Planning Manager


Last Updated: 11th October 2018 (over 4 years ago)

Address
United Arab Emirates

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
55 to 64

Qualification Level
HNC/HND/City & Guilds

Languages
Afrikaan, English

Summary

My success as a planning specialist has ensured I have gained excellent communication, interpersonal and administrative skills.
I have progressed well in my current position as Planning Manager, I am a disciplined and logical thinker who can act equally well under my own initiative or as a team member. I have excellent hands on experience and a proactive approach to problem solving. This has ensured I can efficiently develop, implement and monitor Planning and Scheduling systems. I take pride in my work and strive to produce and maintain high standards in whatever tasks I undertake. I am receptive to change and adapt easily to new situations and challenges. An experienced project planner, with 22 years project planning experience and 12 years in a managerial position.

• Prepare, update and submit the construction programme in line with the timeline as required by the client/consultant.
• Update and monitor the procurement schedule with the construction programme.
• Update and monitor the drawing schedule with the construction programme.
• Ensure the construction programme is resource loaded in order to project labour and plant requirements.
• Compile short term programmes and if necessary compile recovery programmes in conjunction with the construction managers.
• Monitor all nominated and direct appointed subcontractors programmes.
• Draw up networks and reports necessary for proper monthly and weekly reporting to the client/consultant and company Head Office. Based on the actual site progress, report to the Project Director/Manager regarding critical activities that will have an impact on the project finish date.
• Attend all co-ordination meetings with sub-contractors and client/consultant.
• Co-ordinate and monitor all interfaces between design, procurement, construction and handover phases (close out programme).
• Prepare as built programme and monitoring there-off.
• If and when necessary compile programmes to substantiate or support claims.

Education

Windhoek Technical College, Windhoek, Namibia
Tradesman - Steel Construction

   Jan 1986
— Nov 1989

Higher National Certificate – N3 Mechanical Engineering
Subjects:
Mathematics - N3
Engineering Science - N3
Steel Construction Theory - N3
Engineering Drawings - N6

Experience

Consolidated Contractors Company (CCC) (Abu Dhabi, United Arab Emirates)
Planning Manager – Finishes Package

   Sep 2014
— Current

I am part of the management team responsible for the fit-out and finishes of the Abu Dhabi International Airport, Midfield Terminal Building. The construction entails all the Civil & Architectural finishing and external infrastructure to the airport building.
Four planning Engineers reports to me.
Reporting to the Senior Project Controls Manager.

Belhasa SixConstruct (Dubai, United Arab Emirates)
Planning Manager

   May 2013
— Sep 2014

I was part of the management team responsible for the construction, fit out and finishes of the Dubai Tram project that runs from the Dubai Marina up to the Depot on Al Sufouh road. The construction entails all the Civil, Mechanical, Electrical, Plumbing and normal Architectural finishing to the depot buildings and 12 tram stations, as well as the construction of about 12 kilometres of tram track and all the associated infrastructure thereof i.e. roads, drainage, sewerage, water and electricity supply and landscaping.
Three planning Engineers reported to me.
Reporting to the Project Director and Senior Project Manager
Value of project – 3.2b AED.

ALEC Al Jaber LEGT (Dubai, United Arab Emirates)
Project Planning Manager

   Aug 2011
— May 2013

I was part of the management team responsible for the construction, fit out and finishes of Concourse 3 & 4 at the Dubai International Airport. The construction entails all the Civil, Mechanical, Electrical, Plumbing, Special Airport Systems, normal Architectural finishing to the building and infrastructure in and around the terminals i.e. taxiways, aircraft stands, drainage and taxiway lighting.
Six planning Engineers reported to me.
Reporting to the Project Director and Snr Construction Managers
Value of project – 3.8b AED

Penguin Engineering (Dubai, United Arab Emirates)
Planning Manager

   Feb 2010
— Aug 2011

I was part of the management team responsible for the MEP fit out of various projects in the UAE as listed below.
• Strata Composite Plant, Al Ain Airport – MEP Installation at the manufacturing facilities for Boeing and Airbus.
• UAE Air force Base, Abu Dhabi – MEP Installation for various hangars and utilities.
• Nestlé Processing Plant, Dubai.
• Sadiyaat Beach Club, Abu Dhabi
• Masdar Project, Abu Dhabi
• Fishing Harbours, Dubai
• Aldar Head Quarters ATIC, Abu Dhabi
Reporting to the Project Director and Snr. Construction Managers
Value of projects – 500 Million AED

Al Futtaim Carillion (Dubai, United Arab Emirates)
Project Planning Manager

   Sep 2008
— Feb 2010

I was part of the management team responsible for the construction, infrastructure establishment, MEP fit out and finishes of the MotorCity apartment complex at the Dubai Auto Drome (1800 Apartments). The fit out entails all the Architectural interior finishing to the buildings, like painting, wall, floor and ceiling finishes with marble, natural stone and glass whereas the infrastructure were roads, drainage, street lighting, pathways and landscaping.
Reporting to the Project Director
Six planning Engineers reported to me.
The project value was US$ 380 Million
In addition to the MotorCity and American University extension projects I was involved in the tender planning for various construction projects in Dubai and Qatar.

