EXPERIENCED MECHANICAL/PIPING ENGINEERING


Last Updated: 18th June 2018 (over 4 years ago)

Address
Canada

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
55 to 64

Qualification Level
Degree

Languages
English, Filipino, Spanish, Tagalog

Summary

Experienced and driven engineering professional with expertise in design, process calculation, stress analysis, scheduling, planning and construction project management. Skilled in resolving work related issues and problems ensuring that safety, quality, practicality, economical and conformance to project specification are not compromised. Instrumental in estimating budgets and proposal, and issuance of project deliverables from conceptual, Pre-FEED, FEED, and EPCM of mining & metal, oil & gas, petrochemical, refinery, pharmaceutical, manufacturing and power generation. Technical proficiency in MS Office, AutoCAD, Microstation, Smart Plant Review, Caesar II, Autopipe, Naviswork and Solidworks.

Education

Professional Engineer of Ontario
Professional Engineer - In Process

   Apr 2018
— Current

In Process for Professional Engineer of Ontario - Registration number 100047112

Saudi Engineering Council, Saudi Arabia
Member of Saudi Engineering Council

   Mar 2015
— Apr 2017

Member of Saudi Engineering Council, Saudi Arabia Member No. 241706

University of Toronto
Equivalent Degree of Mechanical Technologist in Mechanical

   Jul 1997
— Jul 1997

Technologist's Diploma, in Mechanical Engineering, offered by the Colleges of Applied Arts and Technology in Ontario.

Professional Regulation Commission, Philippines
Registered Mechanical Egnineer

   Sep 1981
— Current

Registered Mechanical Engineer License number 21161 by Professional Regulation Commission, Philippines

Batangas State University (was PBMIT) - Batangas City, Batangas, Philippines
Bachelor of Science in Mechanical Engineering

   Oct 1974
— Mar 1979

Graduated with Diploma in Bachelor of Science in Mechanical Engineering

Experience

CONSULTEC LTD - Toronto, Ontario, Canada
Field Engineering

   Apr 2017
— Mar 2018

• Managed field engineering to support construction of mining project, Carbon Pre-flotation Plant (CPP) owned by Goldcorp located at Penasquito, Zecatecas, Mexico doing multi-task but not limited to responding and tracking RFI's & submittals, monitoring progress with photos, coordinating with home engineering office, preparing daily report and attending meetings. It also includes field sketches for tie-ins to create Isometrics, Piping GA's, and details, and walk-down of all large bore lines for an as-built or red-line.
• Contributed resolution to piping/mechanical/structural issues that arise during construction and coordinated with client and contractors for seeking information and approval.

SNC-LAVALIN, INC./Al-Khobar - Turaif – Saudi Arabia
Piping Supervisor

   Mar 2015
— Dec 2016

• Oversaw construction management of USD$500 million Ma'aden Phosphate Project – Package 4 consisting of Sulphuric Acid Plant (three identical units - 5.5 MMTPA total capacity) and Power Plant (two 75-MW steam generating unit, auxiliary boiler, FGD, SPX condensing unit and diesel generator) in order to ensure that contractor was carrying out fabrication and erection according to project plan and schedule until turn-over to commissioning.
• Resolved quickly any construction issues with regards to materials, engineering, technical, quality and safety, resulting to project completion on time.
• Implemented cautiously construction method statement, hydro-test packages, and site work changes after careful review and approval so that work was executed in timely manner.
• Participated orally to evaluate mechanical completion during meeting with contractor, PMC and client to sort out over-all progress.
• Contributed to mitigate situation when construction was behind schedule and progress is at risk and initiated piping engineering and calculation to assist home office on their design.

SNC-LAVALIN, INC. - Toronto, Ontario, Canada
Sr. Piping Engineering Specialist

   Apr 2014
— Mar 2015

• Accomplished timely all deliverable documents on tight schedule to do piping engineering that includes wall thickness calculation with vacuum check in accordance with ASME PVC Sec 8 Div 1- UG 28, in order to assess Pipe Material Specs. It also includes respond to Comment Resolution Sheets, prepared data sheet of all in-line specialty items and reviewed stress analysis of all critical lines done by Others for the following projects:
• FEED of BOP and Flare Upgrade on ZIRKU Facilities Capacity Enhancement Project, by ZADCO, UEA.
• FEED of ADCO Expansion Project, QUSAHWIRA Phase II, UEA.
• Completed dynamic stress analysis of HP steam line for UMM WU'AL Ma'aden Phosphate Project package 4 containing Sulphuric Acid and Power Plant and resolved issue on Fenco BAJA project without affecting site installation.

