Piping Engineer / Design


Last Updated: 8th November 2018 (over 3 years ago)

Address
Kuwait

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Degree

Languages
English, Filipino

Summary

RESUME

FRANCO P. FABAY
PIPING ENGINEER/DESIGN

CAREER SUMMARY

With twenty three (23) years of experience in Piping Design and Field Engineering Works of various Petrochemical, Oil and Gas Plant which start from FEED (front end engineering design), basic, conceptual & detailed piping layout/design of all onshore projects including estimation works both with EPC contractor and has the ability to handle piping designer/operator. Participate in 3D model review by all discipline, internal or w/ pmc either in the office or webcam/internet. Capable of checking all related information drawings such as pipe support design/location, structure/sleeper loading data, nozzle orientation, lug support location, MTO, plot plan, engineering isometric drawing, erection drawing and fabrication drawing by considering references such as P&ID/UHD PFD/Plot Plan and related works in accordance of client piping standard. Have background in some international codes such as ASME B31.3/B31.1/B31.8/B31.4. Coordinate and interface with other discipline and deals project carefully to complete at required schedule and capable of working different kind of people. With overseas piping design and field engineering experience across Japan(Chiyoda), Qatar(Chiyoda), Thailand(Chiyoda), Singapore(Chiyoda), South Korea(Samsung Engineering Co. Ltd),South Korea (SK Eng’g & Construction) and Kuwait (SK Eng’g and Construction).

SPECIAL SKILLS :
Operate Computer softwares:
PDMS Aveva Viewer in 3D model review Smart Plant Review/Design Review/Reality Review
Intergraph’s Plant Design System ( PDS ) 3D Cyclone Viewer
Bentley MICROSTATION Auto cad
Autopipe Ver. 6 Microsoft EXCEL for Windows
Microsoft WORD for Windows Power Point
Work Experiences:

Present Company : SK Engineering and Construction Co., Ltd
(Kuwait-assigned)
Position : FE – Piping Engineer
Inclusive Date : April 4, 2016 – May 5, 2018
Project : KNPC CFP Project, Minah Abdullah, Block No. 12, Kuwait

Duties/Responsibilities:
• Give assistance to construction group in all discipline in any problem encounter at site related to piping works or piping design.
• Participate in early morning joint site inspection with piping supervisor and discuss possible site problem related.
• Modify isometric drawing as per actual site condition and verify at 3D model viewer.
• Participate in piping supervisor short education meeting related to piping standard and support in order to have a uniform knowledge and interpretation.
• Give assistance to hydro test group in test packages preparation.
• Give assistance to construction group related to TIE-IN works.
• Coordinate with the PMC personnel if necessary.
• Participate in daily tool box/safety meeting with supervisor and worker.

Present Company : SK Engineering and Construction Co., Ltd.
(Head Office)
Position : Piping Engineer/Design
Inclusive Date : Jan 03, 2012 – January 2, 2016
: May 11, 2006 – May 9, 2009
Office Location : SK G. Plant, 100 Euljiro, Jung-gu, Seoul 100-847, Korea

Duties/Responsibilities:

• Checked 3D model by SPR(smart plant review), summarize and provide snap shot/comments and send to project lead of any not conform in the design base on client specification/standard.
• Attended 3D model review, internal or w/ all discipline including client/pmc by internet/webcam.
• Provide or checked 2D cad piping study drawing and other related information done by sub-contractor such as loading data of structure/sleeper, nozzle orientation, pipe support location, platform and support clip information, lug information, material take-off and other deliverable such as safety instruction sheet and On stream Inspection Point.
• Checked preliminary and final isometric drawing for issuance.
• Provide conceptual routing and layouts as reference for piping detail design of sub-contractors.
• Attended SITE survey including sub-contractor if necessary and provide query for any unclear documents/references to client pertaining to proposal projects.

Project Involved:

• CPF-Clean Fuel Project- KNPC Kuwait- September2015 – January 2, 2016
• Jazan Refinery Project- Aramco, Saudi Arabia- January 2013-August 2015
• YERP-Yanbu Export Project-Aramco,Saudi Arabia-January 2012-December 2012________
• HCK-IBL,Hydrocracking Center,SK Energy Incheon Complex-S. Korea- Nov.2008-May 2009
• RRC Upgrading Project,Rayong Refinery Public Company Ltd-Thailand-Jan.2008-May 2008
• LBP-Lube Base Oil Project,Pertamina Dumai Refinery,Indonesia-May 11,2006-June 2007

Previous Company : Samsung Engineering Co. Ltd
Position : Lead Senior Engineer
Inclusive Date : December 7, 2009 – December 6, 2011
Office Location : Samsung SEI Tower 467-14 Dogok 2 Dong, GangnamGu, Seoul, Rep. of Korea 135-856

Duties/Responsibilities
• Reviewed BEDD documents, piping design basis in preparation for piping detail design basis of sub-contractors.
• Checked 3D model by SPR, summarize and provide snap shot/comments and send to
project lead of any not conform in the design base on client specification/standard.
• Attended 3D model review, internal or all discipline including client/pmc via internet/webcam.
• Checked preliminary and final isometric drawing and material take-off done by sub-contractor.
• Provide or checked 2D cad piping layout study drawing and other related information
drawing done by sub-contractor by considering all latest information such as equipment,
p&id, instrument, structural, etc.and make sure it is conform to client specification and standard.
• Coordinate with other discipline from time to time and if necessary.

