PM, CM, Mechanical Engineering, Consultancy


Last Updated: 4th January 2019 (over 3 years ago)

Address
Turkey

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Degree

Languages
English, Turkish

Summary

Bahadir Iskender ERDOGAN
GSM: +90 543 395 49 91 (in Turkey)

misterbie@excite.com or misterbie@yahoo.com

PERSONEL DETAILS
Birth Date : 05.12.1964
Marital Status : Widow
Military Status : Completed
Driving License : E 1988 Active
Health : Well

EDUCATION
University : 9 EYLUL UNIVERSITY -1988
Dept. : Mechanical Engineer
High School : Karatas High School - Izmir
Language : English – Fluent
CK : Auto-CAD 2015 (excellent), MS Office (excellent), Primavera (middle level)

WORKS SUMMARY
0-) Yamata Piping Group Sec Chief Russia Zibzap2 Project 03/2018 to 10/2018
1-) Italconsult Senior Mechanical Engineer Saudi Arabia KAP5 Project 01/2015 to 12/2017
2-) ENKA Mech. Prefabrication Site Manager Russia STU-300 05/2013 to 07/2013
3-) 77 Construction Mechanical Construction Manager Afghanistan + Basra/Iraq Multi Projects 12/2012 to 08/2014
4-) CCC Mechanical Site Superindentent Turkmenistan Gas Field Development 01/2012 to 11/2012
5-) 77 Construction Mechanical Construction Manager Afghanistan Multi Projects 01/2010 to 01/2012
6-) Enka Teknik Construction Mechanical Construction Manager Libya Desalination Projects 01/2009 to 12/2009
7-) SAIPEM Mechanical Site Superindentent Saudi Arabia GOSP2 Rafinary Project ARAMCO 07/2008 to 12/2008
8-) Alarko Alsim Mechanical & Construction Site Gen. Superintendent Kazakhistan Multiple Water Projects STP+WTP+PS 06/2006 to 07/2008
9-) Metis Cons. Company Mechanical Construction Chief Libya Water Pipeline & Pump Station P. 08/2005 to 06/2006
10-) Fernas Site Manager Turkey Crude Oil Pig Station 03/2005 to 06/2005
11-) HT Engineering Site Manager Turkey BTC-BOTAS Bacu C. Oil PT2 Station 08/2004 to 03/2005
12-) Kirdar Const. Workshop Chief Engineer Turkey Antalya Airport Fuel System 04/2004 to 07/2004
13-) OSM Tesisat Chief Engineer Turkey Elda Drinking Factory 02/2004 to 04/2004
14-) Genta Chief Engineer Turkey Vestel Hi-End Factory 06/2003 to 10/2003
15-) Egecev Maintenance Team Chief Turkey Maintenance + Extension 09/2002 to 06/2003
16-) HT Engineering Project & Site Engineer Turkey 38 mW Diesel Power Plant 06/2001 to 11/2001
17-) Polinas Plastic Company Maintenance & Utility Chief Engineer Turkey Maintenance Workshop 06/1988 to 07/2000

WORKING EXPERIENCE

03/2018 – 10/2018
Employer : Yamata
Project Name : ZIBZAB2 Projects – RUSSIA
Position : Piping Group Sec. Chief

Project description : Polyethylene Cracking Unit.
Project Construction Cost : ~600.000.000,00 USD in total
Tasks & Performed Activities : Piping works, approx 650000 WDI, process piping. Managing works, teams and site equipments in order to work flow. Preparing necessary reports to the client. Mission complished.

01/2015 – 12/2017
Employer : ITALCONSULT
Project Name : KAP5 Projects – SAUDI ARABIA
Position : Senior Mechanical Engineer

Project description : Develop the security headquarters of the Interior Ministry – Phase 5.
Project Construction Cost : ~2.500.000.000,00 USD in total
Tasks & Performed Activities : In mechanical side controlling all desing drawings (Fire Fighting, HVAC, Plumbing and Mechanical Equipments) in accordance of project standarts and contract requirements (Consultancy).