Depa Group of Companies (Dubai, United Arab Emirates)
Project Planning Manager

   Jun 2006
— Sep 2008

I was part of the management team responsible for the fit-out and finishes of the 5 star 422 rooms InterContinental Hotel and 4 star 318 rooms Crowne Plaza Hotel, Pavilion Shopping Mall, Harbour Plaza Accommodation and Commercial Building at the Dubai Festival City. The fit out entails all the Architectural interior finishing to the building, like painting, wall, floor and ceiling finishes with marble, natural stone, stainless steel, mirrored glass and glass. Decorative finishes to all Front of House areas in the hotels with FF & E. Fit out of various restaurants with-in the hotels. Co-ordinate all work permits, method statements, technical queries, engineer’s instructions.
Reporting to the Senior Project Manager
Four planning Engineers reported to me.
The project value is AED 500 Million.
In addition to the above project I was also overseeing planning engineers responsible for the fit out of the Mazagan Project in Morocco and the fit out of part of the Atlantis Hotel on Jumeirah Palm, Dubai. I was also involved in the tender planning for the Marina Bay Towers in Singapore.

Murray & Roberts Middle East (Dubai, United Arab Emirates)
Snr. Planning Manager

   Jan 2005
— Jun 2006

I was part of the management team responsible for the fit-out and finishes of Terminal 3, Concourse 2 and the Car park at the Dubai International Airport. The fit out entails all the Civil, Mechanical, Electrical, Plumbing, Baggage Handling Systems, Special Airport Systems and normal Architectural finishing to the building.
Reporting to the Project Director.
Five planning Engineers reported to me and in addition to these planning Engineers all the MEP planning staff (nominated subcontractor) also reported to me.
The project value was US$ 1.6 Billion

Emirates Trading Agency (Dubai, United Arab Emirates)
Planning Manager

   Sep 2003
— Dec 2004

I was part of the group management team responsible for all Civil & Mechanical projects on the Dubai International Airport within the ETA group.
The projects on the airport entails the complete fit-out of the CUC4 complex with all electrical reticulation, firefighting, HVAC, construction of the cooling water tanks, installation of cooling towers and Glycol chillers that fed various areas on the airport like the Flower Centre and the new Cargo Village (10km of piping, ducting and cabling).
All MEP fit-out for 7 Airbus maintenance hangars.
Reporting to the Senior General Manager and Project Director.
2 Planning Engineers reported to me.

KHOME Consulting Engineering (Dubai, United Arab Emirates)
Senior Planning Engineer

   Jun 2002
— Aug 2003

I was part of a team, which was responsible for the time and equipment management, on a project where the Aluminium smelter’s Anode rodding room and the Kilns were modified, rebuild and enlarged. The rebuild included all the electrical reticulation, firefighting network, HVAC, drainage, ventilation network, gas reticulation and SCADA installation.
Reporting to the Area Engineer
The total project value was US$ 1.1 Billion.

MAED (Mechanical Analysis & Engineering Design
Mechanical and civil Planner / supervisor

   Jul 1999
— Apr 2002

SEMOS Gold Mine - Sadiola, Mali, West Africa
Project planning and supervision of all mechanical
and civil construction activities constructing an Oxygen plant. Produce as build drawings, weekly and monthly reports.

Mossgas, Mossel Bay, South Africa
Project planning and supervision of all mechanical
and civil construction activities involved in various projects for Mossgas. Produce as build drawings, weekly and monthly reports.

SEMOS (Anglogold Ashanti) (Anglo American Corp. South Africa)
Capital project planner/estimator

   Jan 1998
— Jun 1999

I was part of a team, which was responsible to establish two new villages and associated infrastructure, for the local people of Sadiola and Farabakouta, which was effected by the enlargement of the pit area of the Semos gold mine.
Capital project planning and scheduling and cost control thereof. Reporting to the Section Engineer.

Freestate Consolidated Gold Mines (Anglo American Corp. South Africa)
Capital project planner/estimator

   Jan 1994
— Jan 1998

I was part of a team that was responsible for the cost, time and
equipment management, on a project where a new shaft were sunk and equipped and underground infrastructure were established.
Capital project planning and scheduling and cost control thereof.
Reporting to the Project Manager - Freegold Four.
The project value was US$ 500 million.
In addition to the monitoring of this project I was involved with the monitoring of the MEP and architectural fit-out of the Oppenheimer Hospital’s new ICU, 2 patient wards (120 beds) and extension of 4 operating theatres.

Freestate Consolidated Gold Mines (Anglo American Corp. South Africa)
Tradesman and mechanical foreman

   Jan 1990
— Jan 1994

Maintenance of conveyors, filter plants, compressors, cooling
towers, fabrication of pipes, chutes and various underground
maintenance functions in a trackless environment.

TCL (Tsumeb Corporation Limited) TSUMEB, NAMIBIA
Tradesman and charge hand

   Jan 1986
— Jan 1990

Copper & Lead Mine
Maintenance of conveyors, pump stations and various underground maintenance functions.
Construction and erection of various steel structures i.e. mill buildings, workshops, towers, compressor plants etc. with rigging and erection team.