenance Supervisor of the workshop (mechanical, hydraulic, painting, welding - approx. 30 technicians).
Maintenance and assembly of hydraulic motors, hydraulic pumps, winches, cranes, hydraulic cylinders, hydraulic units, ROV, gearboxes, metallic structures (walkways, stairs), etc.
As built Projects (mechanical and metallic structures), Maintenance plan and work orders review.
Assistance and execution to all Subsea7 ships stop maintenance at ports in Brazil (shutdowns, dry/wet dock). Specially Seven Mar, Seven Phoenix, Acergy Harrier, Kommandor 3000, Toisa Conqueror, Acergy Sabia, Acergy Condor.

ABS Group
Mechanical Engineer

   Oct 2008
— Aug 2011

Accompaniment surveyors in Class/Flag inspections.
Accompaniment of certificates and Class/Flag pre audit onboard.
Elaboration chronograms of RBI (Risk Based Inspection).
Projects and repair in tanks, since the survey to installation according to Class requirements.
Survey, tests, installation, inspections onboard of the rigs.
Direct contact with client, especially with class and statutory requirements.

Techint
Mechanical Engineer

   Aug 2005
— Sep 2008

Project inspector of the rigs FPSO P-33 and P-35 (all disciplines).
Comments and verification projects (metallic structures and mechanics) for rigs P-18, P-19, P-20, P-26, P-27, P-32, P-33, P-35, P-37 and P-47, and embark in these units during equipments installation and start-ups.
Accompaniment contracted chronograms, curved S, construction, assembly, installation equipments, etc.
Calculation and project of metallic structures for the rigs, using the program of finite elements SAP2000.

Nortec Quimica
Chief Maintenance

   Feb 2003
— Jul 2005

Manager of Industrial Maintenance of the factory - Mechanics, electric, civil, painting and assembly of equipaments.
Preventive and corretive maintenance: centrifugal pumps, vacuum pumps, simple and double mechanical seal, electric motors, reactors (stainless steel and vitrified), gearboxes, exhaust system, air compressors, ammonia compressors, boilers, mills, tanks, valves, tubes, centrifuges, hydraulic units, pneumatic systems.
Especification for material purchase and nationalization pieces.
Follow projects, construction, installation and start up of the equipments for the new unit process (Unit 200) and efluent treatment station (Unit 500).
Elaboration lists of preventive maintenance and annual preventive maintenance plan for all equipments.

Search Jobs by Industry

Ad
Ad
Ad