Field Piping Engineer Coordinator


Last Updated: 9th June 2018 (over 4 years ago)

Address
Palermo, Italy

E-mail
Locked

Phone Number
Locked

Qualification Level
Other Post Graduate

Languages
English, French, Italian, Spanish

Summary

Leading and coordinating the site piping team - Performing Constructability Reviews on the project -
Preparing field designs in accordance with project agreements - Implementing
project construction Quality Control requirements including in-process surveillance, inspection and testing
of completed installations to ensure that project quality requirements are being met. - Preparing Reports
to document nonconforming item conditions - Drawings and specification control and interpretation. -
Providing guidance and direction to the document control/management group. - Reviewing piping pressure
test packages - Developping punch lists of incomplete work report - Providing technical direction to construction
supervision - Providing responses to Technical Queries - Preparing field design changes for the project
- Preparing material summary reports - Quantity take-off, control, reporting and forecasting. - Providing input
to the project critical items list as required - Preparing Field Material Requisitions and tracking receipt of
materials as required - Performing Subcontracts coordination - Coaching, mentoring and development of others
within the field supervision team. Responsible for the lay-down area: Logistics Planning & Scheduling
Analysis and cost control Material handling Delivery Sandblasting & Painting Bundling & Labeling

Education

Mario Rutelli's Institute - State Board of Examiners N°173
Certificate of Italian Register of Surveyors (Professional Surveyor)

   Sep 2001
— Jul 2003

Filippo Juvara's Institute
Civil Engineering & Quantity Surveyor

   Sep 1991
— Aug 1996

Experience

SITIE IMPIANTI GULF CONTRACTING Co. W.L.L. Doha, Qatar
Project MEP Lead Engineer

   Jun 2017
— Jun 2018

For the Project Villa Al Gharafa (N°4 Luxury Villas), Owner - Real Family Al Thani, Doha (Qatar):
Responsible for the site engineering and technical advising for the following provisions: Chilled Water System, Water Supply / Plumbing,
Drainage & Rain Water pipes, Irrigation pipes, HVAC
Leading and mentoring the site technical team composed of Mechanical / Electrical Engineers & CAD Drafters
Reviewing and detailing basic engineering made by others
Developing new engineering (Coordination Drawings, Shop Drawings & Installation Details)
Reviewing pipe / duct sizing and water / air flow rates established by others as per IFC
Selecting equipment, instruments, devices and accessories to be procured in accordance with the project requirements
Reviewing quotations and meeting suppliers to ensure the offered items meet the project requirements
Providing procedures and instructions for the installations
Dealing with site modifications
Rising Request For Information (RFI )
Submitting Material Approval (MAP)
Attending coordination and technical meeting
Liaison with Main contractor technical office, consultant and client representative

Cartubi Srl, Trieste, Italy
Project QA-QC Engineer

   Jun 2016
— May 2017

For the OIE Project, client Saipem, surveillance Shell / ConocoPhillips, Trieste (Italy):
Within the Subsea Well Response Project (SWRP) and in cooperation with Oil Spill Response Ltd(OSRL) to procure Offset Installation
Equipment (OIE). This equipment is an industry first and is designed to support subsea well intervention operations in scenarios where
conditions prohibit direct vertical access to a well head.
In the event of a subsea well incident, OIE allows responding personnel to remove or install capping, containment or related equipment
from a safe offset distance from an incident site. The equipment is scheduled to be available for industry use in 2017.
Responding directly to the Project Manager of the Project, dealing with all the quality aspects for Structural, Mechanical & Piping
Disciplines:
Reviewing & Implementing Inspection Test Plan (ITP).
Developing Format for inspection & testing report.
Reviewing project Procedures, Specs and Drawings.
Guiding & Leading Welding Inspectors, QC operators
Reviewing and selecting applicable WPS; developing Welding Maps and mapped As-built
Issuing Request For Inspection, NC Report, Technical Deviation, Technical Query
Conducting inspections in accordance with ITP at each stage of the project (Material procurement, fabrication, installation, testing)
Monitoring & guiding subcontractors for fabrication, NDT, sandblasting, painting, flushing & testing activities.
Developing Test Packages, Welding Books, Final Dossiers
Attending daily, weekly meeting
Liaison with Saipem / Shell / ConocoPhillips representatives

Bonatti - CSM
Lead Field Technical Officer / QA-QC PED

   Jul 2015
— Apr 2016

For the Augusta Project CHPP (Combined Heat and Power Plant) for the client, Sasol (Italy), responsible for all the technical and quality aspects of Pipe Testing Package, developed technical Dossier PED/ATEX for Pipe Line (CAT. II-III) and for Equipments subjected to PED 97/23/CE (Format A-G1) and ATEX 94/9/CE (for CAT. IV) Regulation, and responsible for developing the final Dossier for Pipe Lines CAT. I- Art 3.3.
• Reviewed project documentation, and reviewed / approved overall documentation for Test Package as per PED requirements
• Prepared Circuit List based on the Line List, P&ID and Isometric in accordance with ASME / EN codes
• Calculated blind flanges thickness used in pressure testing, according to ASME – EN – HSE requirements
• Ensured ongoing engagement through heavy involvement, weekly meeting, and reporting to executive management
• Facilitated stakeholder requirements validation and defined clear success metrics with key performance indicators
• Reviewed documentation from vendors and contractors (PCQ, Welding Book, MDR, etc.)
• Generated required formats / certificates and developed procedure for assessing conformity (PED – ATEX)

