Resume for Piping Engineer with 18 years of experience in oil and gas construction


Last Updated: 24th June 2018 (over 4 years ago)

Address
Kuwait

Category

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Hindi

Summary

RESUME

OBJCTIVE
To explore the experience of 18 years in the field of Piping Engineering & construction for Power Generation Project, CCPP Projects ,Oil & Gas, Petrochemical and Refinery Projects.Looking forward to a kind of job which really gives an opportunity to explore the most challenging task of Design Engineering and Construction to the best of my ability and to enhance my knowledge in new areas of engineering design and Execution, commissioning and pre commissioning.

TECHNICAL QUALIFICATION

Diploma in Mechanical Engineering from Government polytechnic Nowgong MP with 61.3% in 2001.
B-Tech in Mechanical Engineering from Rajasthan university rajasthan with 64.3% in
2010 .

SOFTWARE EXPOSURE

3D (PDS)
Micro station V8.0
Auto-Cad
SP3D
SPR,Navisworks
MS Office (Word, Excel, Power point)

PROFESSIONAL EXPERIENCE:

Company:- Sino const
Company :- Kuwait National Petroleum Company (KNPC)
Refinery :- Meena Al-Ahmadi (MAA)
Project : - Clean Fuels Project (CFP)
JGSK Joint Venture (GS E&C)
From : 31 March 2018 To Till Date

Responsibility-:

coordination for the qualification of welders, inspection of site as per isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding.
To execute under ground piping water piping,fire fighting line ,plumbing piping ,drainage piping for power plant and it's hydro testing according to ASME standards.
To execute all utilities piping for the plant and it's hydro testing coordination with vendors and other departments,& welders.
Preparation of pipe line drawing and well experience in reading pipeline drawing and erection of prefabricated spools
Calculating material take off from ISO drawing and documentation.
Identify equipment location as per general arrangement drawing and prepare layout and measurement, Check installed piping components as P&D
Reviewing piping isometric support drawing and details.
Prepare weld mapping of isometric drawing and dimension check of completed spools. Maintain house keeping and proper arrangement of spools in lay down yard.
Supervise activities inclusive of fabrication, Installation of piping and structural installation, hydro testing and commissioning works.
Supervision of the chemical cleaning jobs of different system propane, Amine, Tag etc. coordination with NDT Engineer, installation of piping,
Prepare as built drawing, preparation of mechanical punch list, piping punch list hydro testing, Flange Management and box up activities as per applicable codes, procedure and standards.
material specification, inspection requirements and organizes for stage inspection as required.
To study the vendor manuals for monitoring the materials delivery and ensuring all inspection of material/equipment as per vendor specification.
Managed the proper erection of pipes, hangers, and supports in field installations.
Hydrostatic testing of the pipe spools & hydrotest of system by system, valve and pad.
Reinstatement of the hydrostatic tested lines.
Punch list clearance and pre-commissioning assistance.
Tie in connection for all kind of services.Fabrication, Erection of Piping spools & pipe support.
Preparing look ahead plan and making arrangements to achieve it.
Responsible for technical & engineering support to field supervisors required at site.
Prepare as built isometrics as per site requirement.
Co-ordination with other discipline and attending regular meeting with client.
Maintain co-ordination among the Field Engineers of various work discipline.
Preparation of daily & weekly progress report and submit to the Construction Manager.

Company:-
Samsung Engineering india Pvt. Ltd.Noida
From : 2 July 2014 To 29 April 2018
Designation : Lead Piping Engineer
Project- Guru Govind singh Refinery Expansion Project

