Senoir Electrical Engineer


Last Updated: 14th February 2018 (over 4 years ago)

Address
Doha, Qatar

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Other Post Graduate

Languages
Arabic, English, Swedish

Summary

Senior Electrical Engineer with more than 20 years in the field of Electrical Power Engineering; Managing, Supervising and Designing Large-Scale Infrastructure, Industrial, Commercial and Residential Projects.

Education

Project Management Institute (PMI) – Arabian Gulf Chapter (PMI-AGC), QATAR.
Project Management Professional (PMP) Certification Exam Preparation Seminar

   Feb 2011
— Mar 2011

Project Management Professional (PMP) Certification Exam Preparation Seminar.

R.E.P. Program #C057-011201

Experience

WSP|PARSONS BRINCKERHOFF
Senior Utilities Engineer / Utilities Interface Engineer

   Feb 2015
— Current

As a consequence of the population and economic growth in the State of Qatar more highways and associated infrastructure works are required, Public Work Authority (PWA), known also as ASHGHAL, intends to deliver the Local Roads and Drainage associated infrastructure within a coordinated framework of outsourced contracts over five to seven years with $20.0 Billion US Dollars budget.

PWA therefore appointed Parsons Brinckerhoff as the Programme Management Consultant (PMC) to undertake all the management activities associates with the delivery of the Local Roads and Drainage Programme (LR&DP).

Parsons Brinckerhoff has the overall responsibility for the successful delivery of the Programme to Cost, Time and the required Quality. These responsibilities will include the following:
a) The management and coordination of all interfaces with the PWA and its stakeholders;
b) The management and coordination of the PWA supply chain which includes:
(i) Five area based General Engineering Consultants (GEC) to cover Qatar North, Qatar South, Doha North, Doha South and Doha West; and
(ii) The various construction contractors appointed to deliver the physical infrastructure.
c) The development, with PWA, of a logistic and supply strategy.

Stakeholders are KahraMaa (Water & Electricity), QAF, CRA (Ooredoo, Vodafone & QNBN), PWA (TSE, SW, FS, Street Lighting, ITS, etc.), Qatar Gas, WOQOD, Qatar Cool, QP, MoI (DSSS), MUWASALAT, MME, UGN, etc.

Responsibilities:

As the Utilities Interface Engineer, my role is:
Managing the work from WSP│PARSONS BRINCKERHOFF Office at PWA Main Office.
Develop the relation between PWA/PMC and KahraMaa.
Communicate with both Planning and Construction departments at KahraMaa, and/or other Utilities Stakeholders, to make PWA’s GECs/Contractors comply with KahraMaa, and/or other Utilities Stakeholders requirements and standards but in the same time maintaining PWA interests.
Review GEC’s utilities submittals and raising technical and constructible discussions related to complying with the requirements and guidelines of all Stakeholders; the idea is to provide best design, easy to be constructed at site, and is not costly to the Client.
Managing Weekly Coordination and Technical Meetings with KahraMaa to discuss all technical concerns raised by PWA, PMC and GECs.
Prepare Workshops for PWA, PMC and GECs to update them with latest requirements by KahraMaa and other Stakeholders.
Prepare Reports for the high management indicating the status of approvals of electrical and utilities submittals; also, prepare Letters and responses related to electrical and utilities issues.

