Field Engineer/TA Planner/TA Scheduler with exposure in the construction and maintenance of Oil & Gas and Petrochemical Plant;
Experienced in LNG/GTL Process Train, Petrochemical Train, Demountable Flare and Boiler Maintenance Shutdown for mechanical and piping work execution, coordination, costing and planning;

Education

Mapua Institute of Technology
Engineering

   Jun 2001
— Nov 2006

Bachelor of Science in Mechanical Engineering

Experience

Qatar Engineering & Construction Co. WLL
Planning Engineer/Turnaround Planner

   May 2013
— Current

COMPANY: QATAR ENGINEERING AND CONSTRUCTION WLL, DOHA, QATAR
POSITION: Lead Planning Engineer (Qatar Shell – Pearl GTL, RLIC)
07-March 2017 to Present

DUTIES AND RESPONSIBILITIES:

• Ensures all services are conducted in safe, cost effective and environmentally sound manner, and full meet all project specific HSSE requirements;
• Co-coordinating, organizing, coaching and developing the planning team for all project internal and external scheduling and reporting requirements;
• Developed related procedures for the planning operations and processes;
• Assist with the coordination of necessary input from all departments and projects;
• Lead the team of Planning Engineers in preparation of Project Master Schedule;
• Developing code structure in line with project work breakdown structure and project coding;
• Preparation of progress monitoring system;
• Schedule review, identify and participate in optimization of critical path;
• Levelling resource and preparing resource histograms;
• Lead the Planning Engineers in monitoring project progress;
• Communicate key issue’s and risk to Project team;
• Support Cost Control Engineer in report preparation;
• Prepare and monitor project variation order.
PROJECTS HANDLED:

• Drilling Fluids Project – 07 March 2017 to 28 February 2018
• LP Fuel Gas Header Modification – 01 August 2017 to Present
• LPU Pump Upgrade – 01 August 2017 to Present
• HOG to NG Pre-Heaters Train-2 – 23 October 2017 to 30 May 2018
• BFW O2 Injection Project – 15 February 2018 to 15 May 2018
• BSTD Greenhouse Erection and Installation – 15 March 2018 to Present

COMPANY:QATAR ENGINEERING AND CONSTRUCTION WLL, DOHA, QATAR
POSITION: Turnaround Scheduler/Planner (Qatar Chemical Company, MIC)
11 December 2016 – 06 March 2017

DUTIES AND RESPONSIBILITIES:

• Work with group of Scheduler to prepare, optimize and monitor plan;
• Develop code structure as per system (Systemization Structure) in Primavera;
• Create logical network of activities (Production & Maintenance) and schedule without overly constraining the schedule;
• Schedule review, identify and participated in optimization of critical path;
• Levelled resource and prepared resource histograms;
• Generate and issue shift look ahead for execution team;
• Communicate key issue and risk to TA team;
• Maintain log of additional work and ensure that all scope is captured, planned, scheduled and tracked during execution;
• Monitor schedule, update and report during execution phase;
• Prepare daily reports such as S-curves and Management summary report (Overall, Critical, Equipment level, Discipline, Contractor, Project Plan vs. Actual)

PROJECTS HANDLED:
• QChem-1 Turnaround 2017 –

COMPANY: QATAR ENGINEERING AND CONSTRUCTION WLL, DOHA, QATAR
POSITION: Planning Engineer (RASGAS Company Limited)
16 June 2016 – 18 November 2016

DUTIES AND RESPONSIBILITIES:

• Work with Planning Team to optimize and monitor project plan;
• Develop sequence of activities and prepared detailed schedule for system testing and commissioning.
• Revised logical network of activities and schedule without overly constraining the schedule;
• Prepare detailed Hot Tapping Schedule for final phase of the project, monitored and report daily progress for Hot Tapping;
• Levelled resource and prepared resource histograms;
• Communicated key issue and risk to Project team;
• Preparation of daily, weekly and monthly progress report (Manpower, Equipment, Progress Summary, Project Plan vs. Actual);
• Consolidate, track and update punch list for commissioning;
• Prepare and report delay analysis for management review.

PROJECTS HANDLED:
• Sales Gas Back-up Project – Pipeline Installation

COMPANY: QATAR ENGINEERING AND CONSTRUCTION WLL, DOHA, QATAR
POSITION: Planning Engineer under Estimation & Tender Department

DUTIES AND RESPONSIBILITIES:

• Participate in pre-tender stage to develop suitable contracting strategies to meet the Company’s business objectives. Prepare tender documents for submission.
• Prepare Tender packages such as scope of work, materials & detailed quantity take-off.
• Develop proposed bid lists for management approval.
• Conducting site surveys with other departments to ensure detailed cost estimate.
PROJECTS HANDLED
• SATORP Train 1 Major Turnaround (19 November to 10 December 2016)
• SHELL GTL Slow Down 2017 & 2018 Tender Support (24 April to 31 August 2016)

COMPANY: QATAR ENGINEERING AND CONSTRUCTION WLL, DOHA, QATAR
POSITION: Turnaround Planner/Field Engineer (Qatar Shell Pearl GTL, RLIC)
5 May 2013 – 23 April 2016

DUTIES AND RESPONSIBILITIES:

