Project Engineering and Project Managment


Last Updated: 6th February 2018 (over 4 years ago)

Address
Indonesia

E-mail
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Degree

Languages
English, Hindi, Indonesian

Summary

Well experienced in Project Engineering, Project Management and Construction Management for Green Field/ brown field/ Revamp/ Modernization Projects of Chemical Plants, Power Plants, Gas/ Chemical Recovery and Utility plants, Process Plants, etc

Education

Manonmaniam Sundaranar University
Bachelor of Mechanical Engineering

   Jun 1990
— Apr 1994

Experience


Head of Project Engineering

   Jul 2004
— Jan 2018

Started as a Project Manager and presently working as Head of Project Engineering, in PT. South Pacific Viscose, Indonesia, one of the largest Producer of Viscose Staple Fiber in the world and a group company of Lenzing AG, Austria and reporting to Head of Global Fiber Engineering, Lenzing AG and Board of Directors of PT. South Pacific Viscose.

- Responsible for Engineering and Project Management Services for Expansion, Modernization, de-bottlenecking Capex projects for 320TPA Viscose staple fiber production plant, Natural Gas based CS2 production Plant (105TPD), Power Plants (39MW), CS2 Adsorption Plant (20TPD), Sulphuric Acid Plant, Wet Sulphuric Acid recovery plant, Water Treatment Plant, Waste Water Treatment Plant and Utility Plants of Indonesia site.

- Project Feasibility Studies, Basic conceptualization with pre basic engineering and Prepare project proposal for Capex Planning.
- Responsible for Project Cost Estimation, Budgeting, Cash flow planning, Spending and Controlling for Capex Projects.
- Basic Engineering, Detail Engineering, Risk assessment (HAZOP/ HAZID/ SWIFT), Construction, and Commissioning and handing over of projects to operations and maintenance.
- Technical Sourcing of Equipment’s for the plant. Outsourcing of Technology oriented plant engineering to Technology Suppliers and reputed Engineering Consultants.
- Coordination with External Engineering consultants, Production, Maintenance, Finance, SHE, Purchasing and other Global Engineering departments for successful implementation of projects.
- Providing technical support for other sites.
- Implement Global Standards for Engineering and Project Management.
- Responsible for Managing a team of Process Engineers, Mechanical Engineers, Electrical Engineers, Instrument & DCS Engineers, Design office (drafters) and Project managers, multi-cultural team of approx. 75 members (40 Core Team and 35 contract staff).

Thermal Systems (Hyderabad) Pvt Ltd, India,
Manager-Construction

   Apr 2003
— Jul 2004

Thermal Systems (Hyderabad) Pvt Ltd, India, is one of the Leading Suppliers of Waste Heat Recovery and Municipal solid Waste Fired Boilers in India. I was In- Charge of Construction Department and reported to Executive Director and was Responsible for,
- Installation and Commissioning of Boiler’s for Power, Steel, Copper Smelter, Zinc Smelter, Solid Waste disposal plants and was handling multiple projects with the support of Asst. Managers, Engineers and sub-contractors.
- Budgeting, Scheduling, Resource Planning, Equipment Despatch planning, Sub-contracting, etc
- Coordination with Indian Boiler Regulatory authorities in project executed states/ provinces and Customers for statutory approvals.
- After sales support to the customers.

Kuwait Controls Co.
Maintenance Engineer

   Mar 2001
— Jul 2003

Worked as Maintenance Engineer of 8x300MW Min- Az Zour, (South) Power and Desalination plant in Kuwait Controls Co. Kuwait, Leading Ministry of Electricity Approved Maintenance Contractor for Power Plants, Desalination and Refinery Plants in Kuwait and reported to Senior Project Manager.

Was Responsible for,
 Mechanical maintenance activities of 8x300MW Power Plant Boiler and Desalination plant.
 Daily, Weekly, Monthly and Annual planning (manpower, Consumables, spare parts, etc) of the Maintenance works related to planned and unplanned shutdowns.
 Co-ordination with Ministry of Electricity and Water, Third Party Inspection agency like Bureau Veritas, for Certification of Quality of Work and Certification of the Work (Maintenance) Completion Report from the Ministry of electricity and water.
 Responsibilities included Failure Report Preparation, subsequent analysis and rectification report to the Ministry of Electricity and Water, Kuwait.
 Prepare and Issue Project Quality System and Preventive Maintenance Programme as per Relevant Codes and standards of MEW, Kuwait.

Key Achievements:
 Completed two years, Mechanical Maintenance of 8x 300 MW Power and desalination plant at Min- Az Zour, Kuwait, for the Ministry of Electricity and Water, Kuwait, with Zero Accident and Zero defect.

Ad
Ad
Ad