Summary

IRCA Certified QMS Lead Auditor with over 8 years of cross cultural experience in Structural, Architecture and Infrastructure Construction projects across site engineering, tunnel engineering, station & shaft sinking and resource management. Hands on experience in QA/QC, Implementation, Engineering Management, inspection, preparation and scrutiny of quality assurance plan, quality procedure and inspection test plans. Innate strengths in designing and implementing quality control systems and procedures to ensure strict adherence to quality parameters, minimize rejections and achieve highest quality standards.
Core Competencies: Project Management, Quality Management, Quality Assurance, Inspection & Audit, Operations Management, Manpower Management, Data Analysis, Testing, Troubleshooting, Quality Improvement Initiatives, Technical Supervision, Contract Administration, BOQ / BBS Preparation, Quality Reviews, Internal Audits, ITP, Material Submittal, Multicultural.

Education

NATIONAL INSTITUTE OF TECHNOLOGY KARNATAKA, SURATHKAL
Bachelor of Technology in Civil Engineering

   Jun 2005
— May 2009

Experience

PORR Bau GmbH
Tunnel QC Inspector

   Jun 2015
— Current

Doha Metro Green Line Underground (PORR Bau GmbH/SBG/HBK Joint Venture), Doha, Qatar
 Client: Qatar Rail Company; Client Representative: Hill International; Sponsor: PORR Bau GmbH:
 Project Scope: Construction of the green line of Doha Metro. The Green Line contract will link from Musheireb to the Al Rayan Stadium. It will have eight stations and its 16.6km-long twin-bored tunnel will be built at an average of 20 meters, 6 Herrenknecht - EPB-TBM;
 Successfully managed construction of Twin Bore Tunnels of length 16.6 Km in two stretches with Earth Pressure TBM (EPB);
 Instrumentally supervising Grouting, Shotcrete, Tunnel segments, shield cradle, installation of thrust frame for TBM, Cross passage, NATM Tunnel Waterproofing, Defects and crack mapping of tunnel segments, Evacuation shafts (Direct sinking), etc.
 Drove construction and monitoring of cross passage by NATM Method in line from Al Shaqab Station to Qatar National Library Metro station;
 Hold credentials in preparing the launching shaft to launch TBM, Monitoring of face Pressure, Soil Settlement, Ring Building & Primary and Secondary Grouting;
 Managed construction and surveillance of permanent structure such as Head wall, Fixed Cradle according to given alignment, Tunnel Eye Breaking sequence and inspection of repair of cracks and leakages in segments using advanced chemicals;
 Accomplished construction and surveillance of shafts: Shaft 1 & Shaft 2, elliptical diameter of 17.22m long, 8.17m breadth and 39.64 m deep between the cross passage and running tunnels;
 Supervised Guide Wall, Contiguous Pile and its related test like Koden Test, Calliper Logging Test, Deep excavation and Shotcrete, Rock nails, Anchors, waterproofing, installation of drainage pipe, installation of MEP items, CEKA formwork, base slab, external and inner wall linings etc.
 Carried out Head house installation and fit out above each shaft, architectural finishes drainage, external works, and landscaping, etc. Meticulously coordinated and chaired the QA/QC site weekly meetings with the projects subcontractor’s QC personnel.

PRATIBHA INDUSTRIES LIMITED
Engineer - QA/QC

   Dec 2014
— Jun 2015

 Project: Design and construction of tunnel by shield TBM, Tunnel Stations and Ramp by cut and cover method between Motibagh and Lajpat Nagar for Underground works on Mukundpur – Yamuna Vihar Corridor (Line-7) of Delhi MRTS phase-III;
 Client: Delhi Metro Railway Corporation (DMRC);
 Managed construction of Twin Bore Tunnels of length 926 m and ID-5.8m in two stretches with Earth Pressure TBM (EPB) as well as construction and monitoring of cross passage by NATM Method in line from South extension to INA Metro station including waterproofing and PU Grouting;
 Worked as a Site Layout Planner and executed Plant set-up, Muck pits, DG station, stock yard, store and offices, ensuring works follow the approved drawing and specifications pertaining to Quality & safety.

HIGHTEC ENGINEERS AND CONSULTANTS
Assistant Project Engineer

   Feb 2011
— Dec 2014

 Projects:
 Institutional projects under UPPCL (Uttar Pradesh Projects Corporations Limited) consisted of PL SHARMA Hospital, ITI Institutes, Residential quarters, etc.);
 Construction of 4 storey official building for CMO, Meerut, UP;
 Construction of Township for Airport Authority of India, near bypass Meerut;

ERA INFRA ENGINEERING LIMITED
Site Engineer (GET)

   Dec 2009
— Dec 2011

Construction of the Control room of Thermal Power Plant, NTPC, Bhillai, Chattisgarh

Responsibilities:

 Responsible for all the construction activities including plumbing, painting, infrastructure, and architectural finishes.
 Estimating the quantities of materials and man power and fulfilling the demands to maintain the schedule of the bar chart.
 Providing the details of formwork and bar bending schedule (BBS) as per the architectural and structural drawings.
 Communicating with the clients as well as consultants and satisfying their demands as and when required.
 Checking, reviewing and managing the submission of technical/design packages and the work carried out by sub-contractors.
 Gained experience in pilling works, pile caps, building site execution works, and blueprint reading, as well as preparation of maps and plans.