Responsibilities: -
To execute overall on Plot Plan, Piping fabrication and erection works include identification of materials.
coordination for the qualification of welders, inspection of site as per isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding.
To execute under ground piping water piping,fire fighting line ,plumbing piping ,drainage piping for power plant and it's hydro testing according to ASME standards.
To execute all utilities piping for the plant and it's hydro testing coordination with vendors and other departments,& welders.
coordination with NDT Engineer, installation of piping, preparation of as built drawing, preparation of mechanical punch list, hydro testing, Flange Management and box up activities as per applicable codes, procedure and standards.
To assist pre commissioning and commissioning activities of piping systems completed include flange joint leak test, air flushing, water flushing, nitrogen purging etc.
To coordinate for the shutdown activities of Off plot and On plot tie in piping works include shut down plan preparation, man power, machinery, shut down materials and equipment estimation, coordination for the Permit To Work procedure with client, coordination for the site preparation etc.
Preparation of construction method statements and procedures like procedures for fabrication of piping, installation and testing of piping and structure’s, installation of equipments etc.
To liaise with engineering team for the completion of approved construction (AFC) drawing and ensure complete transmittal of the same in to site.
To check the Bill of Material (Material Take Off) as per drawing for ensuring requirements are realistically quantified as per scope and budget and follow up the delivery of the project/construction materials.
Preparation of Bill of Material ,MTO preparation with manually and according to P & id MTO preparation.
To liaise with procurement and material management team to ensure the project piping material delivery are in time as per planned schedule to site.
Liaising with engineering (design team) to ensure deliverable like project materials and equipments meet construction requirements.
Identify material specification, inspection requirements and organizes for stage inspection as required.
To study the vendor manuals for monitoring the materials delivery and ensuring all inspection of material/equipment as per vendor specification.
Managed the proper erection of pipes, hangers, and supports in field installations.
Hydrostatic testing of the pipe spools & hydrotest of system by system, valve and pad.
Reinstatement of the hydrostatic tested lines.
Punch list clearance and pre-commissioning assistance.
Tie-in connection for all kind of services.

Designation :Senior Piping Engineer

Project- KNPC KUWAIT
Responsibilities: -

Responsible for Plot Plan,equipment layout & piping layout.
Planning Designing the pipe rack width and elevation.
Studying the Rack Piping and Modeling & final rack piping.
Pump Piping,Reactor piping,Vessel Piping,Column Piping,Ex-Changer Piping
And Heater Piping.
Preparation of GA drawings.
Preparation of Construction ISOs and Destruction ISOs.
Preparation of Bill of Material ,MTO preparation with manually and according to p&id also.
Preparation of TIE-IN and Valve schedules.
Prepare Under ground piping layout oily water,drain philosophy for plant.
Fixing the equipment location and Elevation like Pumps, Reactors, Reformer, Heater, Vessel, Compressor, Ex-changers and Air-cooler.
Supervise the review & approval of piping isometric drawings to ensure compliance with P&ID’s, material selections, ratings of fittings, etc.
Checking of isometrics as per P&ID, PMS & stress requirements and Issue for RFC (Release for construction).
Checking of Piping GAD, Isometrics, BOM & Piping Isometrics.
Designing Special Support Sketches as per Stress requirement.
Provide technical assistance to the site for any issues related to pipe erection, pipe floating, etc.
Checking of Vendor G.A drawings of equipment’s.
Interface with other department like civilmechanical, C&I, electrical,
Prepare nozzle orientation.
Jointly review the 3-D model with the A/E, pipe fabricator and constructor to finalize the field weld locations.
Prepare As build Drawing according to site requirement.
Prepared line list, valve list, Piping GAD, isometrics extraction & Checking of all delivery documents.
Conduct Model review with clients & Internal Model review 30%,60%,90%,100%.
Prepare Clash report & resolve the clash problem.
Conduct Model review with clients & Internal Model.
Supervise the review & approval of pipe spool drawings from the pipe fabricator.
Review & approve the quality documentation from the pipe fabricator.
FEED and Detail firefighting piping system for all equipment’s.

Company:-Doosan Power Systems India Pvt. Ltd.
From : Dec.2006 To July 2011
Designation : Piping Engineer

DoosanPower Systems (India) Pvt. Ltd. is a 100% subsidiary of Doosan Heavy
Industries and Construction Co., Ltd. (South Korea) which is a global company and
undertakes Thermal, Nuclear, Hydro Power and Desalination Plant Projects on EPC basis in Asia, Latin America and in other parts of the world.

