CATERPILLAR GAS AND DIESEL ENGINE CO - GENERATION CHIEF ENGINEER.


Last Updated: 23rd May 2017 (over 5 years ago)

Address
Pakistan

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Degree

Languages
English, Punjabi, Urdu

Summary

1.85 Tons D.D.F.C DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler.
2.26 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler. Installation
3.00 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler
and erection with all auxiliaries, equipment and controllers. On Jacket Water Heat Recovery installed 150 U.S.R.T L.G Model # L W M - 027 Single Effect Hot Water Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals. Planed all Required Top –End overhauling and in Frame over Hauling and Major overhauling as per O.E.M Engine Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing. Maintain spare Parts, Gas and Diesel Engine.
Fuel Oil, Engines Lube Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water Cooling Water Hot Water Daily and Weekly Chemical Dozing Report Checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Attend In House Fire and Safety Courses, Seminars and drills and Collaborate Mills Fire and Safety Department in Emergencies. Timely Submitted all correspondence reports and mails discussed b / w Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning and Maintenance and arrange meeting to achieved all targets for save Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water and Cooling Systems Water, Machine Load and all Auxiliaries Load properly manage and day time energy saving Issues.

SPECIALTIES.

Gas Engine Co – Generation Captive Power Plant fabrication.
Gas Engine Co – Generation and Diesel Engine Captive Power Plant Maintenance Planning.
Gas Engine Co – Generation and Diesel Engine Captive Power Plant Operations.
Gas Engine Co – Generation and Diesel Engine Captive Power Plant Maintenance & Services
Gas Engine Co – Generation and Diesel Captive Power Plant Installation.

ENERGY CONSERVATION.

Jacket Water and Engine Exhaust Heat Recovery System installation, Erection and commissioning.
Engine Exhaust Fire Tube Waste Heat Recovery Boiler Installation, Operation and Maintenance.
Single Effect Hot Water Absorption Chiller Installation, Operation and Maintenance.
Cooling Tower Installation and Maintenance.
Softening Plant installation Operation.

Education

MEHRAN UNIVERSITY OF ENGINEERING AND TECHNOLOGY JAMSHORO HYDERABAD
B, Tech Pass

   Mar 1998
— Feb 2001

MECHANICAL ENGINEERING.

Experience

LIBERTY MILLS LIMITED
CHIEF ENGINEER

   Nov 2011
— Current

As Chief Engineer look after all activities of 4 EK Series G - 3516 A, G - 3516 B, G - 3516 C & newly installed G – 3520 E Dry Manifolds.
Caterpillar Gas Engine Co - Generation Captive Power Plant
CAT GAS G - 3516 A SERIES 965 K.W X 1 = 0.965 M.W
CAT GAS G - 3516 A SERIES 1005 K.W X 1 = 1.005 M.W
JENBACHER GAS JGS - 420 (B311) SERIES 1500 K.W = 1.500 M.W
CAT GAS G - 3516 CSERIES1450 K.W X 1 = 1.45 M.W
CAT GAS G - 3520 E SERIES 2022 K.W X 2 = 4.044 M.W
PLANT CAPACITY = 8.964 M.W
1005 K.W X 2 CAT DIESEL = 2.010 M.W STAND BY DIESEL GENERATORS.

Co – Generation Installation and erection work.

1.85 Tons D.D.F.C DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler.
2.26 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler. Installation
3.00 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler
and erection with all auxiliaries, equipment and controllers. On Jacket Water Heat Recovery installed 150 U.S.R.T L.G Model # L W M - 027 Single Effect Hot Water Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals. Planed all Required Top –End overhauling and in Frame over Hauling and Major overhauling as per O.E.M Engine Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing. Maintain spare Parts, Gas and Diesel Engine.
Fuel Oil, Engines Lube Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water Cooling Water Hot Water Daily and Weekly Chemical Dozing Report Checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Attend In House Fire and Safety Courses, Seminars and drills and Collaborate Mills Fire and Safety Department in Emergencies. Timely Submitted all correspondence reports and mails discussed b / w Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning and Maintenance and arrange meeting to achieved all targets for save Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water and Cooling Systems Water, Machine Load and all Auxiliaries Load properly manage and day time energy saving Issues.

Ad
Ad
Ad