
Land Surveyor
Last Updated: 6th September 2019 (over 3 years ago)
Summary
• B.Tech in Civil Engineering & Diploma in Survey engineering with 22 years 6 month (10+years in Abroad) Of rich & extensive experience in diversified project of construction industries Oil & Gas, Pipe Line, Power Plant, Steel Plant, High-rise Buildings, Roads & Bridge etc. as a Land Surveyor/Civil Supervisor.
• Currently associated with PETROFAC INTERNATIONAL LTD, UAE.
• Previous projects under ADCO (Abu Dhabi), ZADCO (Abu Dhabi), QP (Qatar), KOC (Kuwait), Nakheel (Dubai), TRANSCO (Fujairah) etc.
• Expertise in handling modern surveying instrument GPS, Total Station, Auto level etc.
• Proficient in AutoCAD.
• Exemplary relationship management, communication skills with the ability to network with project members, consultants, contractors, and statutory agencies with consummate ease.
• Over 10 years of extensive experience in Onshore/ Petrochemicals/ Refinery/Pipeline etc.
Education
Civil Engineering
Jan 2012
— Jan 2015
Land Surveying
Jun 1994
— Jun 1997
Experience
Land Surveyor
Oct 2009
— Current
Project 1- VRMP project, $200 Million, HPCL, Andhra Pradesh, India.
Project 2- ZADCO project, $3.8Billion, ZADCO, UAE.
Project 3- BAB Compression, $500Million, ADCO, UAE.
Project 4- KUWAIT - POWER DISTRIBUTION, KOC, Kuwait.
Project 5- Effluent Water Injection Phase-01&Sea Water Injection Phase-02,
$420 Million, KOC, Kuwait.
Project 6- ASAB FULL FIELD DEVELOPMENT, $2.3 Billion, ADCO, UAE
SRU, SFU, Compression station, well head, RMS, Flow line and transfer line, DGM Building, Sub Station, RMUSS, Cable route, CIPF, GC, Pipeline, well head, CDS, RDS, Flow Line, Transfer Line, Main Oil Line etc.
• Topographical Survey and Battery limit establishment for SRU and SFU unit.
• Traversing and establishing control station & Benchmark with high degree of accuracy.
• Supervision of Geotechnical survey.
• Support Project engineering for engineering survey of the existing & project facilities etc. for Engineering and construction.
• Supervision of Pilling work of around 2900 Pile as well as testing of Pile.
• Monitoring, Supervision & Inspection of regular construction activities including Civil and Survey.
• Executing all survey activities, handling equipment at various stages of projects.
• Coordinating with staff and sub-contractors on site for project progress.
• Scanning for underground utilities.
• Field verification of cable route and RMUSS location establishment.
• Establishment final alignment of cable route
• Cable route survey and Inspection of construction activities
• Maintain all survey documents & records by proper filing.
• Constructability check for 92 Km MOL pipeline corridor including Verification of all the FEED engineering survey data with Subcontractors Survey data and re-routing of pipeline route and pursue the approval process from Client.
• Pre-Construction survey with respect to IFC drawing to start the main construction work.
• Physical verification of all pipeline crossing.
• Bending survey for Pipeline.
• Preparing as-built drawing for 36’’ main oil line, 92km.
Sr. Land Surveyor
Aug 2005
— Oct 2009
Project 1- FWTS2 (64’’ Water Pipeline) Fujairah, Project Value, Transco, UAE
Project 2- JUMEIRAH PARK, $400Million, Nakheel, UAE
Project 3- DISCOVERY GARDENS, $250Million, Nakheel, UAE
Pumping Station, Pipeline, Valve Station, Villa Project, Multistoried Building etc.
• Responsible for leading the survey team.
• Establishment final alignment of Pipeline.
• Coordinating with staff and sub-contractors on site for project progress as well as administrate and Subcontractors Short summary of responsibilities/ duties
• Executing all survey activities, handling equipment at various stages of projects.
• Successfully attended the internal review meetings organized by the Project Director/construction manager/ Consultant/Client to appraise the progress and various problems, if any, in the project’s execution program.
• Traversing and establishing control station & Benchmark with high degree of accuracy
• Uploading and download of survey data form computer to Total Station.
• Conducting inspection of all survey activities at site with consultant and maintaining files of drawing, RFI, all survey document & records as per requirement of ISO 9001:2000.
Sr. Land Surveyor
Oct 2000
— Aug 2005
Project 1- SURAT MANOR TOLLWAY PROJECT, PACKAGE-1, INR500 Crore, NHAI, India.
Project 2- Gujarat State Energy Generation Ltd., INR140 Crore, GSEG, India
National Highway, Bridge, CCCP Power Plant (Gas Turbine, Stream Turbine, Cooling Tower, Sub Station etc.)
• Traversing and establishing control station & Benchmark with high degree of accuracy.
• Setting out and levelling work of Roads Subgrade, Subbase, CTUSG, GSB, WMM, DBM and BC layers.
• Setting out and levelling work of Bridge well foundation, Pier cap, Slab, Bearing Pad etc.
• Executing all survey activities.
• Topographical survey, contour survey and prepared L-section, X-Section of road.
• Prepare as-built drawing of Road and bridge.
• Setting out, Centerline and Level marking of various type of Power plat foundation like Gas Turbine, steam Turbine, Boiler, Pipe rack, Water Treatment Plant, Cooling Tower, Switch yard etc.
Land Surveyor
Aug 1998
— Oct 2000
Project 1- Nippon Denro Steel plant, INR2500 Crore, Nippon, Maharashtra, India
Project 2- N.I.N.L. STEEL PLANT, INR2000 Crore, Nilachal, Orissa, India.
Steel Plant (Main Stack, Switchyard, Blast Furnace, R.M.H.S., W.T.P., P.C.M., H.S.M., L.C.M., Oxygen plant, Pipe rack etc.)
• Layout, center line and Level marking for various types of foundation of Steel plant Main Stack, Switchyard, Blast Furnace, R.M.H.S., W.T.P., P.C.M., H.S.M., L.C.M., Oxygen plant, Coco van, W.T.P, Pipe rack etc.
• Verticality checking of chimney, structural columns etc.
• Topographical survey.
Asst.Land Surveyor
Jun 1997
— Aug 1998
Project 1- RAIPUR- KANAKTURA 400 K.V D/C TRANSMISSION LINE PROJECT, Power Grid, India
400KV double circuit Transmission Line
• Responsible for Detail engineering survey and Alignment of 400KV D/C Transmission line (425Km) for the power grid corporation of India ltd.
• Preparation of L- section, cross section and tower spotting on the drawing by sag template.
• Prepared BOQ for that transmission line.