.Project- GMR Thermal Power Plant Raipur (685MW)
Designation : Senior Piping Engineer
Job Responsibilities: -
Material Planning & scheduling. Performed the material verification.
Planning and executing of the work so as to achieve theTarget as planned.
Allotting works to efficient contractors.
Preparing the protocols for completion of fabrication work.
Installation of All critical line & Non Critical lines as per isometrics.& prepare As built isometrics as per site condition.
Erection, fabrication and Commissioning of Boiler, storage tanks, piping & valves.
Performed pre-commissioning and commissioning activity and prepare document.
Performed leak test of storage tank in presence of client. And perform hydro, pneumatic test at site.
Punch list clearance and pre-commissioning assistance.
Prepare reports for day to day results and present them in weekly review meetings of both the Company and client.
.
Project- Mundra Thermal Power Plant Gujrat
Designation : Senior Piping Engineer
Job Responsibilities: -
Fabrication, Erection of Piping spools & pipe support.
Preparing look ahead plan and making arrangements to achieve it.
Responsible for technical & engineering support to field supervisors required at site.
Co-ordination with and attending regular meeting with client.
Maintain co-ordination among the Field Engineers of various work discipline.
Preparation of daily & weekly progress report and submit to the Construction Manager.
Test packs construction clearance.
Hydrostatic testing of the pipe spools, valve and pad.
Reinstatement of the hydrostatic tested lines.
Punch list clearance and pre-commissioning assistance.
Tie-in connection for all kind of services.
Supervised the construction, testing and commissioning of the critical lines and BOP area Piping systems.
Monitored the processes and methodologies used in the construction of combined cycle power plant.
Managed the proper erection of pipes, hangers, and supports in field installations
Check and consult spools delivery in site
coordination for the qualification of welders, inspection of site as per
isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding.
Punch list clearance and pre-commissioning assistance
Prepare as built isometrics as per site requirement.

Company- Daewoo Engineering & Construction (Abu Dhabi)
Designation : Piping Engineer interface Coordinator
Project - Ruwais Refinery Expansion Project .
From : July 2011 To Aug 2011
Responsibility:

Fabrication, Erection of Piping spools & pipe support.
look ahead plan and making arrangements to achieve it.
Responsible for technical & engineering support to field supervisors required at site.
Punch list clearance and pre-commissioning assistance
Prepare as built isometrics as per site requirement.
Co-ordination with and attending regular meeting with client.
Maintain co-ordination among the Field Engineers of various work discipline.
Preparation of daily & weekly progress report and submit to the Construction Manager.
Test packs construction clearance.
Hydrostatic testing of the pipe spools, valve and pad.
Punch list clearance and pre-commissioning assistance.
Tie-in connection for all kind of services.
Supervised the construction, testing and commissioning of the critical lines and BOP area Piping systems.

Company:-Doosan Power Systems India Pvt. Ltd.
From : Sep 2011 To 27 June 2014
Designation : Piping Engineer
Job Responsibilities: -
Provide technical assistance to the site for any issues related to pipe erection, pipe floating, etc.
Responsible for plot plan, equipment & piping layout Planning.
Designing the pipe rack width and elevation ,Designing the Batter limit and Platforms.
Studying the Rack piping and finalizing rack piping.
Pump Piping, Reactor piping, Vessel Piping, Column Piping, Ex-changer piping and Heater Piping.
Prepare Tentative BOM of initial stage of project for procurement.
Checking of isometrics as per P&ID, stress requirements and Issue for RFC (Release for construction).
Checking of Piping GAD, Isometrics, BOM.
Designing Special Support Sketches as per Stress requirement.
FEED and Detail firefighting piping system for all equipment’s.
Checking of Vendor G.A drawings of equipment’s.
Segregation of Clash Report and Monitoring Clash resolution status using 3D clash report function
Prepare As build Drawing according to site requirement.
Prepared line list, valve list, Piping GAD, isometrics extraction & Checking of all delivery documents. Conduct Model review with clients & Internal Model.

Barka Combined Cycle Gas Power Plant Oman(660 MW)

Designation :Piping Engineer

Job Responsibilities: -
Responsible for plot plan, equipment & piping layout Planning of the Main Steam, Hot-reheat, Cold reheat system, Planning of Pipe rack area Piping, tank area like oil storage tank area piping service water storage area piping Cooling tower area Piping, piping layout ,reviewed piping systems in Smart Plant Review (SPR), updated 3D model comment review, model clash check, isometric checking, etc. Also responsible for coordinating the team for their activities for piping layout, 3D modelling & deliver team progress to project management.