FLUOR CANADA LTD - Vancouver, BC - Canada
Sr. Stress Engineering

   Sep 2012
— Feb 2014

• Delivered stress piping engineering report as per schedule using Autopipe program to qualify routing for flexibility according to ASME B31.3, determine load to structure and meet equipment nozzle load allowable for EPCM of open-pit copper and molybdenum mining project, Cerro Verde 2 Expansion Project, Agripa, Peru, US$2.9 billion, with capacity of 360,000 metric tons per day particularly application of Victaulic fittings sizes up to 78-inch diameter. It also includes designed of saddle support for 72-inch diameter pipeline on the project to assist civil/structural for their final design.

SHAW ENERGY AND CHEMICAL GROUP - Toronto, ON – Canada
Sr. Piping Engineering

   Jun 1999
— Aug 2012

Sr. Piping/Lead Stress Engineering/Sr. Field Engineering/Mechanical Superintendent/Process Engineering (13 yrs)
• More than 13 yrs in the company and held several positions on engineering and construction of Oil & Gas, Petrochemical, Refinery, Pharmaceutical and Power Generation Projects with following achievement:
• As Sr. Piping Engineering, contributed for preparation of technical specifications, materials specs, data sheets, GA drawing, P & ID's, and Isometrics. Responsibilities include wall thickness calculation, stress analysis (static/dynamics), squad check and Vendors' submission review, bid evaluation, design review, planning, and project meetings. And to do estimate for budget and manpower to assist project lead for scoping and schedule.
• As Lead Stress Engineering, managed to issue all stress report deliverable to the project, update stress status during meeting, and provide technical support /information/clarify issues within a group.
• As Mechanical Superintendent, oversaw all construction activities including line walk-down during pre-commissioning and responding to RFI's. Received completion bonus for the work well done.
• As Sr. Field Engineering, achieved mechanical completion on time by providing technical support to construction, interpret/created drawing, review & approve method statement, hydro-test packages and reply to RFI's.
• As Mechanical Engineering on BHP, assisted the Project Lead Engineer on documentation to prepare drawing & package specification, calculate line pressure drop and equipment size.
• As Process Engineering on CA- Spray Dyer project of Apotex Pharmaceutical plant, developed PFD, P & ID's and schematic diagram including hydraulic calculations and sizing of piping, control valve, PSV and equipment. Also wrote process or functional description under JNE engineering.
• Projects were as follows:
 Pre-FEED - Ethylene Emission Reduction, NOVA Chemicals, Sarnia, Ontario, Canada [02/2012 – 08/2012]
 FEED – Flare & Emission Reduction Project, ADGAS, Abu Dhabi, UAE [12/2011 –08/2012]
 FEED - ADGAS - Paraffinic Naphtha Tank Replacement Project, Abu Dhabi, UAE [02/2011 – 10/2011]
 EPC – Polysilicon Plant – Hoku Materials, Inc., One Hoku Way, Pocatello, Idaho, USA [09/2010 – 02/2011]
 ED - Hassi Messaoud LPG Project, Saipem, Algeria company transfer at Milton Keynes, UK [05/2010–08/2010]
 Construction management of HDPE/ BBTX Yansab Project, Yanbu, KSA [250M US$] - [07/2007 -12/2009]
 Engineering review of Duzhanzi Petrochemical, 130KTA PS Project [05/2007 – 07/2007]
 EPCM - BBTX project, Yanbu, KSA, 135KTA of Butene & 250KTA of (BTX) [07/2006 – 07/2007]
 EP - Solvay Advanced Polymers, LLC, Marieta, Ohio, USA [70M US$] [05/2005 – 06/2006]
 EPCM - ULSD Cenex Refinery, Laurel, Montana, USA [87.5M US$] - [11/2003- 05/2005]
 EPCM - Big Hanaford Project (BHP), Tansalta Centralia, Washington, USA [215M US$] - [2002 - 2003]
 EQ - Bruce Nuclear Power Plant, Ontario, Canada by RCM Technology [02/2003 – 11/2003]
 ED - Refinery Project - Tesoro Mandan Refinery, FCCU Revamp, Mandan, North Dakota [11/2002 –02/2003]
 ED - SCR (Selective Catalytic Reduction) - Lambton and Nanticoke [09/2002 – 11/2002]
 ED -Torpharm and Apotex - Pharmaceutical Plant, Toronto, Ontario by JNE Engineering [06/2002 – 09/2002]
 EPCM - Big Hanaford Project - Cogeneration Power Plant, Transalta Centralia, Washington, USA [05/2001 – 05/2002]
 ED - Balance of Plant project of Jiu Jang Power Plant, Mitsubishi, Jiu Jang, China [12/2000 – 03/2001]
 ED - Flyxess, Rubber Manufacturing Ltd, Kuantan, Malaysia [06/2000 – 12/2000]
 ED - Expansion CAN FIBRE, MDF - Facility, Lackawana, New York, USA [04/2000 – 06/2000]
 ED - Support Modification - PWR Nuclear Power Plant, Ontario Hydro, Pickering, Ontario [03/2000–04/2000]
 ED - ESSO Refinery, Sarnia, Ontario [01/2000 – 03/2000]
 ED - Steam Blow project of Hebie Electric Power Plant, MHI, Hanfeng, China [06/1999 – 01/2000]