05-2013 / 07-2013
Employer : ENKA Insaat ve Sanayi A.Ş.
Project Name : Construction of the 3rd power unit based on STU-800 of the branch Berezovskaya GRES of JSC E.ON Russia
Position : Mechanical Prefabrication Site Manager
Project description : My responsibility on this project was; coordination of all engineering and mechanical pre-fabrication site activities for the construction of Thermic Santral 3rd stage. Manufacturing of all ducts elements for installations, spool fabrications for piping, fabrication of steel structures & supports elements for internal structure of the Boiler. Managing the subcontractors, crews & site engineers, controlling the material and transportations, documentations, modifications, controling the progress of pre-manufacturing activities based on schedule. Manufacturing stage completed.
12/2012 – 08/2014
Employer : 77 CONSTRUCTION COMPANY
Project Name : USS BAGRAM Waste Management Project – Afghanistan BASRA OIL FIELD & USS Leatherneck Base Mechanical Modifications Projects – AFGHANISTAN / IRAQ
Position : Mechanical Manager

Project description : Installation of Waste Management Complex on Afghanistan Bagram Base.
In Basra Mobilisation for camp and batch plant
Rafinery extension works for Hyundai & Lukoil
In Afghanistan Extension of present waste management facility
Project Construction Cost : 29.500.000,00 USD in total
Tasks & Performed Activities : Coordination of mechanical activities for all projects in Afghanistan & Iraq. Preparing necessary material lists, controlling marketing activities, purchasing, submittals and approvals of materials. Providing necessary crews for sites. Clarifying subcontractors, organizing manpowers, preparing work schedules for constructions.

In terms of Construction on those bases;

BAGRAM: Installation of 2 heavy duty incinerator and utilities, completion of test run and hand over to the client. Training of crews.
HVAC, water and plumbing works for 5 service and managing buildings and 5 big size shelter for material handling, separating and controlling.
Installation of potable water & sewer and fire piping networks, fuel systems for complex.
All water and fuel systems are tested, commissioned and hand it over to the client.

BASRA: Installation of water network & sewer network, installation of batch plant, camp facilities. Lay-down area preparation and installation of steel platforms for oil well in Lukoil. Preparation of camp base for Hyundai company.

LEATHERNECK: Installation of 2 heavy duty incinerator and utilities (Fuel and water systems) in Leatherneck base.

01/2012 – 11/2012
Employer : CCC / TURKMENGAZ / PETROFAC
Project Name : South Yoloten Galkinish Gas Field Development Project, Turkmenistan
Position : Mechanical Site Superindentent
Project description : The feed gas from the field contains up to 6% H2S, and the development includes gas treatment and sulphur handling facilities, along with well pad facilities, gathering facilities, infrastructure and utilities, condensate processing, storage and 100 kilometres of 56” export pipeline. ( 10 billion cubic metres of gas per year )

Scope of CCC : All Civil, Structural, Mechanical, E&I, construction and pre-commissioning works of CPF ( Central Processing Facility '' Train 1A , 1B, 2A, 2B & Main PipeRack '', 2 Power Stations, 4 LERs )
Project construction cost : $3.4 billion
Tasks and performed activities : Coordination of engineering and mechanical site activities for the construction of natural gas plants on 4 trains. Installation of all & heavy equipments (Upto 450 pcs and approx. ~14260 ton Vessels, Reactors, Amine Columns, Fin Fan Coolers, Exchangers, Filters, Reaction Furnaces, Thermal Oxisidisers, Air Heaters, Blowers and Pumps, etc) at site. Supporting the steel structure department for installation of the all train pipe racks (approx 25000 ton), organization of welding crews, managing preservation activities for all equipments. Controlling and managing the subcontractors and progress of the site works in accordance with the work schedules. Keeping records and preparing the necessary reports for management. Coordination of documentation activities between Petrofac and CCIG. Mission completed, currently possess completion certificate.

