Project Manager - SCADA, Electrical, Control and Instrumentation
Last Updated: 9th June 2017 (over 5 years ago)
Summary
Experience from both operations / maintenance and project implementation within Power Generation, Water and Wastewater, Rail industry.
Participated in number of projects for the whole project lifecycle from idea inception and project sales activities through design and implementation to project closure.
Have hands-on engineering and programming experience with ABB 800xA and Siemens PCS7 DCS systems, PLC's and HMI's.
Electrical and telecom engineering experience - alarms (fire, safety), CCTV, telecommunication systems (copper, FOC, wireless), Controls, LV & MV distribution with designs done in AutoCAD, ePlan and E3 environments.
Education
Certified Telecommunications Engineer
Apr 2017
— Current
Issued by Railwaymen Association of Latvia in April 2017,
License 3-01309
Project Management Professional (PMP)®
Sep 2015
— Current
Issued by Project Management Institute in September 2015,
License PMP #1851559
Certified Electrical Engineer
Oct 2013
— Current
Construction work management and supervision of up to 1 kV automation and electrical equipment; up to 1 kV cable lines; power and lighting wiring of industrial, residential, public buildings; security and fire alarm devices of buildings
Issued by Association of Electrical and Power Engineers of Latvia in October 2013,
License 70-3195
Industrial Engineering and Management
Sep 2006
— May 2008
Engineer's Diploma in Electronic / Electrical engineering
Sep 2001
— Feb 2006
Diploma PD C 0032
issued Feb 3rd 2006
Experience
Project Manager (subcontractor)
Dec 2016
— Current
Management of SCADA equipment design and programming, preparation of work schedules, negotiations with General Contractor and Subcontractors, SCADA equipment material procurement and manufacturing management, Shipping to Uzbekistan, start-up and commissioning management.
Project Manager (subcontractor)
Apr 2016
— Current
Management of SCADA equipment design and programming, preparation of work schedules, negotiations with General Contractor and Subcontractors, SCADA equipment material procurement and manufacturing management, Shipping to Uzbekistan, start-up and commissioning management.
Project Manager (contractor)
Feb 2016
— Current
Position:
Contractor's Representative (Project Manager / Contractor).
Project:
Design, supply, installation of equipment and materials for the SCADA system for optimizing energy use in the framework of the project “Construction of Electrified Railway Line Angren-Pap” (turn-key)
Scope of Supply:
Design, manufacturing, programming, installation and commissioning of redundant (2oo3) SCADA system (with power supply) for monitoring and control of 27,5kV AC traction catenary system and power supply system (27,5kV TWR, 10kV) disconnectors, 27,5kV sectioning post and traction substation equipment on the railway sections Angren - Pap (123,1 km) and Pap-Kokand (45 km)
Total number of sites: 12 stations, 4 traction substations, 4 sectioning posts, 3 control centres
Estimated contract duration: 405 days from Contract Effective Date
Budget: 4,69 MEUR