Dharki Combined cycle Power Plant Pakistan (175 MW)
Designation :Piping Engineer

Job Responsibilities:-
Responsible for Piping GAD Checking,Isometrics Checking,Bill of Material checking,& Checking of all delivery Document Piping Routing of all Critical Lines & Routing of Utility lines in 2D & 3D Responsible for checking of overall plot plan, Equipment layout & piping layout for 30%, 60% client review with isometrics & BOM list as per PMS & layout.

Cirebon thermal Power Plant Indonesia (675 MW)
Designation : Piping Engineer

Job Responsibilities:-
Responsible for Prepare Piping GAD of Power Block area & BOP area & Modelling of utility area Piping Planning in 2D & 3D, Coordinate with other Department updating 3D model comment review, model clash check, isometric checking, etc. Also responsible for coordinating the team for their activities.Review vendor document & Comments & Conduct Model Review with inter department & Client. And solve all query. with piping layout, reviewed piping systems in Smart Plant Review (SPR), updating 3D model comment review.

Company:

B.D.Sharma & Associats Construction Company (New Delhi)

From : Dec. 2001 to Dec. 2006

Designation :Piping engineer

Job Responsibilities: -
Planning & Execution of fire fighting System layout for 2MW To 10MW Site survey & Prepare All Documents for delivery & Coordinate with pump & pipe Vendor
Prepare piping layout, Plot Plan Equipment Layout & All Utility line Planning in 2D Checking of piping GAD .

Personal Details

Date of Birth : 26th March 1977
Nationality : Indian
Gender : Male
Marital Status : Married
Language Known : Hindi & English
Address : C35/36 Nawada New Delhi
Permanent Address : Behind L.I.C office Panna MP Pin-488001
Ph.No.+918510026915
Contact No : 9911735682
Passport No.-N-8400527
Ameesh Pathak
Place : Delhi

Education

Rajasthan University
B-Tech

   Oct 2016
— Jul 2018

Experience

KNPC CMIIC Kuwait
Piping Engineer

   Jun 2018
— Jun 2018

RESUME

Ameesh Pathak C-35/36 NAWADA,
NEW DELHI 110059
Contact +919911735682,8510026915

E-mail: ameesh26@rediffmail.com

OBJCTIVE
To explore the experience of 18 years in the field of Piping Engineering & construction for Power Generation Project, CCPP Projects ,Oil & Gas, Petrochemical and Refinery Projects.Looking forward to a kind of job which really gives an opportunity to explore the most challenging task of Design Engineering and Construction to the best of my ability and to enhance my knowledge in new areas of engineering design and Execution, commissioning and pre commissioning.

TECHNICAL QUALIFICATION

Diploma in Mechanical Engineering from Government polytechnic Nowgong MP with 61.3% in 2001.
B-Tech in Mechanical Engineering from Rajasthan university rajasthan with 64.3% in
2010 .

SOFTWARE EXPOSURE

3D (PDS)
Micro station V8.0
Auto-Cad
SP3D
SPR,Navisworks
MS Office (Word, Excel, Power point)

PROFESSIONAL EXPERIENCE:

Company:- Sino const
Company :- Kuwait National Petroleum Company (KNPC)
Refinery :- Meena Al-Ahmadi (MAA)
Project : - Clean Fuels Project (CFP)
JGSK Joint Venture (GS E&C)
From : 31 March 2018 To Till Date

Responsibility-:

