Summary

I am a versatile and highly accomplished Electrical Specialist with over 20 years’ experience within all aspects of management and supervision working on major Onshore & Offshore Projects. I also have in excess of 15 years’ experience working in senior level roles on brownfield and greenfield projects, along with an extensive career working for Tier 1 Contractors, EPCM Consultancies and Client Side both in Australia and overseas covering 18 years.

During my career I have worked on numerous multimillion and multibillion projects such as my current position on Ichthys. I have held various titles across many aspects of the project as E&I Superintendent, Electrical Superintendent, Engineer, QA/QC Senior Supervisor and Module Manager. My current scope of works now entails carrying out on the LNG/LPG and Condensate loading and offloading Jetty Project. This involves the Installation, pre-com inspections, commissioning and hand over of all Jetty E/I&T packages. I also have extensive experience working overseas and leading large teams such as overseeing a team in the Philippines of in excess of 100 personnel, including Technicians and Inspector’s.

KEY QUALIFICATIONS
• QA / QC and Safety skills – highly experienced in Hazardous Area installation and inspection.
• Heavy Industrial Maintenance – including Offshore Rigs, Gas Turbines, plant / machinery.
• Implementation of Preventative Maintenance Procedures/ Preservation – for all equipment.
• Planning, design, organising, fault-diagnosis and problem-solving talents.
• Computer literacy and admin proficiency – TQD’s, NCR’s and FAT acceptance reports.
• Excellent communication skills – with management, colleagues and multinational workforces.
• Installation of switchgear (up to 132kV) – also control circuitry, PLC wiring, terminating, MCC’s, etc.
• VFD installation / programming / troubleshooting – ABB, Allen Bradley, Weg, Varcom, Yaskawa, et al.
• Preservation Planning maintaining and implementation
• EEHA / COMPEX Inspection Installation & Maintenance
• BOSIET / HUET Offshore Survival Certificate - 2021
• NGC Competent Person (HV Switchyards)
• Instrumentation Technology Certificate 4
• Working at Heights
• Electrical Engineering Certificate 3
• CCNSG Safety Passport
• LV Rescue and CPR
• UKOOA Medical
• ASIAL Telecommunication Licence
• MSIC Security - Current
• Elec Inst. Eng Diploma

Experience

TECHNIP TSSC
Electrical Preservation and Maintenance Lead

   Aug 2017
— Current

Electrical Preservation & Maintenance Lead: SHELL Prelude FLNG
• Implementation of Preservation Techniques of all E/I&T equipment and packages to ensure minimal impact from time and adverse weather conditions.
• Creation and implementation of E&I schedule for Preservation packages
• Working closely with Commissioning to ensure packages are in the best possible condition for commissioning and hand over.
• Performed routine preventative maintenance on all pre-comm packages and equipment.
• Breakdown maintenance for specific items critical to operations
• Liase with Client on upcoming and current works to identify any defects or issues going forward.

Monadelphous
QAQC Senior E&I Supervisor

   Aug 2016
— Jun 2017

Duties:
• Currently supervise, lead and mentor 12 QA/QC E/I and telecoms personnel while reporting to the QA Co-ordinator and Area Manager on a $400 Million package.
• Work closely with the client and EPC.
• Assist Engineers and management as and when required with TQ’s FTR’s MOC’s etc.
• Perform Inspections and walk down handovers to client.
• Interpret Site Specifications, Prepare TQs and FTR’s for non-compliant installations and progress reports.
• Prepare ITP’s for Electrical Instrument and Telecom Systems.
• Direct the QA/QC activities and lead Inspectors providing guidance on installation & inspections.
• Direct various multi-discipline Sub-Contractors through completion of IR and ITR processes.
• Conduct HAE installation inspections and monitor Quality Control aspects.

Main achievement:
• So far I have achieved a very high level and mutually enjoyable relationship with the client and EPC. I also have created a well-trained and well informed team of Inspectors and Technicians which were highly applauded by both the client and EPC. We had a 100% ITR completion rate and the trust and respect of our beneficiaries.

JKC, JGC/KBR/Chiyoda (EPC)
E&I Superintendent/ Module Manager

   Dec 2014
— Jul 2016

Company: JKC, JGC/KBR/Chiyoda (EPC)
Project: Batangas, Ichthys LNG Project – Philippines Project value: $33 Billion USD
Job title: E&I Superintendent / Module Manager
Date: Dec 2014 - Jul 2016
Project details: Carried out the building and installation of 26 E&I Substations and 2 Staircase Modules for the Ichthys onshore site in Darwin. This also involved the Inspections, Commissioning and hand over to client prior to Sailaway.

Duties:
• Oversaw the construction and fabrication of all Electrical & Instrument installations. This included in excess of 100 personnel from Electrical Technicians, Instrument Technicians, Telecom and Data Technicians, Structural Technicians and QAQC inspectors, EEHA Technicians and painters.
• Worked closely with the client (Inpex) and reported to them and the Field Manager on a $1 Billion package.
• Supervised a workforce of 100 Filipino’s and coordinated SIMOPS with Mechanical & Structural Groups.
• Directed various multi-discipline Sub-Contractors through completion of IR and ITR processes.
• Conducted HAE installation inspections and monitored Quality Control aspects.
• Wrote daily and weekly reports.
• Wrote 3 week look ahead’s and Vendor forecast plans.
• Liaised with the client and upper management of a daily basis.
• Carried out site recruitment, visas for expats, mobilisation/demob plans and also organised accommodation for the initial new starts.

