LNG Commissioning, Start Up, Control Room and Lead Operator
Last Updated: 27th November 2018 (over 4 years ago)
Summary
Education
Diploma Engineering of Electronics
Jun 1994
— Jul 1997
Electronics
Jun 1989
— Jul 1992
Experience
Lead Operator
Jul 2017
— Sep 2018
- Optimize transition period from start up phase to normal operation phase.
- Conduct development training to operator trainees for support Angolanization program
- To plan, prepare & implement procedures for plant commissioning, test runs & normal operation.
LNG OSBL DCS Operator
Dec 2010
— Jul 2017
- Optimize transition period from start up phase to normal operation phase.
- Conduct development training to operator trainees for support Angolanization program.
Plant Operation Operator
Mar 2006
— Nov 2010
- Assist LNG train during shutdown activities in a safe manner. And assist DCS Operator as required.
- Actively involved in emergency drill.
- Directly involved for implements Electronic PTW Q4 (pilot project in Qatar Gas Company).
Power plant Operator
Nov 1997
— Mar 2006
- Report to Operation Supervisor, especially for abnormal condition of instrument.
- Control visual condition at site of all equipment.
- Monitoring Electrical measurement.
- Analyzing a failure to identify that investigation their cause.
- Checking progress of maintenance’s work.
- To plan, prepare & implement procedures for plant commissioning, test runs & normal production.