Instrumentation engineer with 7 years of experience


Last Updated: 3rd July 2018 (over 4 years ago)

Address
Saudi Arabia

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Hindi

Summary

currently working in Arkad engineering and construction as instrumentation engineer , have 7 years of relevant experience in the field of EPC work . Dealing with ARAMCO PROJECT for pipeline project, onshore maintenance potential program etc. have very good work knowledge and commitment to complete the project with hard work.

Experience

ARKAD ENGINEERING AND CONSTRUCTION
INSTRUMENTATION AND COMMUNICATION ENGINEER

   Aug 2016
— Current

PROJECT DETAILS
 FADHILI DOWNSTREAM PIPE LINE PROJECT, 56” pipeline from Fadhili gas plant to Wasit gas plant (34KM) and from wasit gas plant to west east pump station (204KM).
Consultant: Jacobs Zate
End User : Saudi Aramco
 ONSHORE MAINTAIN POTENTIAL PROGRAM NORTHERN AREA-1.
End user : Saudi Aramco, KSA

JOB ROLE:
 Verification of basic engineering documents for preparing quotation (Project Bidding) such as P&ID, MTO Engineering specifications etc.
 Preparation of detailed engineering documents such as MTO, MR, Instrument data sheets, Hook-up drawings, Cause and effect diagram Interlock list, Instrument and junction box location, Loop diagrams, Junction box termination details.
 Verification of vendor documents such as NMR documents Technical offers and quotation, instrument specification and general arrangement drawings, Quality assurance plan documents etc

FURNACE FABRICA INDIA LIMITED
SENIOR INSTRUMENTATION ENGINEER

   May 2011
— Dec 2015

PROJECT DETAILS:
 6000 TPD SULPHUR MELTING AND FILTRATION PROJECT, Morocco
Consultant: JACOBS SA
End user : OCP, Morocco
 ROASTER AND RMHS PROJECT, RAJASTHAN, INDIA.
End user : Hindustan zinc Ltd

JOB ROLE:

 Preparation of detailed engineering documents such as MTO, MR, Instrument data sheets, Hook-up drawings, Cause and effect diagram Interlock list, Instrument and junction box location, Loop diagrams, Junction box termination details
 Verification of vendor documents such as NMR documents Technical offers and quotation, instrument specification and general arrangement drawings, Quality assurance plan documents etc.
 Selection, Procurement, and Inspection of instruments such as Control valves, PLC, pressure transmitters, level transmitters, temperature transmitters, flow meters etc. as per the specification from various reputed vendors.
 Lead the instrumentation team for onsite erection job, installation, calibration and configuration of various instruments such as Load cells, position encoders, On-Off valves, Control valves, Flowmeters, Level transmitters, Temperature transmitters, Pressure transmitters, Controls systems etc.
 Coordinating with vendor engineers for calibration of load cells, PLC programming, and SCADA configuration, CCTV configuration etc.
 Control logic preparation, Loop checking and interlock checking for smooth operation of plant equipment and instruments such as cascade Belt conveyors , shuttle conveyors ,pumps, agitators , bag filters , ON-OFF valves , de-super heater valves , control valves , VFDs, Soft starters, DOL & RDOL motors , flow meters, Temperature transmitters, Level transmitters etc.
 Commissioning assistance for the smooth running of the plant.
 Provided training for end users about instruments calibration and configuration and PLC/SCADA operation.
 Preparation of as built documents of all the detail engineering documents

FACT LTD
TRAINEE ENGINEER INSTRUMENTATION

   Dec 2010
— May 2011

Worked as engineering trainee in the FACT plants for ammonia.

Ad
Ad
Ad