coordination for the qualification of welders, inspection of site as per isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding.
To execute under ground piping water piping,fire fighting line ,plumbing piping ,drainage piping for power plant and it's hydro testing according to ASME standards.
To execute all utilities piping for the plant and it's hydro testing coordination with vendors and other departments,& welders.
Preparation of pipe line drawing and well experience in reading pipeline drawing and erection of prefabricated spools
Calculating material take off from ISO drawing and documentation.
Identify equipment location as per general arrangement drawing and prepare layout and measurement, Check installed piping components as P&D
Reviewing piping isometric support drawing and details.
Prepare weld mapping of isometric drawing and dimension check of completed spools. Maintain house keeping and proper arrangement of spools in lay down yard.
Supervise activities inclusive of fabrication, Installation of piping and structural installation, hydro testing and commissioning works.
Supervision of the chemical cleaning jobs of different system propane, Amine, Tag etc. coordination with NDT Engineer, installation of piping,
Prepare as built drawing, preparation of mechanical punch list, piping punch list hydro testing, Flange Management and box up activities as per applicable codes, procedure and standards.
material specification, inspection requirements and organizes for stage inspection as required.
To study the vendor manuals for monitoring the materials delivery and ensuring all inspection of material/equipment as per vendor specification.
Managed the proper erection of pipes, hangers, and supports in field installations.
Hydrostatic testing of the pipe spools & hydrotest of system by system, valve and pad.
Reinstatement of the hydrostatic tested lines.
Punch list clearance and pre-commissioning assistance.
Tie in connection for all kind of services.Fabrication, Erection of Piping spools & pipe support.
Preparing look ahead plan and making arrangements to achieve it.
Responsible for technical & engineering support to field supervisors required at site.
Prepare as built isometrics as per site requirement.
Co-ordination with other discipline and attending regular meeting with client.
Maintain co-ordination among the Field Engineers of various work discipline.
Preparation of daily & weekly progress report and submit to the Construction Manager.

Company:-
Samsung Engineering india Pvt. Ltd.Noida
From : 2 July 2014 To 29 April 2018
Designation : Lead Piping Engineer
Project- Guru Govind singh Refinery Expansion Project

Responsibilities: -
To execute overall on Plot Plan, Piping fabrication and erection works include identification of materials.
coordination for the qualification of welders, inspection of site as per isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding.
To execute under ground piping water piping,fire fighting line ,plumbing piping ,drainage piping for power plant and it's hydro testing according to ASME standards.
To execute all utilities piping for the plant and it's hydro testing coordination with vendors and other departments,& welders.
coordination with NDT Engineer, installation of piping, preparation of as built drawing, preparation of mechanical punch list, hydro testing, Flange Management and box up activities as per applicable codes, procedure and standards.
To assist pre commissioning and commissioning activities of piping systems completed include flange joint leak test, air flushing, water flushing, nitrogen purging etc.
To coordinate for the shutdown activities of Off plot and On plot tie in piping works include shut down plan preparation, man power, machinery, shut down materials and equipment estimation, coordination for the Permit To Work procedure with client, coordination for the site preparation etc.
Preparation of construction method statements and procedures like procedures for fabrication of piping, installation and testing of piping and structure’s, installation of equipments etc.
To liaise with engineering team for the completion of approved construction (AFC) drawing and ensure complete transmittal of the same in to site.
To check the Bill of Material (Material Take Off) as per drawing for ensuring requirements are realistically quantified as per scope and budget and follow up the delivery of the project/construction materials.
Preparation of Bill of Material ,MTO preparation with manually and according to P & id MTO preparation.
To liaise with procurement and material management team to ensure the project piping material delivery are in time as per planned schedule to site.
Liaising with engineering (design team) to ensure deliverable like project materials and equipments meet construction requirements.
Identify material specification, inspection requirements and organizes for stage inspection as required.
To study the vendor manuals for monitoring the materials delivery and ensuring all inspection of material/equipment as per vendor specification.
Managed the proper erection of pipes, hangers, and supports in field installations.
Hydrostatic testing of the pipe spools & hydrotest of system by system, valve and pad.
Reinstatement of the hydrostatic tested lines.
Punch list clearance and pre-commissioning assistance.
Tie-in connection for all kind of services.

