Summary

A dynamic professional with 11 years of experience in the field of Project Management, Operations & Maintenance, Erection & Commissioning, Manpower & Vendor Management. Deft in end-to-end Project Management encompassing planning and executing activities such as erection, commissioning, quality and resource management.

A strategist with expertise and a flair for adopting modern technologies and best practices in compliance with industry standards. Proven abilities in managing erection & commissioning of equipments. Comfort in liaising with people at any level of business as well as regulatory agencies for smooth task execution. Gained rich knowledge of power plant utilities/equipments like generators, safety systems, switch gear, high voltage cable routing, voltage regulators and protection systems.
Conversant with power utility interconnections, substation design and facilities power design.

Performed various tasks of designing & Erection of power distribution, earthing, grounding, motor control, lighting, control systems, protection systems, and SCADA systems. An effective communicator and rational thinker with good interpersonal skills at all levels and lays strong emphasis on teamwork, handles stress and deadlines with ease. Adapts well to changed situations and continuously seeks to upgrade personal knowledge and skills.

Education

Annamalai University
Bachelor of Engineering (Electrical & Electronics)

   Aug 2002
— May 2006

Experience

RAK ceramics Power plant
Electrical & Distribution Engineer

   Oct 2009
— Current

 Handled operations & maintenance of 60 MW plant 3 * 5.6 MW Gas Turbines & 6 * 7.5 MW Engines Synchronous AVK Alternator type (M171) with Brushless Excitation & AVK Make Digital Automatic Voltage Regulator.
 Handled Erection, Commissioning, and Operations & Maintenance for Solar Gas turbine (Taurus-60) with Combine Heat Power Plant.
 SOLAR TURBINES (TURBO MACH), Taurus 60, Single shaft turbine with open cycle and cold end drive, 12 stage compressor type turbines with compressor ratio is 12.2:1, combustion chamber system is standard: annular with 12 injectors, turbine is 3 stages, gas turbine speed 14,944 rpm.

 LEROY SOMER Alternator with brushless excitation, 6750kva rated power output, Rotational speed:1500rpm

 ENER PROJECT Gas booster unit with suction flow:220m3/hr, suction pressure:10bar,suction discharge:19bar,motor capacity 112kw,rotating speed :2980 rpm/1/min.

 Involved in managing major Maintenance for Solar Gas Turbine (Taurus-60), CAT 16CM34 Gas Engine and MAK 16CM32 HFO (Bi-Fuel) Engine.
 Familiar with SCADA operations of Power Plant & Transmission, Regular Maintenance & Trouble shooting of the same, Carried out SCADA Upgrades & Commissioning.
 Handled power plant automation system for engines using BERGHOF CANtrol module’s (C1CPU ,CDIO ,RDIO ,QAIO , QDIO, RTEMP) , Woodward controllers , ECM (Engine control modules),CMC,CMG .
 Calibration of Thermocouples (J, K, S, PT100, RTD Types), Pressure transmitter, differential pressure, level sensors using FLUKE 721 calibrators.
 Responsible for all calibrations, installations, maintenance & maintaining records as per standard for ISO Audit.
 Handled all kinds of Control Room Operations, Power Management of Loads & controlling other shifters with proper Instructions & Planning.
 Looked after variable AC drives rating from 0.7 to 355 KW motors.
 Root cause analysis of breakdowns, trips & equipment failure
 Operation and Maintenance of SF6, ACB, VCB (REYROLLE’S, SIEMENS, ABB, SCHNEIDER, MERLIN GERIN).
 Active member of Area Effectiveness team for reducing the production cost without compromising on quality.
 Evaluation of studies for new equipment erection and Upgrading the existing Plant &
Machinery
 Monitored maintenance of 33/11KV grid substation, protective relays & associated equipments.
 Familiar in Grid Paralling Operations and Load shedding operations.
 Worked on:
o Transformers 10MVA 33/11 KV, 1500 KVA 11/.415 KV.
o HT/LT Switchgear & Allied Protection System.
 Responsible for all 11 KV Cable networks of RAK Ceramics Power Plant Distribution Systems such as MV breakers, RMU, Transformers etc.
 Managed erection & commissioning of 11 KV RMU ‘S, MV Breakers & Switchgears.
 Proactively organized field investigations and prepared facility condition assessments.
 Responsible for preparing the consumption & Cost Reports of Power Distribution & Generation Plant.
 Handling all kinds of Cable faults finding and megger of cables and to rectifying the problem of 11KV Cables.
 Responsible for smooth operation on power production & distribution to customers.
 Active group member of New Co-Generation plant & responsible for Erection & installation of Turbo Mach (Tarus-60) turbine, Synchronizing Panel, Safety systems of turbines, Neutral Earting & MV Breakers.

Neycer India Limted
Electrical Engineer

   Jan 2007
— Sep 2009

 Monitoring and ensuring smooth and safe operation of all the electrical m/c & instruments
 Practiced improved methods Operation and maintenance of Field Instrumentations and Smart Transmitters. (Temperature, Level, Flow, Pressure, Conductivity, On-line Analyzers, Load cell systems, Control valves, Gas / Oil burned Boiler and Hot Air Generator (25M3/Hr at 350 Dec C) etc.
 Programming of OMRON PLC (CQM21, 41, 1) &Inverters (Mitsubishi, Omron, Yakasawa, Sirco.
 Erecting & commissioning of panel boards, machinery& Main distribution boards
 Evaluation of studies for new equipment erection and Upgrading the existing Plant &
Machinery. Co Ordination with Production Department for Equipment Performance run, Annual Turn
Around (ATA) Planning and Shutdown Planning.
 Active member of Energy Audit Team and given proposals to the management for saving energy which is under consideration.