01/2010 – 01/2012
Employer : 77 CONSTRUCTION COMP
Project Name : USA Bastion Airport Extension, Water Distribution Network & Storage Tanks, Incinerator Projects, USA Dwyer Airport & Camp Extension, Water Distribution & Underground Storage Tanks Projects, USS Wolverine Camp Water Network & Sewerage Projects, USS Geronimo & USS Payne Bases Mechanical Modifications Projects – AFGHANISTAN
Position : Mechanical Manager
Project description : Multi point new construction and extension projects in Afghanistan on different bases.
Project construction cost : total 70.000.000,00 USD
Tasks and performed activities : Coordination of mechanical activities for all projects in Afghanistan. Preparing necessary material lists, controlling marketing activities, purchasing, submittals and approvals of materials. Providing necessary crews for sites. Clarifying subcontractors, organizing man powers, preparing work schedules for construction.

In terms of construction on those bases;

Construction of waste management complex with 2 heavy duty incinerator and utilities. Construction of concrete pists for plane and helicopter landing zones. Steel construction of maintenance hangars, accommodation and training facilities, hvac systems, steel water tanks, water wells, water treatment systems and waste water treatment systems, diesel storage and fuel systems for generators, sanitary systems and necessary utilities, foam & sprinkler type full automatic fire fighting systems, fuel distribution systems for helicopters and aircrafts. Mechanical equipments, piping and plumbing systems installation on site. Controlling and managing the site crews and progress of the site works in accordance with the work schedules. Organizing documents, clarifying of necessary materials and equipments. Keeping records and preparing the necessary reports. Coordination of mechanical activities between 77 Constructions and the Client.

Project Name : USA FERNANDEZ HELICOPTER LANDING PAD AND MAINTENANCE BASE PROJECT, IRAQ, BAGDAT
Position : Project Manager
Project description : Building an army helicopter landing and maintenance base with all facility.
Project construction cost : 45.000.000,00 USD
Tasks and performed activities : Coordination of all activities for the construction of helicopter landing pad and maintenance base in Bagdat, Iraq. On this base built concrete pad, steel constructions of maintenance hangar, hvac systems, potable water systems and wastewater systems, diesel storage systems for generators, sanitary systems and necessary utilities, foam & sprinkler type full automatic fire fighting systems. My mission on this base was to prepare work schedule for installations, preparing of the material lists for purchasing, installing of hvac systems, fire fighting systems, fuel systems for generators, mechanical equipments and plumbing systems for site. Controlling and managing the all crews and progress of the site works in accordance with the work schedule. Organizing documents, clarifying of necessary materials and equipments. Keeping records and preparing the necessary reports. Coordination of civil, electrical and mechanical activities between 77 Constructions and the Client. Completion & hand over stage, demobilization of the site.

Project Name : USA PAYNE BASE PROJECT, AFGHANISTAN
Position : Mechanical & Construction Site Chief
Project description : Building an army base with all facility.
Project construction cost : 22.000.000,00 USD
Tasks and performed activities : Coordination of engineering and mechanical activities for the construction of army base on the South of Afghanistan. Prepare work schedule for installations, preparing of the material lists for purchasing, designing hvac systems, fuel systems for generators and plumbing systems for site, approx. 3000 person a day DFAC (dinning facility and kitchen), laundry, latrine and showers. Controlling and managing the site crews and progress of the site works in accordance with the work schedules. Organizing drawings, documents, purchasing of necessary materials and equipments. Keeping records and preparing the necessary reports for management. Coordination of mechanical activities between 77 Constructions and the Client. Completion and demobilization of mechanical activities