Designation :Senior Piping Engineer

Project- KNPC KUWAIT
Responsibilities: -

Responsible for Plot Plan,equipment layout & piping layout.
Planning Designing the pipe rack width and elevation.
Studying the Rack Piping and Modeling & final rack piping.
Pump Piping,Reactor piping,Vessel Piping,Column Piping,Ex-Changer Piping
And Heater Piping.
Preparation of GA drawings.
Preparation of Construction ISOs and Destruction ISOs.
Preparation of Bill of Material ,MTO preparation with manually and according to p&id also.
Preparation of TIE-IN and Valve schedules.
Prepare Under ground piping layout oily water,drain philosophy for plant.
Fixing the equipment location and Elevation like Pumps, Reactors, Reformer, Heater, Vessel, Compressor, Ex-changers and Air-cooler.
Supervise the review & approval of piping isometric drawings to ensure compliance with P&ID’s, material selections, ratings of fittings, etc.
Checking of isometrics as per P&ID, PMS & stress requirements and Issue for RFC (Release for construction).
Checking of Piping GAD, Isometrics, BOM & Piping Isometrics.
Designing Special Support Sketches as per Stress requirement.
Provide technical assistance to the site for any issues related to pipe erection, pipe floating, etc.
Checking of Vendor G.A drawings of equipment’s.
Interface with other department like civilmechanical, C&I, electrical,
Prepare nozzle orientation.
Jointly review the 3-D model with the A/E, pipe fabricator and constructor to finalize the field weld locations.
Prepare As build Drawing according to site requirement.
Prepared line list, valve list, Piping GAD, isometrics extraction & Checking of all delivery documents.
Conduct Model review with clients & Internal Model review 30%,60%,90%,100%.
Prepare Clash report & resolve the clash problem.
Conduct Model review with clients & Internal Model.
Supervise the review & approval of pipe spool drawings from the pipe fabricator.
Review & approve the quality documentation from the pipe fabricator.
FEED and Detail firefighting piping system for all equipment’s.

Company:-Doosan Power Systems India Pvt. Ltd.
From : Dec.2006 To July 2011
Designation : Piping Engineer

DoosanPower Systems (India) Pvt. Ltd. is a 100% subsidiary of Doosan Heavy
Industries and Construction Co., Ltd. (South Korea) which is a global company and
undertakes Thermal, Nuclear, Hydro Power and Desalination Plant Projects on EPC basis in Asia, Latin America and in other parts of the world.

.Project- GMR Thermal Power Plant Raipur (685MW)
Designation : Senior Piping Engineer
Job Responsibilities: -
Material Planning & scheduling. Performed the material verification.
Planning and executing of the work so as to achieve theTarget as planned.
Allotting works to efficient contractors.
Preparing the protocols for completion of fabrication work.
Installation of All critical line & Non Critical lines as per isometrics.& prepare As built isometrics as per site condition.
Erection, fabrication and Commissioning of Boiler, storage tanks, piping & valves.
Performed pre-commissioning and commissioning activity and prepare document.
Performed leak test of storage tank in presence of client. And perform hydro, pneumatic test at site.
Punch list clearance and pre-commissioning assistance.
Prepare reports for day to day results and present them in weekly review meetings of both the Company and client.
.
Project- Mundra Thermal Power Plant Gujrat
Designation : Senior Piping Engineer
Job Responsibilities: -
Fabrication, Erection of Piping spools & pipe support.
Preparing look ahead plan and making arrangements to achieve it.
Responsible for technical & engineering support to field supervisors required at site.
Co-ordination with and attending regular meeting with client.
Maintain co-ordination among the Field Engineers of various work discipline.
Preparation of daily & weekly progress report and submit to the Construction Manager.
Test packs construction clearance.
Hydrostatic testing of the pipe spools, valve and pad.
Reinstatement of the hydrostatic tested lines.
Punch list clearance and pre-commissioning assistance.
Tie-in connection for all kind of services.
Supervised the construction, testing and commissioning of the critical lines and BOP area Piping systems.
Monitored the processes and methodologies used in the construction of combined cycle power plant.
Managed the proper erection of pipes, hangers, and supports in field installations
Check and consult spools delivery in site
coordination for the qualification of welders, inspection of site as per
isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding.
Punch list clearance and pre-commissioning assistance
Prepare as built isometrics as per site requirement.

