Civil construction engineer


Last Updated: 17th September 2017 (over 5 years ago)

Address
Saudi Arabia

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Other Post Graduate

Languages
Arabic, English

Summary

DEAR: SIR.

I HOPE THAT MY C.V. WILL COVER YOUR NEEDS FOR THE AVAILABLE POSITION IN YOUR COMPANY.
My current position & skills are:-
Company Industry: Consultant & construction
Job Role: Senior project manager & technical support.
Project: - Construction & Infrastructure for Housing Project in South Region of KSA with more than one hundred forty Million SAR. (140,000,000).
I'm specialized on construction field & having some skills such as:-
- Designing structure elements.
- Execution of all structural & architectural work activities.
- Coordinating between different networks (firefighting, Hvac. network, architecture elements) .
- Prepares specification and documents in accordance with requirements.
- Establish format and instructions.
- Investigates technical problems and establish procedures and corrective actions to avoid recurrences.
- Responsible for assume design engineering responsibility for major phases of engineering activity.
- Studying the drawings and project and reading contracts and quantities tables and making a limitation for it .
• AutoCAD 2d.
• Sap2000 (static, dainamic).
• Microsoft office.
• Etabs .
• Safe .
• Prokon.

WITH ALL MY BEST WISHES,,,,,,,,,

AMR ABDULMONIEM

Education

FACULTY OF ENGINEERING - HELWAN UNIVERSITY
CIVIL STUDY - GENERAL BRANCH

   Sep 1998
— May 2004

Experience

Ajmi
Senior Project manager

   Oct 2014
— Current

 Company : Ajmi Company.
 Position : Senior Project manager.
 Project budget : 70 Million S.R .
 Client : Ministry of Housing.

• Tasks : 1- COORDINATING THE ACTIVITIES INSIDE THE PROJECT.
• 2- CONTROLLING MATERIALS FLOW DURING PROJECTS.
• 3 – MONITORING &ADJUSTING IN&OUT COME CASH FLOW OF THE PROJECT.
• 4 – ALL THE OFFICIAL LETTERS BETWEEN COMPANY, CONSULTANT &OWNER.
• 5 – ADJUSTING & MONITORING EXECUTION INSIDE THE SITE AS PER CLASSIFICATIONS
• 6 - Comply with corporate policies and regulations especially in regards to workers general safety at work.
• 7 - Execute and track project progress in accordance with the project schedule and report any deviations.
• 8 - Seek approvals on any issues related to contract drawings and/or specifications.
• 9 - Manage submittals: obtain approvals from consultants as well as clients on undecided materials.
• 10 - Issue billing certificates based on progress/execution levels.

The Saudi engineering union ( khateeb & Almi )
Technical office engineer of north boarder area

   May 2012
— Oct 2014

 Company : The Saudi engineering union ( khateeb & Almi ).
 Position : Technical office engineer of north boarder area.
 Project budget of north boarder area : 250 Million S.R .
 Client : Ministry of Interior.

• Tasks :
1- Revision of B.O.Q for projects .
2- Revision of shop drawing for projects.
3 – Revision of invoices (owner -subcontractors).
4 – Studying the co-ordination between deferent activities in projects (Str. - Arch. - Mech. - Ele.).
5 – Making reports for head office about the site of our area .
- Project status: - The project is still running it has some problems because of the contractor (Saudi Oger).

Shabanat consultant office in K.S.A
Civil designer engineer&construction director for batha project.

   Apr 2010
— Apr 2012

 Company : Shabanat consultant office in K.S.A
 Position : Civil designer engineer-construction director for batha project.
 Client : Ministry of Finance, Social affairs ministry & Education ministry.
Project : Designing the following projects:
1 – Design of Social insurance building in Makka.
Description : Consist of 5 floors on 600 m2.
Budget : 15 million S.R .
2 – Design of under Age care house building in Geddah.
Description : Consist of 3 floors on 8000 m2.
Budget : 84 million S.R .
3 – Design of underAge care house building in Hafrelbatten.
Description : Consist of 2 floors on 8000 m2.
Budget : 71 million S.R .
4 – Design of Custom gate buildings in Rokay .
Description : Consist of 45 buildings on variable areas.
Budget : 2 billion S.R .
5 – Designing of Saudi-German institute buildings .
Description : it could be like training center on 30000 m2 to be Institute of the Ministryof Education and industrial buildings includes an indoor playground and work shops and libraries as well as administrative and service buildings and tanks and the station to raise the water
Budget : 200 million S.R .