01-2009 / 12 – 2009
Employer : ENKA TEKNIK CONSTRUCTION / General Electricity Company of Libya (GECOL)
Project Name : Supply and Erection of Soussa & Derna Desalination Plants / LIBYA
Position : Mechanical Construction Manager
Project description : Turn-key engineering, supply, construction, erection and commissioning of a sea water desalination plant to produce 40.000 cu.m per day of potable water.for each plant
Project construction cost : Confidental
Tasks and performed activities : Coordination of engineering and mechanical activities for the construction of two desalination plants in different cities. These plants include same type Desalination units for producing potable water from the Sea Water. There are 2x20000 m3 PWST + 2x5000 m3 HFO Storage tanks, 40000 m3 per/day capacity potable water product system (Evaporators, boilers, product water systems, intake water system from sea, off shore piping, chlorination units, cs/ss/grp/pe/dip/hdpe piping, steel structures & buildings, etc.) and necessary utilities on each plants. Prepare work schedule for installations. Controlling and managing the subcontractors and progress of the site works in accordance with the work schedules. Organizing drawings, documents, purchasing of necessary materials and equipments. Keeping records and preparing the necessary reports for management. Coordination of mechanical activities between Enka Teknik, Sidem, Acesco and Gpcoewg. Managing of the comissioning activities, start-up run tests and preparation of the demobilization. Hold a Job Completion Certificate

07-2008 / 12-2008
Employer : SAUDI ARABIAN SAIPEM Ltd.
Project Name : KHURAIS GOSP PROJECT, SAUDI ARABIA
Position : Mechanical Site Superindentent
Project description :Gas – Oil separation plant constructions.
Project construction cost :The total project cost is estimated to be about $10bn
Tasks and performed activities :Installation of the main water injection and suction lines for 5 high pressured sea water injection pumps to the crude oil sources and slipper area pipings, fittings and valves. Controlling the fabrication of the necessary spools. Supplying & providing of necessary materials for manufacturing and installation. Controlling the subcontractors, managing the site crews. Planning of site activities. Modification of prefabricated spool isometrics. Organizing document & drawings, keeping the records and preparing the necessary documents for the site. Coordination of the mechanical activities between Saipem, Snamprogetti, Tekfen, CCE & Aramco

06-2006 / 07-2008
Employer : ALSIM ALARKO CONSTRUCTION
Project Name : ASTANA WATER SUPPLY & SEWERAGE PROJECT, KAZAKHISTAN
Position : Mechanical & Construction Site Gen. Superintendent
Project description : This project included 6 different plants;
• New construction of intake water pump stations and facilities, (pump station in the middle of the lake (off – shore), pumps, piping, necessary fittings installations, surge systems and buildings, control buildings, reinstatements, etc.)
• New construction of water treatment plant, (water treatment building, receiving well, pump stations, distribution collectors, network connections, completely revising all internal pipes and external connections of the plants, etc.)
• Modernization and capacity upgrading of sewerage treatment plant, (pump stations, sedimentation tanks, dearation systems, metan gas systems, blower houses, chemical treatment units, drying beds, boiler systems, changing of internal and external piping, sand filters, grid chambers, etc.)
• Modernization and capacity upgrading of city network 13 pieces sewerage pump stations, (pumps, cranes, pipings, fittings, external connections, civil rehabilitations, electrifications, etc.)
• Construction of the five new sewerage pump stations for city network,
• Underground pipeline installation for city network for potable water and sewerage system, (Steel, DIP and HDPE pipe line installations in the city network)

Project construction cost : 21.361 billion yen
Tasks and performed activities : Designing, controlling, preparing and managing all kind of mechanical activities and crews for all these plants. Prepare work schedules, managing maintenance operations (sometimes civil operations), site preparation & mobilization. Organizing and scheduling of material, manpower and equipment necessarities for all activities. Designing of site application details for all mechanical equipments, preparation of work schedules every plant in the project. Development of necessary Method Statements for all mechanical activities. In site, managing the mechanical teams, backfilling rock in to the lake for access road of Intake buildings ( appr. 20.000 m3 ), designing of steel structure for warehouses & workshops. Preparation of sewerage treatment plant & intake pump station plant camp site, starting civil activities at site, preparation of necessary material lists for newly constructed & rehabilitation of the buildings at site. Excavation, piling activities and preparation of subbase for civil buildings and necessary utilities for construction. Installation of the pipelines for potable water for city networks. Mechanical equipment and piping erection for Water Treatment & Sewerage Treatment Plants. Preparation of the necessary isometrics for structural and yard piping, organizing of the crews. Reporting all activies to the PM, consortium partners and engineers. Full responsibilty for mechanical side of the project, coordination of the mechanical activities between the consortium partners and engineers.

