HVAC ENGINEER


Last Updated: 2nd February 2018 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Hindi

Summary

Working under SIEMENS in the world's busiest airport ( Chhatrapati shivaji international airport, Mumbai, India) as an HVAC engineer and achievement includes,

o Reduced energy consumption with respect to previous years by reducing the SASP and other activities without affecting the quality of the service. (saved 521439 units in 2016 and 939626 units in 2017 by manual scheduling).
o Tracked and resolved the duct leakage and blockage issues.
o Changed the temperature set point logic to reduce the load on chiller.
o Using CMMS which helps maintain all data in a single place.
o Planning, scheduling and carrying out of PM activities.
o Identification of vacant rooms and closing its VAV to save energy.
o Installation and Troubleshooting problems of VFD.
o Prepared snag list of all missing data and getting them fixed.
o Installed new VAV and getting it commissioned as per customer needs.
o Mechanically checking the FLB actuators and repairing them.
o PID tuning checking.
o CO2 logic and FAS testing.

Education

University of Mumbai
Instrumentation engineering

   Mar 2011
— Mar 2015

Experience

Siemens
HVAC engineer

   Aug 2017
— Current

Working under SIEMENS in the world's busiest airport ( Chhatrapati shivaji international airport, Mumbai, India) as an HVAC engineer and achievement includes,

o Reduced energy consumption with respect to previous years by reducing the SASP and other activities without affecting the quality of the service. (saved 521439 units in 2016 and 939626 units in 2017 by manual scheduling).
o Tracked and resolved the duct leakage and blockage issues.
o Changed the temperature set point logic to reduce the load on chiller.
o Using CMMS which helps maintain all data in a single place.
o Planning, scheduling and carrying out of PM activities.
o Identification of vacant rooms and closing its VAV to save energy.
o Installation and Troubleshooting problems of VFD.
o Prepared snag list of all missing data and getting them fixed.
o Installed new VAV and getting it commissioned as per customer needs.
o Mechanically checking the FLB actuators and repairing them.
o PID tuning checking.
o CO2 logic and FAS testing.

GBS Associates (Siemens)
HVAC engineer

   Sep 2015
— Aug 2017

Working under SIEMENS in the world's busiest airport ( Chhatrapati shivaji international airport, Mumbai, India) as an HVAC engineer and achievement includes,

o Energy reduction plans
o Tracked and resolved the duct leakage and blockage issues.
o Changed the temperature set point logic to reduce the load on chiller.
o Using CMMS which helps maintain all data in a single place.
o Planning, scheduling and carrying out of PM activities.
o Identification of vacant rooms and closing its VAV to save energy.
o Installation and Troubleshooting problems of VFD.
o Prepared snag list of all missing data and getting them fixed.
o Installed new VAV and getting it commissioned as per customer needs.
o Mechanically checking the FLB actuators and repairing them.
o PID tuning checking.
o CO2 logic and FAS testing.

Search Jobs by Industry

Ad
Ad
Ad