
Maintenance Manager
Last Updated: 29th July 2019 (over 3 years ago)
Summary
Education
Becholer of technology in Mechanical
Oct 2000
— Apr 2004
Experience
Site Engineer cum maintenance manager
Jul 2018
— Current
Preparing the Budget for the Maintenance and Development Activities.
Using the latest techniques to diagnose the causes of breakdown i.e. Why Why Analysis, Fish bone diagram Analysis, Health Survey for the equipment and processes to reduce the breakdowns and safe usage.
Implementing the GMPs and 5S.
Managed the contractors and 3rd Party vendor in term of optimize the cost for maintenance activities and fabrication and installation of equipment and arranging the other facility requirements.
Full filling the reequipments to compliance with EHS.
Preparing the proposals for new equipment for maximize the productivity.
Facility manager
Apr 2018
— Jul 2018
Execution of Utility connection Projects for Potable water Industrial Waste Water, Storm Water etc.
Coordination with Royal Commission for executing the Utility metering Station.
Commissioning of Industrial waste Water Treatment Plant.
Managed the contractors and 3rd Party vendor in term of optimize the cost.
Contribute to manage the EHS department.
Mechanical engineer
Dec 2011
— Apr 2018
Prepared and Reviewed the Scope of Work, BOQ and Contract and identified the additional work and intimated to the Client.
Prepare and review Purchase order, variation order and RFQ package for Rotating &Static Equipments and other Mechanical Systems.
Prepare the technical Submittals, Progress Reports, Invoicing, Punch list, GAP Analysis and other documentation.
Being involved in Testing, Commissioning and Handover Activities and maintenance Rotating &Static Equipments and other Mechanical Systems during the Warranty period.
during the Warranty period.
Provide Technical Support to the field in identifying and rectifying problems related to all type of Mechanical installation, Operation & Maintenance which are include all type of Process Piping(SS,CS, PP, PVDF), HVAC, Plumbing, Firefighting and Rotating & Static Equipment (Pump, vessels, Steel Structure, tanks & cable tray, air compressors, vacuum compressor heat exchanger and process machines), rubber lining and brick lining applications.
Coordination with other disciplines like Civil, Structure, Electrical, PLC/ DCS systems.
Reviewed Mechanical Construction Drawings (Fabrication drawings, Plans, Isometric, and P&IDs Shop Drawing, Detail Drawing and As-Built Drawings etc.
Managed the Outsources by subcontractors, third parties & vendors for cost optimization.
Attending progress review meetings with client & sub-contractors.
Co-ordination with Engineering and Production for Drawing clarification and Material Specification.
Reviewed the progress work to ensure progress as planned and to control any slippage.
Suggested the stock of spare Part list for the Rotating & Static equipment static equipment.
Provided the Preventive Maintenance Schedule and list of bad actor to reduce the failure.
Provided the Standard operating procedure for the Rotating & Static and static equipment
Accomplished Projects:
(1st Industrial City, Dammam): Ferric Chloride Plant (Basic Chemical Industries), TARA Toothbrush Factory, SAPIN Extension
(2nd Ind. City, Dammam): Saudi Power Transformer Factory, WISCOSA Cable Tray Factory, AFICO Fiberglass Factory, AXENS Catalyst Plant, S&T GULF Factory, Gulf Chemical, Schweitzer Engineering Laboratories, NTS Workshop Facility
(Dammam Port): Al-Qureshi Warehouses Facility, BUREAU VERITAS Laboratories, Al-Suhaimi Warehouse
(3rd Ind. City, Dammam): Saudi Foam Factory
Ongoing Project:
Gulf Cryo Extension Project (2nd Industrial Dammam)
Be’aah Expansion Project (1st Industrial Jubail)
RAVAGO Plastic & Rubber Factory, (2nd Industrial City, Jubail).
INMA Pallet Factory (Jubail Support Industrial Area)