Quality Assurance Engineer


Last Updated: 20th October 2017 (over 4 years ago)

Address
Egypt

Category

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
Arabic, English

Summary

I have more than 14 years of work experience, 14 years of them are in the Quality Assurance field with international companies like Smith International and Schlumberger. I am also a certified Lead Auditor, certified Internal Auditor and a Lean Champion.

During my career track, I have built the experience needed to support management through setting up quality assurance tools that will build management confidence in the system and will build customer trust and reliability, that will make the customer happy to do work with the company and is willing to increase the percent of purchasing more services and products.

Education

Sololearn and Self Study
PROGRAMMING AND WEB DEVELOPMENT SKILLS

   Nov 2016
— Feb 2017

 Python 3 tutorial course – 02 Nov 2016 from SoloLearn.
 HTML foundation course – 19 Nov 2016 from SoloLearn.
 CSS foundation course – 25 Nov 2016 from SoloLearn.
 JavaScript Tutorial course – 09 Dec 2016 from SoloLearn.
 PHP tutorial course – 12 Dec 2016 from SoloLearn.
 SQL fundamental course – 16 Dec 2016 SoloLearn.
 Ruby tutorial course – 25 Dec 2016 from SoloLearn.
 Ruby on Rails – personal effort to learn from online courses.

Schlumberger online training
FIELD SPECIALIST preparation Trainings

   Apr 2015
— May 2015

 A Premier of Oil Well Drilling
 Basic Hydraulics
 DTR Field Specialist Basic Fishing Services
 DTR Field Specialist Basic Milling tools
 DTR Field Specialist Basic Well Departure Tools
 DTR Field Specialist Basic Well Abandon Tools
 Introduction to Fishing
 Fishing Operations
 Rotary Drilling Rig Components
 Wire Line Tool String Basic Components
 Packers
 Wire Line Surface Equipment
 Cement Bond Evaluation

Schlumberger Middle East Learning Center in Abu-Dhabi UAE
LEAN LEVEL 3 Lean Champion training

   Apr 2014
— Apr 2014

Management & Industrial Consultancy (MIC)
API-Q1, API SPEC 5CT AND API SPEC 7-1 Awareness

   Oct 2011
— Oct 2011

Germanischer Lloyd (GL)
Lead Auditor ISO 9001:2008

   Oct 2010
— Oct 2010

Germanischer Lloyd (GL)
Internal Auditor ISO 9001:2008

   Jul 2010
— Jul 2010

Moody International and Arab Academy for Science and Technology – Institute of Productivity and Total Quality
Lead Auditor Assessor Certificate (ISO 9000:2000)

   Nov 2002
— Nov 2002

Faculty of Engineering - Alexandria University
Nuclear Engineering

   Sep 1990
— Nov 1996

Experience

Wood International – Alexandria Free Zone & Marsa Matrouh Machineshop
QUALITY MANAGER

   Sep 2015
— Feb 2017

Quality Assurance
 Establishing Quality Management System
 Implementation and maintaining Quality Management System
 Establishing and maintaining Quality System Procedures
 Day to Day and Work Orders processes monitoring and analysis
 Monitoring of Key Performance Indicators
 Preparation of Flow Charts
 As a result of Monitoring and Analysis of Processes, Initiate Actions to achieve planned results and continual improvement.
 Maintaining Quality Document Control
 Processing Customer Satisfaction and Customer Complains
 Control of Non-Conformances
 Maintaining and updating Calibration recall system
 Control of Corrective Actions Cycle
 Control of Preventive Action Cycle
 Preparing and conducting Management Review Meetings
 Indoctrination & Training of workers on Quality Procedures and Raising the Quality Awareness of them.
o Quality Control
 Responsible for Internal Inspection of products
 Follow-up on calibration of API Threading Work Gauges and Instruments
 Follow-up on testing of welding Machines
 Follow-up on Preventive Maintenance scheduling.
o Internal Auditing for:
 Purchasing
 Storage
 Document Control
 Welding Processes
 Machining Processes
 Management Processes
 Production Control
 Validation
 Customer related Processes