Gerdau (Brazil)
Field Piping Engineer Coordinator

   Oct 2014
— May 2015

Gerdau Corsa - SMP-HSM - Pachuca_Hidalgo (Mexico) Responsible for the overall piping works of
CCM(Continous Casting Machine) & RM Leading and coordinating the site piping team Leading,
coordinating and monitoring the contractors MCC(Mechanical Completion) Punch List / outstanding Site
Engineering / Inspections / Modifications Quality Control NDT Pre-commissioning Commissioning Weekly
Meeting Site Report

Danieli
Field Piping Engineer Coordinator

   Sep 2010
— Oct 2014

Pocket - SSB - HSM/TSC - Penang (Malaysia) POSCO SS VINA_WTP - RM - HSM - SMP_PHU MY
BRVT (VIETNAM) SSC Steel Plant-DRP-WTP for DRP & SMP - Egypt HADEED New Steel Plant
Long Product Project - Saudi Arabia INTEGRATE STEEL PLANT GHC2–Customer ESI – Emirate Steel
Industries - Abu Dhabi Responsible for the overall piping works on the project for WTP-RM-HSM-MSP
plants: Leading and coordinating the site piping team - Perform Constructability Reviews on the project -
Utilize project automation tools - Prepare field designs in accordance with project agreements - Implement
project construction Quality Control requirements including in-process surveillance, inspection and testing
of completed installations to ensure that project quality requirements are being met. - Prepare Reports
to document nonconforming item conditions - Drawings and specification control and interpretation. -
Providing guidance and direction to the document control/management group. - Review of piping pressure
test packages - Develop punch lists of incomplete work - Provide technical direction to construction
supervision and craft - Provide responses to Technical Queries - Prepare field design changes for the project
- Prepare material summary reports - Quantity take-off, control, reporting and forecasting. - Provide input
to the project critical items list as required - Prepare Field Material Requisitions and tracking receipt of
materials as required - Perform Subcontracts coordination - Coaching, mentoring and development of others
within the field supervision team. Responsible for the lay-down area: Logistics Planning & Scheduling
Analysis and cost control Material handling Delivery Sandblasting & Painting Bundling & Labeling

Demont
Field Piping Engineer / Supervisor

   Dec 2008
— Aug 2010

For the projects ENI(TA) - ISAB(SR) Responsible for the overall piping works on the project:
- Erection - Fabrication - Sandblasting & Painting - Engineering & Modifications - Punch List - Mechanical
completion - Precommissioning - Pressure / Service Test & NDT - Material purchasing

Labco - Berengo
Test Package Coordinator (PED)

   Jul 2008
— Sep 2008

Field Piping Engineer Refinery ENI(PV) Hydrocracking Project - Customer SNAM Progetti Leading
a working team composed by 2 Mechanical Engineers and 2 Welding Inspectors, for carrying out and
collecting all of the documents to be inserted in the Test Packages: marked up P&ID, Iso As-Built, Welding
map, NDT report, Pressure Test report, etc, in respect of the Quality international standards and PED
(Pressure Equipment Directive). Coordinating and monitoring the subcontractor for the execution of the
NDT. Managing the repairs of the welds in case of defects.

Cosmi
Lead Field Technical Officer - civil, structural, mechanical, piping

   Jun 2006
— Jul 2008

Refinery ENI(PV) Isocracking Project - Customer SNAM Progetti Receiving and filing the project
documentation received by Transmittal from the Client in soft and hard copy, including new revisions and
as-built. Leading, supporting and monitoring the subcontractors during the erection and pre-commissioning
stages. Prioritizing and assigning the working areas to the supervisor, according to the scheduled activities
and the availability of the materials (spools, equipments, steel structure, steel profiles, etc.). Cooperating with
the Quality Department for encoding the piping isometrics and welds map for new and revised drawings.
Manage the modifications on field. Liaison with client’s technical office.

Prefabbricati Nord
Technical Officer /Project-Site Manager

   Feb 2002
— Jun 2006

BUILDING INDUSTRY Based on the structural calculation, the drawing up of the shop drawings required
for the manufacture of the lattice girder, steel pillars and pre-stressed concrete modules (BOM, drawings
2/3D, details). Oversee the manpower during the fabrication steps. Adapting the original project to the REP
– PAN solution (Pref. Nord brevet). Technically supporting the erection companies during the installation
stages. Construction Management and supervision on field for turnkey projects, starting from the foundation
and ground level flooring up to the last roof slab. Scheduling erection phases and monitoring/managing the
material provisions. Times and costs analysis. Following some of the developed and accomplished projects:
New Terminal - Fontanarossa Airport, Catania, Italy Mall - Shopping Center " I Portali ", San Giovanni
La Punta,CT, Italy Multi-purpose center for the elderly, Brolo, ME, Italy - Including 3D Modelling Mall -
Shopping Center "Central Park", Melilli, SR, Italy House of Worship, RC, Italy Industrial Building Polisud,
CZ, Italy Industrial Building Edilcoven, SR, Italy Galasin Hotel, Noto, SR, Italy

Engineering and Architectural Offices
Technical Officer / Quantity Surveyor / Site Supervisor

   Jan 1998
— Aug 2002

BUILDING INDUSTRY Field, civil supervisor, civil engineering, structural and civil estimation, bill of
quantity, architectural survey, 2d/3d CAD modeling

Ad
Ad
Ad