Senior Electrical Engineer


Last Updated: 11th December 2017 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Degree

Languages
Arabic, English, Hindi, Urdu

Summary

26 years Experience of Projects construction management ,Material Procurement, Construction of Fully automated GIS Sub stations, Power Generating Stations, Transmission and Distribution system, Project Site supervision, planning projects are implemented promptly on budget, , Project Monitoring & Coordination / liaising with principle designers/ consultants for Electrical, Mechanical and Civil Works of Power Projects, Handling Projects post tender to completion commissioning. Design review ,Preparation of Bidding Documents, Review Project Scope of work, cost and time control, technical specification, technical Auditing. Planning and monitoring maintenance program and equipment downtime to ensure optimal operational success. Preparing schedules and data sheets to meet changing needs . I did my engineering in 1988 and I am presently working as Assistant Executive Engineer / Asstt. Divisional Manager (Electrical) with J&K State Power Development Department -India in Procurement and Material Management wing

Education

PUNJAB UNIVERSITY CHANDIGARH
GRADUATE ELECTRICAL ENGINEER

   Oct 1984
— Dec 1988

DEGREE ELECTRONICS AND ELECTRICAL COMMUNICATION

Experience

Jammu and Kashmir Power Development Department Procurement and Material Management Wing
Project Manager for Procurement material management for Transmission and Distribution System upto 33KV Level

   May 2016
— Current

Prepare the Bidding Documents for the Turn-key Projects
Prepare the Documents for the Bidders' Prequalification
Techno -Commercial Evaluation of Tenders documents
Prepare the Evaluation Reports
Selection of Contractors
Participate in Contractual Negotiations with the Winning Contractors
Procurement and Material Management for Transmission and distribution system Factory Testing and Inspection of Material
Procurement and Material Management
Provided field engineering support during installation and commissioning

Renardet SA & Partners Consulting Engineers L.L.C. Oman
Senior Electrical - Hydropower Plant Engineer

   Apr 2015
— Apr 2016

Design Review, Preparation of Bidding Document, Preparation of Technical specification and related drawing, Review Project Scope of work, Executing project works schedules and data sheets to meet changing needs and requirements, assist the PMU during the Tender Period. Support in the Deliverables:
Design Review and technical specifications for:
Hydroelectric HPS equipment with auxiliary systems: full or partial replacement of the equipment and fractional repair.
Main switchboard, sub-station site and building of the HPS: the replacement of electrical equipment (including relay protection equipment)
The head node, pressure pool, penstock and downstream of the HPS building: replacement of mechanical equipment with a new one, repair of the saved mechanical equipment, replacement of the electrical part of crane equipment, seals, repair of the embedded parts.
Technical water supply, air supply, oil supply, and drainage and dewatering system
Electro-mechanical equipments/Switch gears/ electrical disconnect switches/ circuit breakers/Power Transformers and control/ protection system for 110 KV out door sub stations

NG Saudi Electricity Company WOA Jeddah
Project Manager/Senior Consultant (Electro-Mechanical Engineer)

   Apr 2009
— Apr 2014

Project construction Management, Supervision, Planning and monitoring from post tender to commissioning stage, Preparation of Technical specification and related drawing, Review Project Scope of work, Executing project works schedules and data sheets,Errection Installation,testing and final commissioning for:
• Electro-mechanical equipments/Switch gears/ electrical disconnect switches/ circuit breakers/Power Transformers and control/ protection system for Transmission and Distribution system for fully automated GIS sub stations .

Jammu and Kashmir Power Development Corporation(Govt Undertaking)
Asstt.Executive Engineer

   May 1990
— Mar 2009

Lead and manage construction, testing & commissioning activities for construction of 105 MW USHP-II,Hydro Power Generating Station (Electro Mechanical )Turbines and Generators,132 kv substation switchgear, 132 KV Transmission and Distribution system, power transformer, auxiliary systems. Witness all test for hydro generator and excitation system. Check all functional test for electrical system including: 11kv switchgear, IPB, GCB. Prepared ITP for doing test for electrical system. Take part to the dry and wet test including load test for Hydro Set and also when the unit work as a synchronous condenser

Search Jobs by Industry

Ad
Ad
Ad