08-2005 / 06-2006
Employer : METIS CONSTRUCTION
Project Name : GREAT MAN-MADE RIVER PUMP STATIONS 1-2 & 64” PIPELINE PROJECT, LIBYA
Position : Mechanical Construction Chief
Project description : Building of turn key 2 pump station, reserve tank and pipe line.
Project construction cost : N/A
Tasks and performed activities : Preparing work schedule, organizing manpower, controlling and examining schedules. Providing work order and successful process, preparing calculation documents, periodic reports for project manager, head office and controller firms (GMRA-BRNA-ANC), providing site organization according to the project, controlling installation of mechanical equipments, pipe isometrics and pipe installations, buildings, site preparations, controlling the pre-fabricated spools in workshop, and their documentations, preparing welding map and its records, controlling the purchasing, managing work crew according to the procedure and keeping their records regularly.

03-2005 / 06-2005
Employer : FERNAS CONSTRUCTION
Project Name : BAKU-TBLISI-CEYHAN Crude Oil Pipeline Project BTC-BOTAŞ IPT-2 STATION, KARS TURKEY
Position : Site Manager
Project description : Building of PIG STATION for crude oil pipeline
Project construction cost : 28.000.000,00 USD
Tasks and performed activities : Preparing work schedule, organizing manpower, controling and following schedule. Organizing work order to be in a proper way. Organizing the payment documents for the works which have been done. Preparing the periodic reports for project manager, head office and controller firms (BTC-BOTAŞ). Providing site organization and works according to the project. Controling installation of mechanichal equipments ( Scrappers & block valves and etc. ) pipe isometrics and pipe installations, buildings, site preparations, internal – external ( access ) roads at construction site IPT-2, Controlling Pre-fabrication spools in workshop and their documentations. Preparing the welding maps and its records. Managing the work crew according to the procedure and keeping their records regularly.

08-2004 / 03-2005
Employer : HT ENGINEERING
Project Name : BAKU-TIBLISI-CEYHAN Crude Oil Pipeline BTC-BOTAŞ PT-2 STATION, ERZURUM TURKEY
Position : Site Manager
Project description : Mechanical installation and piping of Pump Station for crude oil pipeline
Project construction cost : 2.000.000,00 USD
Tasks and performed activities : PT-2 Station Construction Site: Preparing work schedule, controlling and following shedule. Organizing work order to be in a proper way. Preparing the payment document for the works which have been done. Preparing the periodic reports for head office and controller firms. Managing site organization and the work we were doing according to the project. Controlling installation of mechanical equipments ( Main Pumps & Marine Diesel Engines ), pipe isometrics and pipe installations in pumphouse and utility buildings, Controlling Pre-fabricated spools in workshop, and their documens. Preparing welding maps and records. Managing work crew according to the procedure and keeping their records regularly.

04-2004 / 07-2004
Employer : KIRDAR Taah. Ve Tic
Project Name : ANTALYA AIRPORT Fuel storage systems renevations
Position : Workshop Chief Engineer
Project description : Manufacturing of carbon steel and stainless steel tanks and pipe spools and erections.
Project construction cost : 500.000,00 USD
Tasks and performed activities : Manufacturing of carbon steel and stainless steel tanks, steel pipe-support beams and pipe spools for Antalya Airport fuel storage systems and related buildings. Controlling the materials, suppliers and subcontractors.

02-2004 / 04-2004
Employer : OSM TESISAT LTD.
Project Name : Elda Raki Factory
Position : Chief Engineer
Project description : Construction of raki factory.
Project construction cost : 100.000,00 USD
Tasks and performed activities : Drawing pipe isometrics of mainline and distillation systems for Elda Raki Factory, controlling subcontractors, managing the mechanical equipment installations. Hand over to the client.

