Mechanical site engineer
Last Updated: 6th July 2017 (over 5 years ago)
Summary
Education
B.Tech in mechanical engineering
Jul 2004
— May 2008
Associate engineer
Experience
Mechanical Site engineer
Mar 2016
— Current
Project consist of 2 five star hotels (Sheraton and Westin Hotel) and Commercial floors.
• Responsible for the installation of HVAC, FF and Plumbing system.
• Oversee installation of mechanical system to ensure that first fix, second fix and final fix items are installed and functioning according to specifications.
• Confirm material quantities and order the same as per project requirement.
• Ensure that the works are undertaken in a safe manner utilizing a project specific safety plan.
• Trusted with completion of all MEP works on site as per the project program and cost.
• Preparation of C.W.I.R. to get the approval of completed work from main contractor and later from consultant/client.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required
Mechanical Site engineer
Aug 2011
— Feb 2016
Project consist different types of buildings like Railway station building, Long stay car park, Mosque.
This project have different types of systems like chilled water air-conditioning, under floor cooling, air misting, car park ventilation, water misting, sprinkler system, FM-200 etc.
My job responsibilities was as a site engineer:-
• Oversee installation of mechanical system to ensure that first fix, second fix and final fix items are installed and functioning according to specifications.
• Confirm material quantities and order the same as per project requirement.
• Ensure that the works are undertaken in a safe manner utilizing a project specific safety plan.
• Trusted with completion of all MEP works on site as per the project program and cost.
• Preparation of C.W.I.R. to get the approval of completed work from main contractor and later from consultant/client.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
HVAC site engineer
Aug 2009
— Aug 2011
• Confirm material quantities and order the same as per project requirement.
• Ensure that the works are undertaken in a safe manner utilizing a project specific safety plan.
• Trusted with completion of all HVAC works on site as per the project program and cost.
• Preparation of M.I.R. to get the approval from client.
• Preparation of C.W.I.R. to get the approval of completed work from main contractor and later from consultant/client.
• Attend design coordination meetings with Project Management team, Consultants and other contractors as required.
HVAC design engineer
Jun 2008
— Jun 2009
• HVAC duct & pipe sizing and routing.
• Static pressure loss calculations.
• Pump head calculations.
• Preparation of technical submittals and taking approval from client’s consultant.
• Preparation of BOQ.
• Preparation of budget for the HVAC work.