site manager


Last Updated: 3rd September 2019 (over 3 years ago)

Address
Iran, Islamic Republic of

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Farsi

Summary

Resourceful, flexible, innovative, and professional project manager with considerable knowledge of the construction industry. Possessing excellent organizational, planning and time management skills as well as boasting a consistent track record of improving efficiency, maximizing profits whilst minimizing costs. A confident and reliable individual with a commercial approach to solving problems. Able to manage and coordinate all construction activities and ensure that all project deliverables are achieved with regards to safety, quality, programme and cost.
Adaptable and able to get along with work colleagues and clients, now looking to further an already successful career by working for a ambitious & exciting company.

Education

Islamic Azad university/sanandaj
civil engineering

   Aug 2005
— Sep 2010

Civil engineering is a professional engineering discipline that deals with the design, construction, and maintenance of the physical and naturally built environment, including works like roads, bridges, canals, dams, and buildings.

farabi high school
diploma

   Aug 2000
— Aug 2004

Mathematics & Physics diploma

Experience

petro niro saba
head of civil engineering

   Aug 2018
— Current

• Manage all work related to civil projects Construction, oil and gas
• project estimation
• bidding documentation
• project control

petro niro saba
site manager

   Jun 2017
— Jun 2018

• Implementation of fire water and drainage project according to project
schedule
• Management of subcontractors in the field of construction, fire fighting
polyethylene pipes, drainage metal
pipes and machinery
• Full implementation of derivative fire pipelines
• Full implementation metal pipelines in oil tankers and transfer to
separating pools

techinco
construction supervisor/modaberan petrochemical

   Apr 2014
— Mar 2017

• Checking the performance of construction contractors
• Controlling the items implemented in the construction section with
standards
• Inspection of steel and concrete structures
• Check the implementation items with approved maps

varian shargh
site manager/Municipal Market

   Nov 2012
— Aug 2013

steel structure project
• Implementation of steel structures
• Implementation the sandwich panel walls
• Welding Inspection

omran iran group
executive director/kabod val dam

   Dec 2011
— Dec 2012

• Implementation of concrete water structures
• Underground consolidation with road construction machinery
• ImplementationCrest Dam Road
• Implementation of concrete water structures
• Underground consolidation with road construction machinery

Ad
Ad
Ad