Schlumberger Drilling Tools & Remedial Egypt
QUALITY ENGINEER

   Nov 2013
— May 2015

o Schlumberger DTR Quality Assurance management support on drilling (reaming, underreaming, Rhino reamers, directional drilling and side tracking) and fishing product lines and services for locations in Katamya, Cairo and in Marsa Matrouh.
o Implementation and maintaining support for Schlumberger 8 principals of Quality Management System.
o Implementation and maintaining support for Schlumberger Standards of the Quality Management System.
o Creating flowcharts and Swimlanes for the work processes and Quality Standards.
o Creating Organization chart and Responsibility Matrix.
o Lead Auditor for Conducting Compliance Auditing Tool (CAT) on the Standards of the Quality Management System.
o Lean Champion (Lean Level 3) of the locations in Katamya & Marsa Matrouh.
o Studying, preparing and implementation support of Lean projects.
o Reviewing and support for raised Quality Risk Identification Reports (RIRs)
o Review and analysis of Near Misses and Non Conformances, and analysis of the root causes to detect potential non-conformance in the aim of preventing future occurances.
o Participating and support in the investigation of Near Miss and Non-conformance incidents using Systematic Cause Analysis Techniques (SCAT)
o Participating and Support for identification and creating report of Hazard Assessment and Risk Control (HARC), Visual HARCs and Risk Assessment of different activities in the locations.
o Project Readiness Assessment (PRA) Tool support and followup on projects that are major or with critical customers.
o 3rd Party and outsourcing supplier CAT audits.
o Loss Prevention Team (LPT) member participating in efforts to minimize loss through prevention and assessment of risks.
o Field Specialist Trainee on DTR product lines and services, course include:
 A Premier of Oil Well Drilling
 Basic Hydraulics
 DTR Field Specialist Basic Fishing Services
 DTR Field Specialist Basic Milling tools
 DTR Field Specialist Basic Well Departure Tools
 DTR Field Specialist Basic Well Abandon Tools
 Introduction to Fishing
 Fishing Operations
 Rotary Drilling Rig Components
 Wire Line Tool String Basic Components
 Packers
 Wire Line Surface Equipment
 Cement Bond Evaluation

Smith Services – Marsa Matrouh Machineshop
QUALITY ENGINEER

   Jan 2010
— Oct 2013

o Quality Assurance
 Establishing Quality Management System
 Implementation and maintaining Quality Management System
 Establishing and maintaining Quality System Procedures
 Day to Day and Work Orders processes monitoring and analysis
 Monitoring of Key Performance Indicators
 Preparation of Flow Charts
 As a result of Monitoring and Analysis of Processes, Initiate Actions to achieve planned results and continual improvement.
 Maintaining Quality Document Control
 Processing Customer Satisfaction and Customer Complains
 Control of Non-Conformances
 Maintaining and updating Calibration recall system
 Control of Corrective Actions Cycle
 Control of Preventive Action Cycle
 Preparing and conducting Management Review Meetings
 Indoctrination & Training of workers on Quality Procedures and Raising the Quality Awareness of them.
o Quality Control
 Responsible for Internal Inspection of products
 Calibration of API Threading Work Gauges and Instruments
 Testing of welding Machines
 Preventive Maintenance scheduling.
o Internal Auditing for:
 Purchasing
 Storage
 Document Control
 Welding Processes
 Machining Processes
 Management Processes
 Production Control
 Validation
 Customer related Processes
o Establishing, preparing for the API and ISO-9001/2008 Audit, going through the Audit... etc.)