EPCM Services Ltd - Oakville, ON – Canada
Sr. Technical Associate - Sr. Piping Designer

   Jul 1998
— Jun 1999

• Provided deliverable such as HVAC ducting layout, piping GA and Isometric using AutoCAD on Unit 1&2 Debottlenecking and Back Eng Venting Project - Columbia Chemical Canada, Hamilton, Ontario and Revamp project - KG Packaging, Concord, Ontario.

PYRAMID Engineering - Richmond Hill, ON – Canada
Sr. Piping Designer

   Jun 1997
— Jul 1998

• Delivered piping GA and Isometrics drawings using AutoCAD and prepared pipe & valve materials specifications on Revamp Project for Dextran Product Limited - A Division of Polydex Pharmaceutical Limited, and CCL Custom Manufacturing, and International Waxes, North York, Ontario.

MK-Fegurson Co./McConnel Dowell /Technilink, - Paulu Sakra, Singapore
Piping Engineer

   Jun 1996
— Feb 1997

• Provided engineering to produce tie-in details and Isometrics using AutoCAD and bill of materials for procurement on Singapore ADI-PURE Upgrade Project -Dupont Manufacturing Plant that includes Additional SRS Incinerator Unit, Alternate Catalyst Recovery Unit, Crude Centrifuge, and modifications of Cyane Oxidation Refiner, Full Rate Decantation, and Bio-Equalization Unit. This modular design project was done in home office engineering in Cleveland, USA.

Parson International Limited - Tabangao, Batangas City, Philippines
Stress Analyst / Field Engineer

   Jul 1995
— May 1996

• Completed all the necessary engineering report during the performance as stress analyst using AutoPipe program in order to qualify piping for flexibility and conformance with ASME B31.3 all critical lines of CAPEX Project - Philippines Shell Petroleum Company, Tabangao, Batangas City. It also includes preparation of pipe support list and data sheet of spring hangers. Then afterwards, supervised construction management of the project to oversee construction activities as field engineer.

Litwin Lummus Joint Venture - Aruba, LLJCVA - San Nicolas, Aruba
Field Engineer

   Aug 1994
— Jun 1995

• Mechanically completed the Delayed Coke Plant project in Coastal Refinery, San Nicolas, Aruba doing field engineering work with multi-task but not limited to interpretation of engineering drawing to each discipline, clarification of issues during construction, site routing of SB piping using Dekoron tubing, materials and spools tracking, and coordination to all discipline foreman and assistance to Piping Superintended on all construction activities.

Construction Consolidated Company, CCC – Athens, Greece / Al Mahdi, Kuwait
Piping Engineer / Field Engineer

   Mar 1993
— Mar 1994

• Completed Isometrics drawing at Greece for a month then moved to site at Kuwait to produce and issue all the necessary spool drawings with MTO's for fabrication to QC department including hydro-static test packages for construction of Refinery Restoration of Mina Abdullah Refinery project located in Kuwait consisting of Pumping Station and Coke Handling Facilities.

Parsons International Limited - San Pascual, Batangas / Makati, Manila Philippines
Sr. Piping Designer / Stress Analyst

   Jul 1990
— Mar 1993

• Completed GA layout and isometrics drawings with plant site surveys using G-DOME AutoCAD software during FEED stage of Batangas Debottlenecking Project (BDP) of Caltex Philippines, Inc located at San Pascual, Batangas, Philippines. And then was trained to become stress analyst using Caesar II & AutoPipe program during EPCM of same BDP project containing Expansion of CDU & SRU, Upgrade of LSR Merox Plant & TGS Facilities, Additional Power Plant & Minalk System, and modification of NHTU/Platformer Units.

Ad
Ad
Ad