Company- Daewoo Engineering & Construction (Abu Dhabi)
Designation : Piping Engineer interface Coordinator
Project - Ruwais Refinery Expansion Project .
From : July 2011 To Aug 2011
Responsibility:

Fabrication, Erection of Piping spools & pipe support.
look ahead plan and making arrangements to achieve it.
Responsible for technical & engineering support to field supervisors required at site.
Punch list clearance and pre-commissioning assistance
Prepare as built isometrics as per site requirement.
Co-ordination with and attending regular meeting with client.
Maintain co-ordination among the Field Engineers of various work discipline.
Preparation of daily & weekly progress report and submit to the Construction Manager.
Test packs construction clearance.
Hydrostatic testing of the pipe spools, valve and pad.
Punch list clearance and pre-commissioning assistance.
Tie-in connection for all kind of services.
Supervised the construction, testing and commissioning of the critical lines and BOP area Piping systems.

Company:-Doosan Power Systems India Pvt. Ltd.
From : Sep 2011 To 27 June 2014
Designation : Piping Engineer
Job Responsibilities: -
Provide technical assistance to the site for any issues related to pipe erection, pipe floating, etc.
Responsible for plot plan, equipment & piping layout Planning.
Designing the pipe rack width and elevation ,Designing the Batter limit and Platforms.
Studying the Rack piping and finalizing rack piping.
Pump Piping, Reactor piping, Vessel Piping, Column Piping, Ex-changer piping and Heater Piping.
Prepare Tentative BOM of initial stage of project for procurement.
Checking of isometrics as per P&ID, stress requirements and Issue for RFC (Release for construction).
Checking of Piping GAD, Isometrics, BOM.
Designing Special Support Sketches as per Stress requirement.
FEED and Detail firefighting piping system for all equipment’s.
Checking of Vendor G.A drawings of equipment’s.
Segregation of Clash Report and Monitoring Clash resolution status using 3D clash report function
Prepare As build Drawing according to site requirement.
Prepared line list, valve list, Piping GAD, isometrics extraction & Checking of all delivery documents. Conduct Model review with clients & Internal Model.

Barka Combined Cycle Gas Power Plant Oman(660 MW)

Designation :Piping Engineer

Job Responsibilities: -
Responsible for plot plan, equipment & piping layout Planning of the Main Steam, Hot-reheat, Cold reheat system, Planning of Pipe rack area Piping, tank area like oil storage tank area piping service water storage area piping Cooling tower area Piping, piping layout ,reviewed piping systems in Smart Plant Review (SPR), updated 3D model comment review, model clash check, isometric checking, etc. Also responsible for coordinating the team for their activities for piping layout, 3D modelling & deliver team progress to project management.

Dharki Combined cycle Power Plant Pakistan (175 MW)
Designation :Piping Engineer

Job Responsibilities:-
Responsible for Piping GAD Checking,Isometrics Checking,Bill of Material checking,& Checking of all delivery Document Piping Routing of all Critical Lines & Routing of Utility lines in 2D & 3D Responsible for checking of overall plot plan, Equipment layout & piping layout for 30%, 60% client review with isometrics & BOM list as per PMS & layout.

Cirebon thermal Power Plant Indonesia (675 MW)
Designation : Piping Engineer

Job Responsibilities:-
Responsible for Prepare Piping GAD of Power Block area & BOP area & Modelling of utility area Piping Planning in 2D & 3D, Coordinate with other Department updating 3D model comment review, model clash check, isometric checking, etc. Also responsible for coordinating the team for their activities.Review vendor document & Comments & Conduct Model Review with inter department & Client. And solve all query. with piping layout, reviewed piping systems in Smart Plant Review (SPR), updating 3D model comment review.

Company:

B.D.Sharma & Associats Construction Company (New Delhi)

From : Dec. 2001 to Dec. 2006

Designation :Piping engineer

Job Responsibilities: -
Planning & Execution of fire fighting System layout for 2MW To 10MW Site survey & Prepare All Documents for delivery & Coordinate with pump & pipe Vendor
Prepare piping layout, Plot Plan Equipment Layout & All Utility line Planning in 2D Checking of piping GAD .

Personal Details

Date of Birth : 26th March 1977
Nationality : Indian
Gender : Male
Marital Status : Married
Language Known : Hindi & English
Address : C35/36 Nawada New Delhi
Permanent Address : Behind L.I.C office Panna MP Pin-488001
Ph.No.+918510026915
Contact No : 9911735682
Passport No.-N-8400527
Ameesh Pathak
Place : Delhi

Search Jobs by Industry

Ad
Ad
Ad