• Review turnaround work scope, conduct planning site surveys and develop specific step-by-step activities to carry-out the each work scope objective using Roser Systems.
• Prepare and validate initial mechanical isolation requirement of equipment.
• Identify and raise manpower, equipment, special tools and materials requirement of all the activities involved in the work scope through Roser Systems.
• Consult and analyze various technical drawings to identify material specification.
• Coordinate with various technical authorities/focal personnel to develop correct and precise plan and implementation of work scope according to the site standing procedures.
• Coordinate with client/contractor quality and safety personnel to ensure every work scope will be accomplished according to the standing quality and safety standards.
• Provide an initial draft of Job Hazard Analysis of each activity for further discussions and assessment by related personnel.
• Prepare and organize all the documents required on a technical work pack preferred by client using Roser Systems.
• Ensure that a quality work pack will be readily available for Major Turnaround.
• Checking material availability in SAP stock and material ordering.
• Ensuring site activities are executed as planned.
• Monitor schedule, update and report during execution phase.

PROJECTS HANDLED:
• 2016 Train 2 Major Turnaround
• 2015 Train 1 Major Turnaround
• 2014 Q1 SRU/SCOT Slow Down

Adinin Works & Engineering Sdn. Bhd. Brunei Darussalam
Field Engineer/Turnaround Coordinator ( Brunei Shell LNG)

   Aug 2007
— Mar 2013

DUTIES AND RESPONSIBILITIES:

• Conduct site surveys for precise work scope assessment/planning/preparation.
• Prepare job hazard analysis for execution of high risk activities and review with relevant parties.
• Confer with various relevant technical documents/standards and formulate detailed work scope.
• Coordinate with Technical Authorities in establishing the right corrective actions for each major turnaround work scope.
• Develop specific step list/job method statements for every work scope.
• Identify and establish correct manpower requirements to complete a job task.
• Identify all materials required to execute job task.
• Ensure materials, services and special tools availability during work execution through materials tracking and services/special tools provider coordination.
• Prepare and provide detailed work pack for every work scope including all necessary documents such as work scope detail, step list/job method statement, technical datasheet/drawing, vendor’s manual/instructions, calibration/test sheet, material/tool list, inspection test plan, JHA, lifting plan, isolation list, mechanical isolation or blinding list, etc.
• Construct piping isometric drawings including bill of materials using various Engineering Design references (Shell’s Design and Engineering Practice, ASME)
• Routine checking of consumables and material stock then place order for replenishment; Ensure that all tools, equipment and consumables required for the work are identified and in placed.
• Coordinate with area operators to ensure that equipment’s or system were completely isolated and decontaminated/depressurized prior to maintenance activities.
• Provide instructions and additional precautions to the work force (scaffolders, mechanical fitters, pipe fitters, welders, insulators etc.) regarding the work details and execution.
• Ensuring that the project adheres to the quality management system by applying approved procedures and relevant design engineering practices, standards and specifications.
• Supervise/monitor work execution and perform final check list (punch list) prior to mechanical handover completion.
• Ensuring that the site works are performed in an efficient and safe manner within contract guidelines, schedule and contract requirements.
• Hand-back equipment’s or system to Operations upon work completion.
• Prepare and accomplish hand-over documents including box-up permits and other necessary documents.
• Prepare, provide and present progress update including completed work scope, project constraints, or catch-up plans (if necessary).

PROJECTS HANDLED:

• 2013 LNG Train 2 Major TA, Flocculator, Settling Pond, Cooling Tower Pipe Line
• 2012 Nov to 2013 March, NaOCl Line Replacement (Hypochlorite U-PVC Pipe lines)
• 2012 Oct to 2013 March, BLNG Fabrication Workshop Extension
• 2012 Stork Boiler (F5201) Maintenance Shutdown and Bellow Replacement
• 2012 Stork Boiler (F5203) Bellow Replacement
• 2012 Stork Boiler (F5205) MOV & Tube Leak Repair
• 2012 Chlorination Plant Structural Replacement
• 2012 Fire Water Line Relocation
• 2012 Chemical Mixing Tank Replacement
• 2012 LNG Train 4 Major TA, Flocculator, Cooling Tower Pipe Lines
• 2012 Stork Boiler (F5209) Maintenance Shutdown and Bellow Replacement
• 2011 Stork Boiler (F5208) Maintenance Shutdown
• 2011 Badas Line DN500 Miter Joint Replacement
• 2011 Stork Boiler (F5202) Tube Leak Repair
• 2011 LNG Train 5 Major TA
• 2010 OCP Pipe Rack Rejuvenation
• 2010 Train 5 Liquid Disposal Line Replacement
• 2010 LNG Train 3 Major TA
• 2010 Land Flares Relief System Shutdown Maintenance
• 2009 Gasoline Tank Maintenance Shutdown (T4201)
• 2009 LNG Train 1 Major TA
• 2009 LLG Refrigerant Storage Maintenance Shutdown
• 2009 Ethane Tank Shutdown and Structural Platform Replacement (T4302)
• 2009 Liquid Disposal Relief System Maintenance Shutdown
• 2008 Cooling Water Line DN950 Valve Replacement
• 2008 Train 4 Compressor House Structural Rejuvenation
• 2008 LNG Train 2 Major TA
• 2007 Train 5 MCHE Repair
• 2007 Rundown Line Rejuvenation

Search Jobs by Industry