Main achievement:
• Completed all 26 Modules within the timeframe without injury or major incident. The project from a JKC / Inpex perspective was a major success story

SBM Single Buoy Moorings (EPC)
Electrical Superintendent & Engineer Principle Senior Authorised Electrical

   Aug 2013
— Dec 2014

Company: SBM Single Buoy Moorings (EPC)
Project: Ichthys Project – Malaysia, Singapore & South Korea Project value: $39 Billion
Job title: Electrical Superintendent & Engineer Principle Senior Authorised Electrical person (PSEAP) & QAQC Date: Sep 2013 - Dec 2014
Project details: Scope of works was to design, supply, construct, inspect, commission and hand over to client the Multipurpose Swivel Turret for the Ichthys FPSO.

Duties:
• Directly oversaw and instructed the Malaysian, Singaporean and the Filipino workforce, which totalled 12 E&I and EEHA Technicians for SBM and 50 personnel supplied by the Contractor on a $500+ Million package.
• Reported to the Engineering and Construction Managers.
• Alongside the Piping/Mechanical and Telecoms Engineers on a daily basis.
• Liaised daily with the client for writing of OTP’s and inspections (FAT inspections etc.)
• Ensured that the workforce complied with all safety requirements.
• Revised all JHA’s and start cards (Take 5’s) before works commence.
• Carried out Toolboxes and Safety Talks on E&I LOTO to all personnel.
• Led the Commissioning Teams in all phases of Construction, Commissioning and Integration through to Operation.
• Implemented safety procedures and organised Vendors/Package Engineers for commissioning activities.
• Created all commissioning documentation and prepared OTP’s, engineering drawings and documents.
• Notified relevant parties and monitored QA/QC of all aspects of installation and re-works.
• Wrote operational procedures, FAT inspections, QA/QC and detailed reports.
• Created Work Packs for all Packages for Pre-comm, Commissioning and Start up.

Main achievement:
• Full completion and sail away to Korea, on time and on budget

SBM Single Buoy Moorings (EPC)
Electrical Superintendent & Engineer Principle Senior Authorised Electrical

   Aug 2013
— Dec 2014

Company: SBM Single Buoy Moorings (EPC)
Project: Ichthys Project – Malaysia, Singapore & South Korea Project value: $39 Billion
Job title: Electrical Superintendent & Engineer Principle Senior Authorised Electrical person (PSEAP) & QAQC Date: Sep 2013 - Dec 2014
Project details: Scope of works was to design, supply, construct, inspect, commission and hand over to client the Multipurpose Swivel Turret for the Ichthys FPSO.

Duties:
• Directly oversaw and instructed the Malaysian, Singaporean and the Filipino workforce, which totalled 12 E&I and EEHA Technicians for SBM and 50 personnel supplied by the Contractor on a $500+ Million package.
• Reported to the Engineering and Construction Managers.
• Alongside the Piping/Mechanical and Telecoms Engineers on a daily basis.
• Liaised daily with the client for writing of OTP’s and inspections (FAT inspections etc.)
• Ensured that the workforce complied with all safety requirements.
• Revised all JHA’s and start cards (Take 5’s) before works commence.
• Carried out Toolboxes and Safety Talks on E&I LOTO to all personnel.
• Led the Commissioning Teams in all phases of Construction, Commissioning and Integration through to Operation.
• Implemented safety procedures and organised Vendors/Package Engineers for commissioning activities.
• Created all commissioning documentation and prepared OTP’s, engineering drawings and documents.
• Notified relevant parties and monitored QA/QC of all aspects of installation and re-works.
• Wrote operational procedures, FAT inspections, QA/QC and detailed reports.
• Created Work Packs for all Packages for Pre-comm, Commissioning and Start up.

Main achievement:
• Full completion and sail away to Korea, on time and on budget

RAS GAS Petroleum (Client side)
Electrical Commissioning Lead

   Mar 2013
— Sep 2013

Company: RAS-GAS Petroleum (Client side)
Project: Hyundai Heavy Industries Barzan Project - South Korea Project value: $10 Billion
Job title: Electrical Commissioning Lead Date: Mar 2013 - Sept 2013
Project details: Assisted in the final stages of construction, to ensure a smooth handover to the Client for commissioning of all packages and sub-systems for 3 Wellhead Platforms, including one accommodation module. The Barzan Project consisted of 3 wellhead platforms to go offshore Qatar and 1 accommodation module, which was built in the HHI yard in Ulsan Korea and sailed to Qatar.

Duties:
• Lead a team of 25 Filipino E&I Technicians and directed subcontractors (HHI) on a $500 Million package.
• Reported directly to the Project Manager.
• Total team consisted of 5 Managers and 85 workers.
• Ensured commissioning and handover of all systems within budget and in a timely manner.
• Wrote operational procedures, implemented safety procedures, supervised workforce.
• Prioritised major areas for sub-contractors to target.
• Projected look ahead’s and potential road blocks.
• Carried out weekly work directive meetings and daily planning meetings.

