Construction, Commissioning, Piping, EPC


Last Updated: 15th October 2019 (over 3 years ago)

Address
South Africa

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Trade Qualification

Languages
Afrikaan, English

Summary

I am a Trade Tested Boilermaker, with over 11 years’ experience working as a Piping / Boiler Superintendent. I have extensive knowledge working on power stations within South Africa. My most recent position held – is to represent Mitsubishi Hitachi on Kusile Power Station in the commissioning dept. Overall I am a well-balanced Superintendent with a great skill in driving and leading a team to deliver the work with high quality and within safety standards.
I am a Dynamic Thinker; I am a confident and independent individual. I always welcome any new challenge, I am a born leader, I am competent, energetic and responsible minded. I am stable person and an excellent planner.
I am currently in the market for employment.
I am looking for a position whereby I will be able to utilize my skills and knowledge gained thus far to enhance the quality of work of my employer
Enclosed herewith is my CV for your viewing.

Education


Boiler Maker Plater

   Apr 2015
— Apr 2016

Nosa
Safety Officer

   Dec 2008
— Dec 2008

Samtrac - Safety management system

Experience

Mitsubishi Hitachi Power Systems
Mechanical Commissioning Engineer

   Oct 2018
— Sep 2019

• Commissioning of Boiler systems
• Commissioning of combustion system
• Boiler chemical clean
• Boiler first fire
• Boiler steam blows
• Liaison with construction department on completion of systems
• Confirmation inspections on construction work complete
• Vessel closure inspection with all relevant persons
• Mechanical Isolations for Permit to Work System
• Running plant inspections
• Boiler operator shift support

Thabile Engineering
Construction Field Superintendent

   Sep 2017
— Current

Construction Management:
Provide supervision, direction and monitoring of the performance of the installation and erection by Kusile Project Contractors
Direct and coordinate the daily activities of their assigned construction area using project schedules as the basis for planning
Ensure execution of construction is in accordance to project specification and drawings
Coordinate with and/or between construction contractors
Provide input to project coordination meeting and schedules
Ensure appropriate construction equipment coordination
Enforce Safety and adherence to Quality requirements, construction execution management and milestone tracking

ATPE (Tata)
Field Piping Supervisor (Coordinator)

   Mar 2016
— Apr 2017

Prior to the Contractors Declaration of Construction Completion the Construction Turn Over Coordinator works closely with the Construction Manager to monitor and confirm the last 5% of the contractors activities and to aid both parties with the necessary preparations before the commissioning of plant is initiated.
The Construction Turn-over Coordinator access plant readiness by:
Confirm and review the signed-off Contractor's Application for Eskom's Inspection of the works I part of the works form and associated documentation such as P&ID's, single line drawings, latest approved design, operating and control philosophy, QCP's, ITP's and construction completion check sheets, applicable alignment checks, cable numbers, cable insulation tests, motor dryness tests, torque checks, calibration certificates, FAT & SAT, data book completion and AlA release certificates, KKS Configuration & Labelling Inspections.
Ensure that all related documentation and certificates are completed and filed in the Hand Over File;
Contractors Application for inspection of the works
Final Inspection Certificate
KKS Configuration inspection and Certificate
Construction Completion checklist
Construction Completion Certificates

Confirm Pre Commissioning Design Review readiness (PCR).
Confirm that all the construction completion requirements have been satisfied.

Eduardo Construction
Boiler Maker and Piping Supervisor

   Oct 2011
— Mar 2016

Risk Assessments Method Statements Managing of different levels within the area First Line Inspection Done Ensuring Target Dates are met Ensuring the Quality of the job is up to Standard Updating of QIP’s and program Controlling of consumables used in my area, Structure personnel to get the work done as quick and safely as possible Dealing with staff issues and problems Staff motivation
Worked closely with the AIA
Responsible for controlling the consumable usages in my area
Wrote cutting instruction on the clients behalf where repair work need to be carried out
Worked closely with QC with the setup of ITP's / QCP's

Babcock
Boiler Maker and Piping Supervisor and Safety Officer

   Jul 2008
— Sep 2011

Responsible for PTW system required by Eskom
Risk Assessments Reviewing of method Statements Site Inspections Maintaining of Site Safety Files Training given of certain safety aspects PPE Training Induction Training Planned Job Observations Incident Investigation Safety awareness campaign Chairing SHE Monthly Meeting Enforcing Company Safety Rules and Regulations Safety Plant Walk Downs Enforcing Safety Policies & Procedures Inspection on PEE Inspection Rigging Equipment Implementing the STA – Safety Task Assignment Assisting with the drawing up of method statements PPE Training MSDS Training Inspection on barricading and safety signs displayed on site Drafting of site plot plan and emergency evacuation route Giving Safety Advise to the workforce on doing the job in the safety manner

Search Jobs by Industry

Ad
Ad
Ad