06-2003 / 10-2003
Employer : GENTA LTD
Project Name : VESTEL Hi-End TV Factory, MANISA, TURKEY
Position : Chief Engineer
Project description : Construction of fire lines and water distribution lines in factory.
Project construction cost : 300.000,00 USD
Tasks and performed activities : Managing installation of pipe lines, support beams and mechanical equipment, fire lines and equipments, preparing a utility rooms for water & pressured air systems. Installing heater and cooler system equipments and controlling subcontractors.

09-2002 / 06-2003
Employer : EGECEV LTD. IZMIR
Company Name : N/A
Position : Maintenance Team Chief
Project description : N/A
Project construction cost : N/A
Tasks and performed activities : Preparing schedule and preventive maintenance systems, controlling maintenance works. Managing installation of new production lines on factory, designed of new production machines and equipments for company. Preparing project, organising productions, designing warehouse.

06-2001 / 11-2001
Employer : HT ENGINEERING
Project Name : BIRLIK ENERJI DIESEL POWER PLANT, DENIZLI TURKEY
Position : Project & Site Engineer
Project description : Mechanical installation and piping of 38mW Diesel power plant
Project construction cost : 1.500.000,00 USD
Tasks and performed activities : Installation of MAN 38mW diesel power plant. Organizing the storage system productions of 2x5000 tons & other tanks with various capacity. Installation of pumps and purifier systems, seperators, heat reclaiming systems, pipe lines and desulfurization systems, planning & reporting of daily activities.

06-1988 / 07-2000
Employer : POLINAS PLASTIC COMPANY
Company Name : N/A
Position : Maintenance & Utility Chief Engineer
Project description : N/A
Project construction cost : N/A
Tasks and performed activities : This company is the largest one in the world for Biaxsually Oriented Polyprophylene packaging film manufacturing. I worked as maintenance and utility engineer in this company. During my working periods, I had enough experience about plastic machinery, packaging machinery, every kind of extruder system, full automatic mechanical sistems, plc controlled systems, different kind of measurement systems and utility systems and their maintenance works. Utility systems includes chillers, boilers, water treatments, circulation of hot pressured oil and water systems. By the way, I had enough experience maintenance of lifting equipments, conveying systems, heavy work machines. In this case controlling implementation of schedule & daily maintenance, preventive maintenance, revisions, modifications for BOPP production lines, metallizing machines, slitting machines, printing line with 9 colorable, lack & lamination line, CPP-MOPP line, boilers & hot oil circulation systems, compressor machines & utilites, reclaiming systems (shredders, pneumatic conveying systems, pelletising machines and granulators etc.), cooling water tower & circulations systems, water treatment systems, many conveying, transporting, lifting and carrying eguipments. Managing building of barcode & automatic level controlled systems for appr. 5000 pieces warehouse. Organizing installation and maintenance of 10mW diesel co-gen systems. Preparing daily and annual work shedules, Active mission on ISO-9000 quality systems and international hygiene systems. Good knowledge about hydrolic, pneumatic systems and enough experience for maintenance, working in Project dept. for building 6 new lines & working with foreign supervisors, controlling subcontractors.

SEMINARY & CERTIFICATE
SKF / Bearing & Monitor / Seminary & Certificate
TSE / AUDITOR / Seminary & Certificate
IBM Microsoft / DOS, EXCEL, WORD / Courses & Certificate
SIMCO / Static Electric / Seminary
MESS / Human Relations / Seminary & Certificate
NATIONAL BRITANNICA / International Hygene / Seminary & Certificate
VIBRATEK / Vibration Analysis / Seminary & Certificate
KOSGEB-SEGEM / Development Of Management / Seminary & Certificate
TOMSFED / International Pist Car Racing Driver Licence / Courses & Certificate
BTC-BOTAS / Health & Safety / Seminary & Certificate
BTC-BOTAS / Passive Drive / Seminary & Certificate

HOBBIES
Car-Racing, Gardening, Internet Searching, Wood-works, Aquarium, Chess, Cinema, Reading, Traveling

REFERANCES
Avaible upon request.

Search Jobs by Industry

Ad
Ad
Ad