Summary
I am Akhil.K.Anto,Engineer Australia approved Electrical Project Engineer who is particularly interested in the position, which relates strongly to my 11 years of experience in Installation & Commissioning of Electrical Substation,MEP and Industrial Projects.As Electrical Engineer with Drake and Scull International,Oman, I believe I meet all the essential criteria of the position.A keen communicator with honed interpersonal, problem solving and analytical abilities.I am now looking to take up roles in Installation & Commissioning, Project Management with reputed companies preferably in Electrical Projects. Of particular interest to me would be positions in Installation, Commissioning, Maintenance & Operations of Projects. I am open to assignments across Gulf countries.I completed by B.Tech in 2006 from Mahatama Gandhi University, Kottayam .During my studies ,I undergo industrial training at Binani Zinc Ltd Alwaye and done project on Transformers using SCADA in TELK.
Education
Mahatama Gandhi University
B Tech in Electrical & Electronics
Done B.Tech. in Electrical & Electronics from Mahatama Gandhi University, Kottayam, Kerala in 2006.
Experience
Drake & Scull International LLC
Electrical Project Engineer
Looking after the installation and execution works includes RMU’s,Transformers,AV system,Central Battery system,Security system,IT system, BMS system,Lighting and Power system. Also, need to raise inspection for the executed works and have to Co-ordinate with system suppliers for proper execution. Designing works related to drawings need to be done and need raise LPO’s in ERP system. My job also includes preparation of Planning & implementing the preventive & breakdown maintenance schedules,Conducting failure investigation analysis to identify gaps & take corrective measures so as to reduce equipment downtime & maximise plant availability,Monitoring and optimising processes, troubleshooting problems in coordination with other departments and improving efficiency,Overseeing the projects with respect to Cost, Resource Deployment, Time Over-Runs and Quality Compliance and evaluating project progress & taking adequate corrective actions.
Powerline Solutions
Electrical Engineer
Looking after the installation of Surge Arrestors, Circuit Switchers, Disconnector switches and Breakers of GIS substation and installation of Capacitor Banks, Power and Auxiliary Transformers, 13.8 KV Switchgear Panels, CTs & PTs, HT & LT Panels and their Terminations and SAS system via GPS . Accountable for the overall earthing of substation.
Sterling Electro Enterprises
Electrical Project In charge
Oversaw the installation & commissioning of EPABX & its accessories and items including lighting accessories in the trunking methods, internet system and public address system,Accountable for the installation and commissioning of all earthing pits & its accessories, Fan accessories and handled the verification of circuit diagram provided by the company,looked after the installation and commissioning of transformer of 40 MVA rating & DG Set of 5 MVA rating and oversaw the main job like cable lying, terminations, etc