Main achievement:
• Project completion on time and under budget no accidents or injuries.

Monadelphous
E&I Senior Construction and QC Supervisor

   Aug 2012
— Mar 2013

Company: Monadelphous
Project: Oil Search LNG Upgrade Project - Papua New Guinea Project value: $19 Billion USD
Job title: E & I Senior Construction & QC Supervisor Date: Aug 2012 - Mar 2013
Project details: Scope of works was to carry out the upgrade of the AGRP Oil plant to an LNG plant and to add additional TEG glycol units. This involved the construction, inspections, commissioning and hand over with minimal disruption to existing operating plant.

Duties:
• Supervised, led and mentored of 7 Expat Supervisors and 20 nationals (PNG) on a $170 Million USD package.
• Worked alongside Senior E&I Supervisors and 8 SMP Supervisors.
• Reported to the Project Manager.
• Acted as the Electrical Interface Leader between Monodelphous and Customers, ensuring adherence to Rules and Regulations.
• Carried out all levels of commissioning - communications between commissioning and maintenance.
• Monitored QA/QC aspects of the installation – electrical & Instrumentation and Hazardous Area equipment.
• Wrote Permits and JHAs / workpacks etc.
• Liaised with the client on a daily basis and during inspections.
• Assisted engineers as and when required carrying out TQ’s FTQs MOC’s etc.
• Wrote daily meetings weekly reports along with Fortnightly planning/ scheduling meetings and Permit to Work meetings.
• Carried out planning and scheduling.

Main achievement:
• Project complete with minimal disruption to existing plant. Also completed safely on time and within budget.

Occidental LLC / Petroleum Development Oman (EPC/Client)
Electrical Supervisor/ Area Lead

   Sep 2008
— Aug 2012

Company: Occidental LLC / Petroleum Development Oman (EPC/Client)
Project: Mukhaizna Oil Facility, Sultanate of Oman Project value: $5 Billion
Job title: Electrical Supervisor/ Area Lead Date: Sep 2008 - Aug 2012
Project details: Installed, commissioned and maintained all Field Operations including 2700 well heads, 5 satellites over 50 Steam Generators and 5 main production plants (World’s largest Steam Flood Operation).

Duties:
• Reported to the Power Lead Manager and production plant operators for SIMOPS. OXY (Occidental) and ONOC (Omani national Oil Company) were joint owners Oxy were the sole operators. Both were considered as the client as OXY owned more than 65% of the fields interest.
• Worked most closely with the Maintenance Department and Team managers.
• Daily site meetings with the Client to plan and discuss problems and rectifications, and improvements.
• Coordination of Electrical and Mechanical crew to program work scopes packages and rectification works.
• Promoted Safety First Ideology and work towards and achieve Zero Harm.
• Ensured all necessary documentation supporting work activities is compiled and made available to the Client. Any sub-contractors brought to site were required to submit documents and plans to myself for SIMOPS and possible problems with production.
• Issued permits for all associated equipment within the field.
• Led the Electrical and Mechanical Maintenance on operational and newly commissioned material and equipment, including Wellheads, VFD’s, Steam Generators, and Coalesces etc.
• Involved in the installation of Hazardous Area Equipment and the implementation of preventative maintenance.
• Instructed nationals in the installation and maintenance of Hazardous Area equipment and trained local labour.

Main achievement:
• As the Electrical Maintenance Supervisor and later the Area Lead, I controlled the day to day Maintenance of the entire field Block 53. This meant I had a team of 25 Inlecs and 25 Mechanical Technicians which safely and without any incidents maintained in good working harmony and the 100% confidence of the company.

Various
Electrician to Electrical Installation and Commissioning Supervisor

   Jan 1996
— Jan 2008

Cameron/Petreco (EPC) D.R. Congo, P.R. China & Singapore
Electrical Installation & Commissioning Supervisor (On & Offshore) 2008 - 2008
Floating Plant Services (Client) - Pipelay Barge 111m Multi-Purpose, Singapore
Electrical Supervisor/Consultant 2007 - 2008
Total Fina - Dorood Production Facility & offshore wellheads - Kharg Island - Iran
Electrical Technician/Supervisor 2005 - 2007
Noble Drilling (EPC) - Semi-Subs, Drilling Platforms, Production Platforms
Rig Electrician 2004 - 2005
Rockson Engineering - 125 MW GE Gas Turbine Project, Omoku, River State - Nigeria Electrical Supervisor 2003 - 2004
Siemens - North Sea & Morecambe Bay Offshore Production, (EPC) Various Platforms Electrical Technician/Rig Electrician 2003 - 2003
Alstom/ABB (EPC) - Aswan High Dam, Egypt
Electrical Technician/Supervisor 2002 - 2003
JRP Control & Automation - Thames Water Sites, UK Nationwide
Electrician/Technician

2001 - 2002

Search Jobs by Industry

Ad
Ad
Ad