Instrumentation Engineering Technologist Pre-Comm Lead


Last Updated: 25th May 2017 (over 5 years ago)

Address
Canada

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
55 to 64

Qualification Level
Other Post Graduate

Languages
English

Summary

• Basic mechanical knowledge, ability to operate and maintain vehicles and equipment.
• Ability to operate a wide variety of Power, Hand and Metering Tools.
• Proficiency in detailed welding experience.
• Basic use of Database Software like Maximo, Asset Management, SAP Software Solutions, File Maker Pro 13 as well Various Independent Company software tools as well as Delta V.
• Maintenance experience at a Uranium Mill and Utility Grid Systems.
• Calibration, setup and troubleshooting of flow, level, pressure, & weight instruments of Multiple makes and brands such as Rosemount, Foxboro, Khrone, & ABB to name a few.
• Have worked with Analog. Digital, Modbus and ProfiBus Devices

Education

Siast Palisar Campus, Moose Jaw, Saskatchewan, Canada
Instrumentation Engineering Technology Program

   Aug 1997
— Jun 2000

2014 Map Reading Search & Rescue
1997 – 2000 Diploma Graduate
Instrumentation Engineering Technology Program
SIAST Palliser Campus – Moose Jaw, Sk.
1996 Upgrading at SIAST Woodland Campus, Prince Albert, Sk.
1992 Journeyman Power Lineman
Sask Power Training Center, Weyburn, Sk.
1980 Corrections Worker 1, P.A.C.C, Prince Albert, Sk.
1977 Grade 12 Diploma Carlton Composite High School

Experience

Contract to CBM Projects Inc. Legacy project – K + S Potash.
Instrumentation Pre-Com Tech

   Jun 2016
— Current

Duties: Pre-com Instrumentation Technician, Providing QA /QC & Documentation Support, Turnover documentation Review, Walk Down Inspections
• Assisting File Maker Pro administer in data base management and maintenance of quality data and process.

Manage following activities using File Maker Pro version 13

• Ensuring that all documents received and produced is compliant with Quality requirement that adhere to the Owner’s standard for the receipt and transfer process to Commissioning.
• Troubleshoot all drawing issues that come in (i.e. outdated revisions, drawings without stamps, Contractor claims without drawings, test etc.)
• Build packages for inspection, walk downs and provide completed check sheets to quality manager.
• Updating key findings, tag extraction, preservation, adding new tags
• Respond to internal and external team in providing key information regarding walk downs and inspection
• Binder review support to Quality Test Inspectors in audit control over relevant systems and processes.
• Provide assistance to C&C and Commissioning team with all relevant analysis of progressive work completion based on project schedule and priority.February 12 - May 31, 2016
Contract: Apex Automation Ltd. Legacy project – K + S Potash.
Duties: Pre-com Instrumentation Tech. Service contract.

July 27 – October 17, 2015
Contract: Aboriginal Energy Solutions Inc. (The Completions Group)
Kerrobert Rail Facility Commissioning project.
Duties: Instrumentation Pre-Comm Lead.
Work Direction to Pre-Comm Team.
Documentation Control (Including Field Packages for commissioning)
LUN notices and reporting
March 23 – May 9, 2015
Employee: Consumers Co-operative Refineries, Journeyman Instrumentation.
Duties: Shutdown. Remove and calibrate instruments.

July 3, 2012 - March 3, 2015
Contract: Dynamysk Automation Foster Creek, RFO/Maintenance Instrumentation Lead.
Duties: Provide management of Maintenance Team to ensure devices were in proper working order, on sight utilization of Maximo, Asset Management, and SAP software & solutions.
Contract: Dynamysk Automation Foster Creek, Commissioning Instrumentation Lead.
Contract: Dynamysk Automation CNRL Kirby Lake, Commissioning Instrumentation Lead.
Contract: Dynamysk Automation CNRL Kirby Lake, Pre-Comm Instrumentation Lead.
Contract: Dynamysk Automation, Pre-Commissioning, site troubleshooting, Spectra FNNPF
Contract: Dynamysk Automation Suncor Firebag Site, Instrumentation Technologist

Search Jobs by Industry

Ad
Ad
Ad