Sr. Piping Designer


Last Updated: 12th October 2018 (over 4 years ago)

Address
Indonesia

Category

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English

Summary

Budi Arpianto
Career spans more than 18 years of professional experience as Piping Designer.

Qualifications
Bachelor Degree

Market Sectors
Offshore Platform Oil & Gas, FPSO, LNG
Power Plant, Petrochemical

Overseas Experience
Turkmenistan (Kyanli - Turkmenbasy)
Malaysia (Johor Bahru)
Singapore

Relevant Awards/Training
-PDMS - MDS
-SP3D
-AutoCAD
-AutoCAD 3D Plant
-Navis work

Languages
English
Bahasa Indonesia

Phones
+62 813 1470 0610

Emails
budiarpianto74@gmail.com

CAREER HIGHLIGHTS

Sr. PIPING DESIGNER
PT. KBR (Kellogg Brown and Root)Inc.
May 2018 – Current, end of contract September 2018, 5 month

Jakarta, Indonesia.

Project :
Abadi LNG Project ( Pre- FEED ) ,INPEX Masela.
Software :Autocad 2D
-Site Master Plant and Plot Plant .
-Equipment Layout based on PFD and UFD also follows requirements from safety Dept.
-Prepare location of Laydown Area.
-Work and Share with other Discipline.

Sr. PIPING DESIGNER

PT. Asia Pacific Rayon (Pulp and Paper Industry)
January 2018 – March 2018, 3 mos

Pekanbaru, Indonesia.
Software :Autocad Plant 3D
-Design piping layout and layout of Equipment.
-Piping Routing from equipment to Equipment based on PID.
-Review and isometric Check.
-Define support location with standard or special support.
-Design and review of location of valve easy to operated and maintenance.
-Review location of laydown area.

Sr. PIPING DESIGNER

PT. KBR (Kellogg Brown and Root), Inc.
March 2011 – April 2017 6 yrs 2 mos

Jakarta, Indonesia.

Project :

* MAERSK OIL Culzean Field Development, an ultra high pressurehigh temperature (UHP/HT) gas condensate development located on Central North Sea, UK.

Software : PDMS/MDS
-Create Equipment base on Data sheet.
-Design and review for nozzle orientation and platform equipment
-Equipment layout base on plot plant.
-Piping routing from equipment to equipment by looking P&ID
-Update Isometric
-Define support location with standard or special support
-Prepare Mechanical Handling, Maintenance Access, Operation access on model

*Pacific Northwest LNG Plant (FEED), PETRONAS Carigali, Sdn. Bhd.
Software : SP3D
-Create Equipments base on Data sheet / Vendor data.
-Design and review for nozzle orientation and platform equipment
-Piping routing from equipment to equipment by looking P&ID
-To do List Updated
-Define support location with standard or special support
-Update Isometric
-Prepare Mechanical Handling, Maintenance Access, Operation access on model

*Mansuriya LNG Plant(FEED) IRAQ, Turkish petroleum.
Software : SP3D
-Create Equipments base on Data sheet / Vendor data.
-Design and review for nozzle orientation and platform equipment
-Piping routing from equipment to equipment by looking P&ID
-To do List Updated
-Define support location with standard or special support
-Update Isometric
-Prepare Mechanical Handling, Maintenance Access, Operation access on model

* Shah Deniz Stage 2 Project (Azerbaijan Development Project).
Engineering service contract with BP ExplorationLtd. Share workwith KBR Leatherhead.
Software : PDMS / MDS
-Create Equipment base on Data sheet.
-Design and review for nozzle orientation and platform equipment
-Equipment layout base on plot plant.
-Piping routing from equipment to equipment by looking P&ID
-Update Isometric
-Define support location with standard or special support
-Prepare Mechanical Handling, Maintenance Access, Operation access on model

* Quad 204 - FPSO,Share work with KBR Singapore.
Software : PDMS / MDS
-Create Equipment base on Data sheet.
-Design and review for nozzle orientation and platform equipment
-Equipment layout base on plot plant.
-Piping routing from equipment to equipment by looking P&ID
-Update Isometric
-Define support location with standard or special support
-Prepare Mechanical Handling, Maintenance Access, Operation access on model

* Browser – LNG Project.
Job Description:
-MTO.

Sr. PIPING DESIGNER

MMHE Sdn Bhd. Malaysia.
Nov. 2009 – Dec 2010 .1 yrs 2 mos
Turkmenistan
.Software : PDMS / MDS
-Create Equipment base on Data sheet.
-Design and review for nozzle orientation and platform equipment
-Equipment layout base on plot plant.
-Piping routing from equipment to equipment by looking P&ID
-Update Isometric
-Define support location with standard or special support
-Prepare Mechanical Handling, Maintenance Access, Operation access on model
Project :
* MCR-A topside. Caspian Sea.
* Gravity based structure ( GBS ) Caspian Sea
.

Sr. PIPING DESIGNER

SIME DARBY Engineering sdnBhd, Malaysia.
May. 2008 – Nov. 2009 .1 yr 7 mos
Johor Bahru, Malaysia.

Software : PDMS / MDS
-Review and check Isometric
-Define support location with standard or special support
-Design and review for nozzle orientation and platform equipment
-Prepare Mechanical Handling, Maintenance Access, Operation access on model
-Line checker at field engineering
-
Project :
* Kumang Central Procecing Platform.
* Tangga Barat Cluster Gas and Condensate Field.

FIELD ENGINEER

PT.PelitaMustikaMandiri
July. 2007 – March 2008 . 9 mos
Jakarta, Indonesia.

- Rental and provide Installation of Offshore / Onshore Facilities of mud cooler.
* Client Conocophilips, Chevron.

3D DESIGNER

PT.Alstom Power System Indonesia
Dec. 2004 – May 2007 .2 yrs 6 mos
Surabaya, Indonesia.

Software : PDMS / MDS
-Piping routing from equipment to equipment by looking P&ID
-Define support location with standard or special support
-Design and review for nozzle orientation and platform equipment

* Project HRSG :Castejon, Langage Energy Centre, Grain, Aghada

ENGINEER

PT. Plimsoll Indonesia
Aug. 2003 – Sep. 2004 1yr 2 mos
Surabaya, Indonesia.

Rental and provide Installation of Offshore and Shipping Facilities Winches, Bollard etc.

DRAFTER

PT. Pan United Shipyard Indonesia
Feb. 2002 – July. 2003 .1 yr 6 mos
Batam, Indonesia.

-Piping Layout, Piping section, Isometric, MTO Report.
-Scope of work in repair and new shipbuilding

DRAFTER

PT. Duta Marina Shipyard ( Dumas) INDONESIA.
April 1998 – Dec. 2001 .3 yrs 9 mos
Surabaya, Indonesia.

-Piping Layout, Piping section, Isometric, MTO Report.
-Scope of work in repair and new shipbuilding

Search Jobs by Industry

Ad
Ad
Ad