Stanley Consultants Inc.
Senior Electrical Engineer

   Oct 2008
— Current

# Managing the work from Stanley Principle Office and at Site.
# Managing number of Electrical Engineers and Supervisors.
# Reviewing and approving Material Submittals, Design Drawings, Shop Drawings, As-Built Drawings, Design Calculations, etc.
# Reviewing and approving Inspection and Test Plans, Factory Acceptance Test Procedures, Factory Test Reports, Site Acceptance Test Procedures, Site Test Reports, Installation Method Statements, etc.
# Issuing Site Observation Reports (SOR) and Non-Conformance Reports (NCR) for noncompliant works.
# Managing technical meetings with the Client, Project Management Consultant, Main Contractors, Subcontractors, Manufacturers, Suppliers, etc.
# Inspecting related Electrical Works at Site to assure that it comply with Contract Requirements, KahraMaa Regulations, Qatar Construction Standards (QCS) and International Standards.
# Raising Electrical Safety concerns at Site to HSE Manager.
# Witnessing Factory Tests at Manufacturers Factories.
# Reviewing and approving Testing and Commissioning procedures.
# Witnessing all Electrical tests for Testing and Commissioning activities at Site.
# Reviewing and approving Operation and Testing Plans.

The Electrical works include Cablings (MV/LV, Control, FO), Motor Control Centres, Automatic Harmonic Filters, Power Factor Corrections, Distribution Boards, Control Panels, Variable Speed Drives, Soft Starters, Uninterruptible Power Supply Systems, Underground Utilities, Street Lighting, Lighting and Small Power, Fire Alarm Systems, Telecommunications Networks, Earth Protection Systems, Lightning Protection Systems, Control Systems, and Security Systems.

Al-Barih Construction Co. / Arab Investors Alliance Ltd.
Senior Electrical Engineer – Head of Electrical Engineering Dept.

   Dec 2004
— Oct 2008

# Managing the electrical work from Company main office located at Amman/Jordan.
# Managing number of Electrical Engineers and Supervisors at main office and at Sites.
# Preparing Material Submittals, Design Drawings, Shop Drawings, As-Built Drawings, Design Calculations, etc.
# Reviewing and approving Material Submittals, Design Drawings, Shop Drawings, As-Built Drawings, Design Calculations, etc. that are prepared by Subcontractors.
# Preparing Inspection and Test Plans, Factory Acceptance Test Procedures, Factory Test Reports, Site Acceptance Test Procedures, Site Test Reports, Installation Method Statements, etc.
# Managing technical meetings with the Client, Project Management Consultant, Subcontractors, Manufacturers, Suppliers, etc.
# Managing related Electrical Works at Site to assure that it comply with Contract Requirements, Design Drawings, National Standards and International Standards.
# Witnessing Factory Tests at Manufacturers Factories.
# Preparing Testing and Commissioning procedures.
# Reviewing Testing and Commissioning procedures that are prepared by Subcontractors.
# Preparing Operation and Maintenance Manuals for all Electrical Equipment under Contracts.

The Electrical works include Cablings (MV/LV, Control, FO), Motor Control Centres, Automatic Harmonic Filters, Power Factor Corrections, Distribution Boards, Control Panels, Variable Speed Drives, Soft Starters, Uninterruptible Power Supply Systems, Underground Utilities, Street Lighting, Lighting and Small Power, Fire Alarm Systems, Telecommunications Networks, Earth Protection Systems, Lightning Protection Systems, Control Systems, and Security Systems.

SKÅNE AKTIV KYL.
Electrical Engineer

   Jun 2002
— Nov 2004

Manufacturing, Installation and Maintenance of HVAC Systems.

ELETTA AUTOMATION AB.
Electrical Engineer

   May 2000
— May 2002

Building Distribution and Control Panels for Industrials, Commercials and Residential Projects.

Arrasheed House of Architectures and Al-Rasheed Industrial Engineering.
Electrical Engineer

   Dec 1991
— Apr 1997

Worked in different Projects for both, Private and Public Sectors of Residential, Commercial and Industrial Projects. I had different roles from maintaining Diesel Generators, LV Distribution and Control Panels, to Electrical Installations and designing LV Distribution and Control Systems for Residential, Commercial and Industrial Projects.

Army Corps of Engineers.
Electrical Engineer

   Jan 1988
— Jan 1991

Worked in the Army Corps of Engineers as a junior Electrical Engineer, involved in maintenance of Diesel Generators and LV Distribution and Control Panels.