Summary

Possess 13+ years of cumulative experience in Saudi Arabia as an Aramco Approved Quality and IT Personnel in oil & Gas industries involving in Design, Engineering, Procurement, Construction, Precommissioning & Commissioning activities for ISP/OSP in EPC Projects. The comprehensive experience includes Project management, supervision and co-operation between manufacturers, clients, contractors and local authorities this has encompassed all directions of multi-disciplined, multi-national projects & engineering team through all phases of project execution. A consistent level of success has been achieved in Quality Assurance and Quality Control complying towards Saudi Aramco & International Industry Codes & Engineering standards including interpersonal & excellent skills towards objectives of the projects operation and contracts

Experience

Nesic Saudi Arabia
QA/QC Manager

   Apr 2014
— Current

Review Project Quality documentation to ensure all QA & QC deliverables required under the contract are processes in time to ensure they are achieved
Review and approve vendor or subcontractor’s Quality plan, test and inspection plan for compliance with schedule, project specifications and local authority requirements.
Carried out project audit for 15% & 60% Design, Procurement & Construction completion progress as per schedule Q and ISO requirements
Transmitted the Project Quality Audit Results to Saudi Aramco Representative and Corporate QHSE Manager
Conducted Management Review Meeting with within two weeks after audit completion to ensure up-to-date information to the Top Management
Responsible to maintain and follow-up for inspection and Non-conformance logs raise by inspection team or by the client
Control of all non-conformances reports and undertaken with immediate corrective action as required
Planned QC manpower resources to manage the project quality control team to ensure all inspections and test are performed with required criteria.
Assuring implementation of applicable ITP & work instructions, procedures in accordance with project scope of work and standards as required
Verified that the quality related site activities are in accordance with the applicable codes and standards
Analyzed quality control test results and provide feedback and interpretation to company management or representative
Lead root cause analysis determination activities and drive the implementation of mistake proofing to eliminate the recurrence of non-conformance
Performed Quality inspections during procurement stage and determining final disposition reports on products inspected and verified in process
Assist in determining manufacturability/feasibility and implementing quality checks and measures
Ensured Implementation of Quality Management System at Project site.
Established Company Quality Plan including Quality Policy (based on Corp. QHSE Policy) and continually improve it
Responsible for ensuring that Company Quality Management policy, plans and procedures are implemented effectively and are suitable for their purposes and use for which they are intended.
Coordinated site inspections through the discipline Supervisors and QC inspectors
Assured all technical documents relative to site quality control are current status
Implemented document control and review procedure to ensure the security and control of drawings
Planned and Scheduled Weekly Quality minutes of meetings with Project Inspection Department and Project Management Team personnel’s
Coordinated and communicated with Saudi Aramco Personnel’s on Project Quality issues
Assisted the Corporate QHSE Manager in developing an orientation program to ensure the Project Team is familiarized with the requirements of the Project Quality Plan
Supported in all levels of the project in the implementation of the Quality Management System and Project completion as per the contractual obligations
Ensured the Project Quality Training plan are implemented and the training records are maintained.
Reported the performance status of Project Quality activities and relevant issues to the Corporate QHSE Manager
Monitor the progress and effectiveness of the project quality management system. Recommend and implement improvements when required
Immediate action has been taken on to close all customer complaints in order to achieve site completion of the project
Verified that the quality related site activities are in accordance with the applicable codes and standards
Coordinate all the quality site inspections through the site QC inspectors
Ensure the safety is always adhered at site
Hired the Qualified QA/QC staff as per the project requirements in compliance with schedule Q
Prepared Quality plan and procedures, under the direction of the Corp. QHSE Manager, to ensure that the appropriate elements of the Quality Management Program Manual have been addressed
Ensured that the appropriate approved materials and equipment’s are supplied from the manufacturers/Suppliers
Review the submission of Pre-Qualification documents, Vendor Award Recommendations, Purchase Requisition (PR), Purchase order (PO), Inspection Assignment Package (IAP), Final Disposition Reports to ensure that the all applicable requirements are met in order to comply inspection levels as per the SAER 1972
Assessed the performance of employees through task assignments, ongoing skill for the employee appraisal and training needs
Achieved 100 % PQI (Project Quality Index) thrice during the project period
Worked on the submission of Project Record Books (PRB) and Project Close-out with Saudi Aramco Engineering Group for the smooth turnover of the project