Project Involved:

• Rehabilitation and Adaptation Project-SKIKDA Refinery, Algeria-Dec. 2009-Dec.-2011

Previous Company : Chiyoda Philippines Corp.
(Chiyoda Corp. Japan-branch)
Position : Senior Engineer (Assigned as Group Leader)
Inclusive Date : March 23, 1995 – May 10, 2006
Office Location : Gen. Araneta St. corner Meralco Ave. Pasig City, Philippines

Duties/Responsibilities

• Assigned as Group Leader handling a group of junior piping engineer and operators.
• Monitor daily progress, participate in coordination meeting of other discipline as well as webcam
conference and inform junior piping design engineers of any new information related to projects.
• Involved in preparation of conceptual routing, layout up to piping detail design.
• Checked all related information drawing such equipment nozzle orientation, loading data(P/R, sleeper and lug support), Platform and Support Clip, Pipe Support foundation location and special pipe support drawings including preliminary and final isometric drawing. Attended 30%,60% and 90% model review.
• Provide response for any technical, site queries related to piping drawings and other related information drawings
Overseas Assignment( Chiyoda Corporation) –Japan- Head Office
• Qatar Liquified Gas Company-Qatar Gas II Dev.Project-3D Review, Sept 2005
• Estimate/Proposal Project, March-May 2004
• SSP Project- Al Jubail Saudi Arabia, June 1998- Sept. 1998
• PSR-2,Melaka Refinery Stage1, March 1995-September 1995

Overseas Assignment( Chiyoda Corporation) –Construction Site
• Thailand -TOM Expansion Project,TOC Thai Olefins Co. Ltd, Dec 2003-Feb. 2004
• Singapore-TPS-4, Teijin Polycarbonate Singapore Pte.Ltd, April 2002-Nov. 2002
• Singapore- EXXON Olefins Project,Kellogg Overseas-Chiyoda JV, Feb 2000- July 2000
• Ras Laffan Qatar- Qatargas LNG Project, April 1996-Oct. 1996

Domestic Assignment( Chiyoda Phil. Corp.) –Philippines
• Qatar Gas II Dev. Project,Qatar Liquified Gas Company , March 2005- May 2006
• SEG Project, Sakalin Russia, October 2004 – February 2005
• Al Khaleej Gas Project (State of Qatar), June-Sept. 2004
• LEX-Feed, Qatargas LNG Project-Qatar Petroleum and Exxon Mobil, Sept.-November 2003
• TOM Expansion Project,Thai Olefins Co.,Ltd,(Map Ta Phu Thailand), Feb 2003-August 2003
• Crude Splitter Unit, Taiyu Oil Company Ltd.(Kikoma Japan), Dec. 2002 – Jan. 2003
• TPS-4 (Teijin Polycarbonate Singapore Pte, Ltd., March 2001- March 2002
• TPS-3 (Teijin Polycarbonate Singapore Pte, Ltd., August 2000 to Feb. 2001
• SSP Project (Al Jubail Saudi Arabia), October 1998 to April 1999
• SCP-Saudi Chevron Petrochemical,Saudi Arabia, July 1997-June 1998
• PSR-2 Melaka Refinery Stage 1,Melaka Malaysia , Oct. 1995-March 1996

Overseas Assignment ( Chiyoda Japan head office / Construction Site ) - 4 years
Domestic Assignment (Philippine / Chiyoda Phil. Corp.) - 7 years

Previous Company : EEI Corporation
Position : Mechanical Engineer
Inclusive Date : September 1992-March 1995
Office Location : Manggahan Libis Quezon City, Philippines
Duties/Responsibilities
• Experienced in estimation works such as work scope clarification, site survey, manpower allocation, water supply, means of communication, material availability and equipment.
• Itemization of construction activities such as labor, project duration.
• Assisted construction group related to piping design and field engineering works.

EDUCATIONAL ATTAINMENT:
Bachelor of Science Degree in Mechanical Engineering- 1990
University of Nueva Caceres-Naga City, Camarines Sur,
Philippines Mechanical Engineer’s Licensure Exam., October 1990
Philippine Regulation Commission-Registered Mechanical Engineer, PRC No. 0043073

REFERENCES:

1.0 Mr. Jami H Oh
SKEC Plant Piping Team / Senior Manager
SK Engineering and Construction Co. Ltd., Seoul South Korea
Email and Tel, No. hyoh@sk.com / 010-4621-2936/02-3700-7874

2.0 Mr. Park Chul Yung
SKEC Plant Piping Team / Senior Manager
SK Engineering and Construction Co. Ltd., Seoul South Korea
Email and Tel. No. cwpark-b@sk.com / 010-9439-3916/02-3771-5770
PERSONAL INFORMATION :
Date of Birth : September 10, 1967 Age : 51 years old
Place of Birth : Minalabac Camarines Sur Citizenship : Filipino
Religion : Roman Catholic Status : Married
Height : 170 cm Weight : 70 kg
Language : English, Tagalog

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

Franco P. Fabay

Ad
Ad
Ad