B – Constructing of custom gate buildings in Batah during same period (April 2010).
Company : Boakr construction co.
 Position : site construction manger .
 Description : Small city on 3000 m2 to be custom gate & living for K.S.A Army & its roads & its utilities.
Budget : 100 million S.R.
• Client : Ministry of Finance.
• Tasks : 1- field construction works (concrete constructions).
2- Supervision finishing works (Blocks works, Painting works
and Insulation works).
3 – Preparing Bill of quantities (BOQ).
4 –constructing a sanitary mesh &feeding mesh.
5 - Supervision 0f electro mechanic works.

- Project status: - Till the end of project till handing over (it was sister company of Shabanat office).

Integrated studies group
site consultant

   Apr 2008
— Apr 2010

2 – A- From April 2008 till April 2010.
 Company : Integrated studies group
 Position : site consultant
 Project budget : 550 Million L.E .
 Client : 6th October University.
• Tasks : 1- field consultant works (concrete constructions).
2- Supervision finishing works (Blocks works, Painting works and Insulation works).
3 - Bill of quantities (BOQ).
4 - Supervision constructing a sanitary mesh &feeding
mesh.
5 - Supervision of electro mechanic works.
6 –coordinator between different types of works.

- Project status: - Till the end of project.

B - From April 2009 till April 2010
 Company : Integrated studies group
 Position : site consultant
 Project budget: 8 Million L.E.
 Client : 6 October University.
Project : Constructing 3 electronic gates for students.
• Tasks : 1- field consultant works (concrete constructions).
2- Supervision finishing works (Blocks works, Painting work and Insulation works).
3 - revision Bill of quantities (BOQ).
4 - Supervision 0f electro mechanic works.
5 – Technical support on structural problems in site.
- Project status: - Till the end of project.

C - From December 2009 till April 2010
 Company : Integrated studies group
 Position : site consultant
 Project budget : 45 Million L.E .
 Client : 6 October University.
Project : Constructing the private universities High Council building.
• Tasks : 1- field consultant works (concrete constructions).
2- Supervision finishing works (Blocks works, Painting works
and Insulation works).
3 - revision Bill of quantities (BOQ).
4 - Supervision constructing a sanitary mesh &feeding mesh.
5 - Supervision 0f electro mechanic works.
6 –coordinator between different types of works.
7 – Technical support on structural problems in site.
8 – Schedule of project with the contractor for estimating the
Project budget.
- Project status: - only 4 month of the project duration this was 2 years.

D - Civil design work :
 Company : Integrated studies group & private
 Position : Civil designer.
Project : Designing the following projects:
1 – Jasmine villa on 6th October city (Dr.fakry villa).
Description : Consist of 3 floors on 105 m2.

2 - Dr. bazz villa on 6th October city.
Description : Consist of 3 floors & basement on 320 m2.
3 – El waffa buildings model.
Description : Consist of 5 floors & basement on 550 m2 for 3 typical
Buildings.

4 – Emerald building in elshrouk city.
Description : Consist of 5 floors on 460 m2 .
5 – Flower building in badrasheen –giza.
Description : Consist of 5 floors on 640 m2 .
6 – 3 buildings for Elnour Company.
Description : Consist of 3 floors on 90 m2 .
7 – Elnaser factory in 6th October city.
Description : Steel structure building on 600 m2 .
8 – Princess mashaal al saod resort in European country.
Description : small village on 40 Acers in European country resort consist
Of:
A- Palace on 1560 m2 of 3 floors.
B- Villa on 332 m2 of one floor.
C- Underground tank capacity 2760 m3 on 552 m2.
D- Swimming pool on 840 m2.
E- 5 km. railings & guard rooms.
F- Facilities buildings (kitchen – stables –servants home).

Construction &design
site engineer& site technical office engineer

   Mar 2005
— Apr 2008

1 - From march2005 till April 2008
 Company : construction &design
 Position : site engineer& site technical office engineer.
 Project budget : 40 Million L.E .
 Client : Egypt buildings investment company .
Project : constructing 51 villas in green hills project in elshikh zaid, 6 October town.
 Tasks : 1 – Shop Drawings (AutoCAD 2d).
2 – Bill of quantities (BOQ).
3 – R.c working.
4 – Finishing till outside sainatry&plaster.
5 – (Blocks works, Painting works and Insulation works).
- Project status: - Till the end of project.

Ad
Ad
Ad