Construction Manager
Last Updated: 2nd November 2019 (over 3 years ago)
Summary
Experience
Project Superintendent
Jan 2019
— Current
Project Process Units:
- Diluent Recovery Unit (Topping Refinery by Steam Stripping)
- Bleending Crude Oil Unit (by Static Mixers)
- Steam Generation Unit (Filters, Inverse Osmosis, Mixed Beds, Deareator, Medium Pressure Steam Boilers)
- Cooling Water System
- Wastewater Treatment System (with Slugdes Biological Reactors)
- FF System upgrades
- Compresed Air Systems
- Fuel Gas Systems
- Electrical, Instrumentation and Control Facilities
Project Superintendent
Jan 2019
— Current
Project Process Units:
- Diluent Recovery Unit (Topping Refinery by Steam Stripping)
- Bleending Crude Oil Unit (by Static Mixers)
- Steam Generation Unit (Filters, Inverse Osmosis, Mixed Beds, Deareator, Medium Pressure Steam Boilers)
- Cooling Water System
- Wastewater Treatment System (with Slugdes Biological Reactors)
- FF System upgrades
- Compresed Air Systems
- Fuel Gas Systems
- Electrical, Instrumentation and Control Facilities