BOILER EXPERT/DEPUTY SITE MANAGER


Last Updated: 4th April 2019 (over 3 years ago)

Address
Romania

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
55 to 64

Qualification Level
Masters

Languages
French

Summary

NAME: Florian Mihail Costea

ADDRESS: Str. Frederic Joliot-Curie
No. 9, Ap. 3, Sect. V
Bucuresti - Romania
Code – 050588

TELEPHONE: 0084775279385

EMAIL : costea.florian@gmail.com

DATE OF BIRTH: December 29th 1961

EDUCATION: Bucharest Polytechnical University
Mechanical Faculty
Thermal Machines Section (boilers + turbines)
Bachelor Degree 1986

DRIVING LICENCE: Cat B

LANGUAGES: English – Very good, French – Good

SKILLS: Independent senior mechanical engineer – boiler
expert in power industry

IT SKILLS: Autocad 2009 (2D and 3D)
INVENTOR 10
EXCEL
WORD

EXPERIENCE:

2008 – DATE Senior Mechanical Engineer - Boiler Expert - Deputy Site Manager
Fichtner GmbH and Co – Stuttgart

2007 – 2008 Pressure Parts Senior Design Engineer
Alstom Power Romania SRL

2006 – 2007 Lead – Boiler Design Department
Vulcan Boilers Romania SA

1999 – 2006 Design Engineer – Pressure Parts
Departament Tecnoservice – Bucuresti SA

1994 – 1999 Design Engineer – Boiler Department
R.E.G. – SA

1989 – 1994 Design Engineer – Boiler Department
Institute Of Research And Design For
Thermal Power Equipments

1986 – 1989 Engineer-
Romanian National Power Erection
Company (S.A.E.M.)

HISTORY OF MAJOR WORK:

AT FICHTNER GmbH & Co:
In Hanoi office (Vietnam):
(2013-2014) providing basic design review (boiler and BOP) for Thai Binh 1 (2x300 MW), Thang Long (2x300 MW) and Duyen Hai 3 (2x600 MW) projects; EPC proposal evaluation (boiler and auxiliaries) for Song Hau 1 project (2x600 MW)
On site:
- Expert (owner consultant) in Cam Pha 2x300 MW (2008-2011) and Mao Khe 2x220 MW (2011-2013) power plants Vietnam for providing consultancy services for the owner (Vinacomin) regarding erection design review, site supervision phase (erection) and commissioning for all pressure parts (boiler, turbine, BOP) and auxiliaries ( air and ID fans, coal handling, ash handling, limestone handling and stack) at all stages during building of power plant. In Cam Pha power plant (2 stages) each stage means 2 CFB Foster Wheeler boilers 545 t/h each connected to a 300 MW Dongfang turbine and in Mao Khe power plant (also 2 stages), each stage means 1 CFB Foster Wheeler boiler 717 t/h connected to a 220 MW Dongfang turbine.
- Expert (owner consultant-deputy site manager) in Thai Binh 1 (2x300 MW) power plant Vietnam (2014-2018) for providing consultancy services for the owner (Electricity of Vietnam) regarding erection design review, site supervision phase (erection) and commissioning for all pressure parts (boiler, BOP) and auxiliaries ( air and ID fans, coal handling, ash handling, limestone handling, ESP and FGD) at all stages during building of power plant. In Thai Binh 1 power plant (2 stages) each stage means 1 PC Foster Wheeler boiler 965 t/h connected to a 300 MW Fuji Electric turbine.
- Expert (owner consultant) in Song Hau 1 (2x600 MW) power plant Vietnam (2018-DATE) for providing consultancy services for the owner (Petro Vietnam) regarding erection design review, site supervision phase (erection) and commissioning for all pressure parts (boiler, BOP, turbine) and auxiliaries ( air and ID fans, coal handling, ash handling, limestone handling, ESP and FGD) at all stages during building of power plant. In Song Hau 1 power plant (2 stages) each stage means 1 supercritical Doosan boiler 1822 t/h connected to a 600 MW Doosan Electric turbine.

AT ALSTOM: Co-ordinate the design of SH1 and SH2 packages for boilers in Marsat – Algeria.
Manufacturing preparation for rehabilitation of wall superheater I, superheater II and reheater III of 1035 t/h Rovinari unit 6.

AT VULCAN: Co-ordinate the design of roof tubes area at 1300
t/h boiler from Texas together with the Babcock Wilcox company.
Project co-ordinator in the design department for 630 t/h boiler for
Hastings USA together with Babcock Wilcox
Project co-ordinator in the design department for 40 t/h boiler for
Stambolijski (Bulgaria) together with HSE (Austria)

AT TECNOSERVICE: Pressure parts detail Engineer for the followings:

Rehabilitation of energetical boiler
420 t/h – 148 bar – 540 centigrade – natural circulation from lignite to hard coal. – Iasi and Suceava Power Plants – Romania

In co-operation with Fortum Engineering – Finland
Rehabilitation of energetical boiler
330 t/h – forced circulation – Unit 3 – Deva Power Plant – Romania

Detail drawings for AH-WB, FDF-AH, PDF-AH air ducts and supports
For Unit 4 – Paroseni Power Plant – Romania

Detail drawings for ECO-AH, ECO-HOOPER gas ducts and supports for
Unit 4 – Paroseni Power Plant – Romania

Detail Drawings for Deva Unit 5 Pressure part headers.

AT R.E.G: Pressure part detail engineering for the following:

Refuse Boiler – Gibraltar, Spain in co-operation with BWE – Denmark

Rehabilitation boiler 140 t/h from coal to wood chips – Norrkoping, Sweden

Burner opening for Unit 6 and 7 TPP Rugeley – England

PFBC steam boiler – Cottbus, Germany in co-operation with ABB Carbon, Sweden

Pressure parts for 375 t/h steam boiler CCS Taiwan, Unit 12

In co-operation with Babcock Hitachi, Japan

Refuse Boiler, Amager, Denmark with Ansaldo Volund, Denmark

This design work was made in line with TRD norms and approved by
TUV, Germany

AT INSTITUTE OF RESEARCH & DESIGN:

As a Design Engineer, pressure parts detail engineering for:

Pulverized coal boiler 1100 t/h – 192 bar – 540 centigrade – bituminous coal for Pucheng Power Plant, China

Parts – Vaporiser I, Passing areas between Vapo I and Vapo II
Pendul Supports
Economiser
Reheater I
Outlet Hopper Con. Tube.

AT ROMANIAN NATIONAL POWER ERECTION COM PANY:

As Engineer

Boiler Units 5 & 6 1035 t/h – 192 bar – 540 centigrade overhaul – Rovinari
Erecting an proper station for producing oxygen in Navodari Power Plant.

ADDITIONAL INFORMATION:

- QA Course – ISO9001 standard series – 1995

- Beginning with 1994 until 2008 I have been authorised by ISCIR for verifying and checking for compliance on behalf of ISCIR, pressure parts according to C1, C4 and C15

- ASME Section I and VII requirements for A.Q.

- In 2006 between April and July I was working in Vietnam for ESB International as owner consultant (boiler expert) for basic design review stage of boiler and pressure parts belongs to Hai Phong I power plant (2 x 300 MW)

- In 2006 between September and October I was working in Vietnam for ESB International as owner consultant (boiler expert) during contract negotiations for Hai Phong II power plant (2 x 300 MW)

- Individual growth and team working performances with CODECS – 2008

Search Jobs by Industry

Ad
Ad
Ad