Planning Engineer or Project Control Engineer


Last Updated: 20th November 2018 (over 3 years ago)

Address
United Arab Emirates

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Hindi

Summary

9 Year experience (4 years as a PMC) in the field of Oil & Gas Industry includes Project Management, Engineering, Procurement, Project execution & site supervision of contractors (PMC).
Have depth knowledge of PMC Services, execution, engineering & site construction of EPC projects including Planning, Scheduling, and Project Controlling for Oil & Gas Pipeline (Onshore & Offshore), Petrochemical, Power and Industrial Plant sector.
Preparation of EPC WBS, Engineering, Construction, Procurement Schedule (Overall Master Schedule) in Primavera P6 latest Version (P6). Preparing and analysis of Progress Curves, Histograms, forecast report, Earn Value Management, On Schedule Status, variances of schedule (baseline & actual) & Indicators.
Proven expertise in manpower handling, document control management and competence in supervising, managing, directing and developing people in union and non-union environments.

Education

BBD
B.Tech Mechanical Engineering

   Jul 2007
— Jun 2010

Experience

Robt Stone LLC
Sr. Engineer Planning

   Aug 2018
— Current

 Engineering & Construction Services of Flow Line & Hader Line to Daleel Petroleum Oman, for Design & Construction Services for Well Hook-ups and Flow Line, consist of pipeline of 4, 6, 8 & 10 inch and combined length of 300 Kms. The project involves design & engineering, procurement, material management, construction contractor, commissioning and project close-outs.
 Preparing Progress Report (DPR, WPR, and MPR).
 Planning S-Curve Scheduling & Preparation of WBS.
 Resource allocation and mobilization of construction locations.
 Providing daily site planning for proper site execution with the controlling optimum required manpower and equipment’s deployment at site.
 Locking all safety requirements including permits and related safety documentation are included in the work order planning process.
 Locking all company and contractor manpower resources required to complete work order tasks are fully defined in both number and duration.
 Locking all materials, special tools and equipment as required to carry out the work order activities are fully defined in the planning process.
 Integration of rig and service company procedures into well program.
 Onshore operational support to completion and well intervention activities
 Preparation of time & cost estimates.
 Coaching and mentoring of junior team members.
 Perform post-job analysis and capture lessons learned
 Methodology preparation and approval for execution of major works at site.
 Monitoring of fabrication, NDT, Hydro-test, Roto lining, Internal coating & external painting of spools at fab-shop pertaining to piping jobs.
 Forecast Resource requirements (no’s) & Curves.
 Reporting to Client and generating status documents according to requirement.
 Progress monitoring, tracking, for all activities.
 Weekly target fixing for the contractors with respect to base schedule.
 Co-ordination to deployment of key equipment at site.
 Planning & execution of major shutdown works.
 Interaction with site team, project design team, client team & discipline contractors.
 Materials (inventory) follow-ups, consumption tracking, monthly material requirement and raising indents to purchase department.
 Coordination with PRO for NOC of electrical department, sewerage department for permission and clearance
 Quantity variation analysis (with assistance of site engineers) and material reconciliation.