Accurate Elec. Contracting – Egypt
TECHNICAL OFFICE MANAGER

   Sep 2008
— Sep 2009

Electrical & Instruments installation Construction projects tender study, review of tender contracts and specification and electrical construction drawing, determining tender requirements and quantities, tender item pricing, price reference database construction, working with purchasing department for best price of supply for tenders with the specified technical requirements, report for the status of tenders after submital, report the progress of current projects to proposed schedule, working with site managers for the quantitative requirements of the electrical construction of projects during different stages, update of progress of projects. The electrical construction activities include:
 HV/MV/LV power cables
 Cable Routing Installation of cable routing supports
 Installation of Power Generators, Transformers with different kVA, Bus Ducts
 Equipment Installation HT Switch Gears and Breakers, LV Switch Gear (Power Control Cabinets (PCC) and Motor Control Cabinets (MCC)), Local Control Switches, Local control stations with different types (explosion proof, fire proof...etc), junction boxes with different sizes, Miniature Control Centers (MCC), Inverters, Power Factor (PFIC), UPS, Battery Charger, Lighting Panel, Heat Tracing Panel, Fire & Gas Alarm Panels, Inverter…
 Cable routing installation (Trays and Ladders) of different sizes and type.
 Lighting Installation of Galvanized conduits and PVC Conduits & J.B
 Installation of Lighting Fixture with different types (explosion proof, fire proof, chemical proof…etc.), and Lighting poles with different shapes and types.
 Installation of lighting cable
 Installation of earthing systems and grids, earthing rods, pits and strips.
 Steel Structure Installation for equipments and Junction boxes
and instruments.
 Instruments installation of different types like, Pressure Gauges, Transmitters, Switches and Differential Pressure Gauges, Transmitters, Temperature Gauges, Transmitters and Switches, Level Indicators, Transmitter and Switches, PH-meters…etc and piping and tubing for instruments.
 Installation of Control Valves (Pneumatic and electrical) and piping.
Study of Major Electrical constructions Projects like Sidi-Krir Power Plant in Sidi Krir – Alexandria, El-Jawhara Ceramic Factory in El-Sadat City, Alexandria Fiber Company (AFCO) in Amrya – Alexandria, El-Arish Cement Factor – El Arish, Abu-Qir Power Plant.

Wood Int. FZ JV Smith Services Drilco
QUALITY REPRESENTATIVE

   Apr 2001
— Aug 2008

o Quality Assurance
 Establishing Quality Management System
 Implementation and maintaining Quality Management System
 Establishing and maintaining Quality System Procedures
 Day to Day and Work Orders processes monitoring and analysis
 Monitoring of Key Performance Indicators
 Preparation of Flow Charts
 As a result of Monitoring and Analysis of Processes, Initiate Actions to achieve planned results and continual improvement.
 Maintaining Quality Document Control
 Processing Customer Satisfaction and Customer Complains
 Control of Non-Conformances
 Maintaining and updating Calibration recall system
 Control of Corrective Actions Cycle
 Control of Preventive Action Cycle
 Preparing and conducting Management Review Meetings
 Indoctrination & Training of workers on Quality Procedures and Raising the Quality Awareness of them.
o Quality Control
 Responsible for Internal Inspection of products
 Calibration of API Threading Work Gauges and Instruments
 Testing of welding Machines
 Preventive Maintenance scheduling and preparation
o Internal Auditing for:
 Purchasing
 Storage
 Document Control
 Welding Processes
 Machining Processes
 Management Processes
 Production Control
 Validation
 Customer related Processes
o Establishing, preparing for the API and ISO-9002/98 and ISO-9000/2000 Audit, going through the Audit... etc.)

Archirodon Const. Overseas
TECHNICAL OFFICE ENGINEER

   Aug 2000
— Mar 2001

Developing a Database for the final Claim for cost control and as an Instrumentation Engineer (Installation, Calibration, Testing, Commissioning, cabling, loop checking… etc) in MIDTAP's PPCLF project in El Deikhila Seaport.

Industrial Development Co (Devco)
WELDING QA INSP.ENG.

   Oct 1999
— Jul 2000

Full responsibility of one of Alexandria's constructional sites, as a using Ultra-Sonic Testing (UT) and Radiographic Testing (RT).

PC-Link
COMPUTER HARDWARE MAINTENANCE ENG

   Oct 1997
— Oct 1998

A solid rank as a part of the computer hardware Maintenance Department team (Assembling, Software Setup, Software problems solution, Hardware Conflicts, Hardware Maintenance, Internet Installation, Internet Setup, Network installation and Administration and Customer Training World Health Organization-WHO)

Ad
Ad
Ad